Tender For Pipiganj Nagar Panchayat Water Supply Reorganization Scheme (Part-2), District-Gorakhpur., pipiganj-Uttar Pradesh

Uttar Pradesh Jal Nigam-UPJN has published Tender For Pipiganj Nagar Panchayat Water Supply Reorganization Scheme (Part-2), District-Gorakhpur.. Submission Date for this Tender is 23-12-2023. Tube Well Tenders in pipiganj Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41013030
Tender For Pipiganj Nagar Panchayat Water Supply Reorganization Scheme (Part-2), District-Gorakhpur.
Open Tender
Indian
Uttar Pradesh
pipiganj
23-12-2023

Tender Details

Tender For Pipiganj Nagar Panchayat Water Supply Reorganization Scheme ( Part-2 ) , District-Gorakhpur.; 2 Provideallmaterials, Labour, T&Petc. To Construct The Complete Pumphousesize ( 3.60X3.00X3.00M ) Cum Chlornatingroom ( 2.80 X1.50X3.00M ) As Per Type Design & Drawing ( 2 Nos. ) . 3 Excavation Ofearth Infoundationinordinary Soil ( Loam, Clay Orsand ) Includingliftupto1.50Mandleapupto50.00 M Refilling Of Excavated Earth In Tospace Betweenbuilding And Sidesoffoundationtrench, Watering, Rammingand Disposal Of Surplus Earth Up To 50 M From The Center Of The Trench. 4 Concretewith40mmgaugefirstclassbrickballast, Local Sandandcementinproportionof1:6:12Infoundation And Floors Including Supply Of All Materials, Labour, T&P Etc Required For Proper Completion Of Work. 5 Firstclassbrickworkin1:6Cementandcoarsesand Mortar Infoundationandplinthincludingsupplyofall Materials, Labour T&P Etc Required For Proper Completion Of Work. 6 25 Mm Thick Damp Proof Coarse With Cement , Stone Grit 12Mmandapprovedcoarsesand1:1.5:3Withand Including Water-Proofing Materials Asordered By The Engineer- Inchargeintheproportionasspecifiedbythe Manufactures, Alsoincludedbitumepainting ( 85 / 50Or 85 / 25 ) , Supplyofall Materials, Labourt&Pandtoolsand Plantsetcrequiredfor Propercompletionoftheworkand Includingpropercuring And Shuttering As Necessary. 7 Firstclassbrickworkin1:4Cementandcoarse Sand Mortar Insuperstructureincludingsupplyofallmaterials Labour T&P Etc Required For Proper Completion Of Work. 8 R.C.C.Workwithcementapprovedcoarsesandand20 Mm Gauge Approved Stone Ballast In The Proportion 1:2:4 In Lintelsofdoors, Windows&Sunshade Excluding Reinforcementanditsbendingbutincludingits Fixingand Bindingthesame24bwgwireinpositionwith Supplyall Materialslabourt&Petcrequiredforproper Completionof Work. 9 As In Item No. 1.07 Above But For Slab 10 Supplyandfixingof1mmthicksheetiron Panelled Door / Window / Ventilatorsshuttersincluding Frame, Supply &Fixingand Adjustmentofcleats, Stops, Hinges, Locks, Bolts, Handlers, Spring And Other Fittings. ( Excluding Suply Of Fittings ) . 11 1. Door With Frame ( 4 Nos. ) 12 2. Window With Frame ( 8 Nos. ) & Ventilator ( 4 Nos. ) 13 Supplyofoxidizedironfittingsofapprovedmakefor Doors And Window. 14 Mild Steel Or Plain Work Such As Reinforced Concrete Or Reinforcedbrickworkwroughttorequiredshape As Necessaryincludingbuildingforpropercompletionof Work Andincludingsupplyofsteelitswastagebendhooks And Authorized Over Lapping Shall Be Measuredfloor Towlevel. 15 25Mmthick ( 1:2:4 ) Plain Cementconcrete Floorwith Cement Coursesandand20mmgaugeapprovedstone Grit, Laidin Panels, Finishedwith3mmfloatingcoatof Neatcementor Cementandmarbledustinratioof1:5As Specifiedoverand Including75mmthickbaseconcrete Consistingofcement, Localsandand40mmgaugefirst Classbrickballastinthe Proportionof1:4:8Andremoving Anyoverlappingofmortar Atthejointsofpanelsifany Andgiventhemuniformfinish Includingsupplyofall Materials, Labourt&Petcrequired For Proper Completion Of Work. 16 40Mmthickcement Concreteflooring 1:2:4Laid Inone Layer Finishedwithafloatingcoatofneatcementwithoutbase Concrete. 17 Same As Item No 1.14 Above But 40 Mm Thick Over Base Concreteconsistingofcement, Localsandand40mm Gauge First Class Brick Ballast In The Proportion Of1:4:8. For Construction Of Apron 0.6 M Wide. 18 Firstclassbrickworkin1:4Cementandcoarse Sand Mortar Insuperstructureincludingsupplyofallmaterials Labour T&Petcrequiredforpropercompletionoffor Construction Of Apron 0.6 M Wide Work. 19 Supplyandfixingofr.C.C.Coverofsize0.80X0.80Meter Over Pump House Slab Opening Including Supply Of All Material Labour T&P Etc Complete. 20 12Mmthickplasterwithcementandcoarsesandmortar In Proportionof1:4Overbrickwork, Minimumthickness Notbe Lessthan10mmincludingsupplyofallmaterials Labour, T&P Etc Required For Proper Completion Of Work. 21 Same As Above But For Rough Face. 22 11.5Cmstringordrip-Coarsein1:6Cementandlocalsand Mortor. 23 Paintingorvarnishingnewironworkinsmallareasor New Woodworkwithoneprimingcoatandtwocoatsof Approved Paintsorvarnishincludingsupplyofallmaterials Labour, T&P Etc Required For Proper Completion Of Work. 24 Whitecementinthreecoatsincludingsupplyof All Materialslabour, T&Petcrequiredforproper Completionof Work. 25 Providingplasterofpariswallputtyof2mmthickness Over Plastered Surface To Prepare The Surface Even And Smooth Complete. 26 Distempering ( Twocoat ) Withoilbounddistemper Of Approved Brandand Manufacture ( Suchasberger, Apex Ultima ) & Ofrequired Shadeon Undercoated Wall Surface To Give An Even Shade Over & Includingaprimingcoat Withcementprimerofapproved Brand&Manufacturesuchasberger, J&N, Shalimar, Asian Paints After Thoroughly Brushing The Surface Free From Mortar Droppings&Otherforeignmatters&Alsoincluding Preparingthesurfaceevenwithplasterofparisor Approved Syntheticmaterial&Sandpaperedsmooth Includingcostof All Materials. 27 Supplyandfixingofrolledsteeljoistincludingcostofall Materials Labour, T&P Etc Complete. 28 Provideandfixingofr.C.C.Precastventilatorsjaliover Openingincludingsupplyofallmaterialslabour, T&Petc Complete. 29 Supplyandfixingof100mmdiacipiperainwaterdown Pipe With Clamp Etc. 30 Anti Termite Treatment 31 Site Clearance And Other Unforeseen Items. 32 Addextrafor0.5Mheightofplinthofpump House Due To Low Ground Level ( 78000X 0.5=39000 ) 33 Bye Pass Chamber 34 Rising Main And Bye Pass Arrangement 35 Supplyofthefollowingpipesincludingrailwayfreight, Insurance Charges F.O.R. Etc. Complete. 36 200Mm Dia D.I.Class K-9 37 From Tube Wellsto Ohtincludingbye Pass 38 Supply Of D.I.Specials For Theabove Pipe Lines 39 Carting, Laying And Jointing Of The Following Sizes Of Pipes Into The Trenches Including Cost Of All Jointing Materials, Labourandt&P, Testing Etc. Complete. 40 From Tube Wellsto Ohtincludingbye Pass 41 Earthworkinordinarysoilwithliftupto1.50Mand Leadupto 50M, Filling, Wateringandrammingof Excavatedearthintothetrenchesanddisposalofsurplus Earthupto 50 M. 42 Supplyandcartinguptositeof Workof Followingsizesof C.I.D / Fsluicevalvesasperi.S.780-1960Testedto10 Kg / Sqmfixinginpipelinetrenches, Jointingandtesting Complete. 43 200Mm Dia D.I.Class K-9 44 Supplyofallmaterials, Labour, T&Pandconstructionof Followingchambersaspertypedesignincludingsupply Andmaterials, Labour Andt&P, Testing Etc. Complete. 45 Masonry Type 46 Privision Of Thrust Block 47 200Mm Dia D.I.Class K-9 48 Dismantlingandreinstatementoffollowingtypeofroad Surfacesforlyingofpipelineincludingsortingoutof Serviceablematerialsanddisposalofunserviceable Materials. 49 Bituminous Road 50 C.C. Road 51 Interlocking Road 52 Boe Road 53 Crossingofroadforlayingpipelineincludingsupply Andmaterials Labour, T&P Etc. Complete. 54 Construction Of Oht 1100 Kl With 22 M Staging 55 Supply Of All The Materials, Labour T&P For Construction Of 1100 Kl Capacity / 22M Staging R.C.C. Over Head Tank ( Confirming To Is 3370 ( Part 1 ) : 2009, Is 3370 ( Part 2 ) : 2009, Is 3370 ( Part 3 ) : 1967, Is 3370 ( Part 4 ) : 1967 Specification ) Along With Main Components, Including Cost Of Soil Testing And Making Made-Up G.L. 40 Cm Above From Adjoining Road At The Available Site. Allcomponents Of Oht Willbe Casted In M-30 Concrete Withcement, Coarsesand And Approvedstonegritasperi.S.11682Andi.S.456Oritslatestrevision.Minimumdepthof Foundationbeloworiginalgroundlevelwillbe2.0M.Seismiceffectsandwindloadshouldbe Taken Into Consideration As I.S. 1893 For Earthquake Resistance And I.S. 875 Part-Iii For Wind Load On Structure.The Assumed Bearing Capacity Of Soil Has Been Taken As 8 M.T. Sqm. 1M Wide Rcc Dog Legged Stair Case From Ground Level To Balcony With Two Separate Columns With Proper Covered M.S. Gate And Wiremesh From 1St Landing To 2Nd Landing Of Stair Case . M.S. Ladder Made Of 50 X 50 X 6 Mm Angle Section And 20 Mm Plain M.S. Bars ( Specification Of M.S. Should Be As Per Is 800-2007 ) With Hand Rails Of 20 Mm Medium Class G.I. Pipes On Both Sides In Three Rows From Balcony To Be Top Dome Resting On An Rcc Plateform ( 75 X 75 Cm And 10 Cm Thick ) Projecting From Top Ring Beam And One Alluminimum Ladder Inside The Tank Body ( From Manhole In Top Dome To Bootom Dome ) .1 M Wide Rcc Balcony Around The Tank At The Junction Point Of Vertical Wall And Conical Wall. Proper R.C.C. Railing And 20 Mm Dia Medium Class G.I. Pipe ( In 3 Rows ) On Both Sides Of Stair Case, Around The Balcony At Each Landing From Landing With Top Ring Beam Up To Manhole On The Top Dome And At The Periphery. The G.I. Pipes Will Be Supported On R.C.C. Posts Of 100 Mm Dia Or On The Posts Made Of 50 X 50 X 6 Mm M.S. Angle Section, Spaced At Intervals Not More Than 1.5 M. Proper Ventilator At Top Dome In Circularshapeof1.2Mdiaalongwithanr.C.C.Coverofminimum1.50Mdiaand7.5Cm Thickness, Pillar Of Ventilator Should Be Minimum 50 Cm Dia. The Space Between Top Dome And R.C.C.Covershouldbecoveredwithmosquitonetofstandardqualityalongwithexpended Mantled Jail, Providing 20 Mm Medium Class G.I. Pipes ( In 3 Rows ) Railing At Top Dome Along With Post Also, Supply & Installation Of Digital Water Level Indicator Including All Accessories.Lightening Conductor As Per I.S.S. 2309 Of Its Latest Amendments Of Latest Electricity Rules. It Should Consist Proper Elevation Rod With 5 Of More Fork Points Proper Down Conductors Of Prescribed Mental Of Proper Size Prescribed By Iss 2309-1969 And Iss 3013-1966. C.I. Manhole Of Min 60 X 60 Cm Size Made Of M.S. Channel Section With Adequate Cover Made Of M.S. Sheet Of Minimum3 Mm Thickness Hinged With Lockning Arrangement. The Manhol Should Be Fixed At Top Dome Atproper Place. 56 Supply And Fixing, Jointing Of Following Size Of D.I. D / F Pipes With D.I. D / F Specials Conforming To Is 8329 / 2000Asverticalpipesforinlet, Outlet, Overflowandwashoutasperlatest / Relevanti.S. Specifications With All Jointing Materials For Proper Completion Of Work Including Other Appurtenant Work And Excavation In All Types Of Soil For Inletpipe 200 Mm ( 2 Nos ) , Outlet Pipe 350 Mm, Overflow Pipe 200 Mm &Washout Pipe 100 Mm, Supply And Fixing Of Following Sizes C.I. D / F Sluice Valves Withactuator Operatedasperi.S.S.700 / 1969Oritslatestspecification, Pressure 10Kg / Sqcm Including Carting From Thestoretothesiteofwork, Loweringthem Intotrenches, Fixinginposition&Testingetc. Complete. For Inletpipe 200 Mm - 2 Nos., For Outlet Pipe 350 Mm- 1 No., For Washout Pipe 100 Mm - 1 No.. Construction Of Bed Blocks In 1:2:4 Pcc With Cement, Coarse Sand And Approved Stonegritundereachduckfootbendtosupporttheverticalpipes.Thesebedblocksshould Support On The Raft And Not On The Soil. Construction Of Masonary Type Sluice Valve Chamber For Abovesluicevalvesasperdepartmentaltypedesignanddrawingincludingsupplyand Fixing Of 150 Mm X 150 Mm Size C.I. Surface Box Including Locking Arrangement. Construction Of Washout / Overflow Chamber As Per Departmental Type Design And Drawing. Construction Of P.C.C. Floor&Drainandallothernecessaryworkasperdepartmentaltypedrawinganddesign.All Exteriorsurfaceofohttobegiventhreecoatsofapprovedexteriorweather Resistantpaintsuchas Berger / Narolac / Asian / Apex Ultima To Give A Smooth And Even Shade Including Painting Of The Pipesystemaboveapronlevelalongwiththeclampsinthreecoatswithapprovedsynthetic Paints. Including Supply Of All Labour Material T & P Necessory Scafolding Etc. Complete. Testing & Commission Etc. All Complete Work. Testing Of Bearing Capacity Of Soil From A Reorganized Govt. Engineering Collage / Institute. 57 Distribution System 58 Excavationforpipelinetrenchesinordinary Soil, ( Lime, Clayorsandincludingliftupto1.5Mand Leadupto50mandrefilling, Watering, Rammingof Excavated Earth In To Trenches Anddisposal Of Surplus Earthupto50mfromthecenterofthefoundation Trenches. 59 Supplyofthefollowingsizesofpipesconfirmingto I.S.4984:1995, I.S.-8329 / 2000Latest Relevantofi.S.S. With Couplers Etc Complete In All Respect F.O.R. Destination Including All Taxes And Insurance. 60 Hdpe Pipe Pn-6 ( O.D. ) Pe-100 61 90 Mm Dia 62 110 Mm Dia 63 140 Mm Dia 64 160 Mm Dia 65 200 Mm Dia 66 Di Pipe K-7 67 250 Mm Dia 68 300 Mm Dia 69 350 Mm Dia 70 Addition ( Di K-7 ) Pipe For Connecting Overflow To Main Supply 71 200 Mm Dia 72 Supplyofspecialsforabovepipef.O.Rdestination Including All Taxes And Insurance. 73 Hdpe Pipe Pn-6 ( O. D. ) Pe-100 -5% Of Item No. ( 1.60 To 1.64 ) 74 Di Pipe K-7 - 10% Of Item No. ( 1.66 To 1.68 ) 75 Di Pipe K-7 10% Of Item No. ( 1.70 ) 76 Cartingfromthestore ( Upto8km. ) Thefollowing Sizesofpipeandspecialstothesiteofwork Lowering Themintotrenchesandlayingtrue Toalignmentand Gradient Includingjointing From Electro-Fusion Machine, Testing Of Pipeline And Includingsupplyofjointingmaterialsuchasnut& Bolts, Rubberinsertion, Whiteleadetc.Complatebut Excludingcostoftrenchingandcuttingofpipesetc. For Making Of Lengths But Including Making Joints. 77 Hdpe Pipe Pn-6 ( O. D. ) Pe-100 78 90 Mm Dia 79 110 Mm Dia 80 140 Mm Dia 81 160 Mm Dia 82 200 Mm Dia 83 Di Pipe K-7 84 250 Mm Dia 85 300 Mm Dia 86 350 Mm Dia 87 Addition ( Di K-7 ) Pipe For Connecting Overflow Tomain Supply 88 200 Mm Dia 89 Supplyoffollowingtypesoffittingsincluding Railwaysfreight, Cartageuptostore, Alltaxesand Duties Complete. 90 C.I.Doubleflangedsluice / Scourvalvesasperi.S. 780 / 1969Class-1Workingpressure10kg / Sqmf.O.R Destination Including All Taxes And Insurance. 91 C.I.Doubleflangedsluicevalves 92 80 Mm 93 250 Mm 94 300 Mm 95 350 Mm 96 Scourvalves 97 80 Mm Dia 98 Airvalves 99 25 Mm 100 Fire Hydrants 101 80 Mm 102 Supplyofallmaterials, Labourt&Petc.Requiredand Constructionoffollowingchambersas Pertypedesign Including Supply And Materials Labour, T & P Etc. Complete. 103 Surface Box Type 104 Masonry Type 105 Air Valves 106 Fire Hydrants 107 Thrust Block 108 Dismantling Of Following Type Of Surface Including Sortingoutandstakingofserviceablematerialsof Disposal Of Unserviceable Materials Up To Adistance Of 50 M. 109 B.O.E. Road 60% Old Bricks 110 Bituminous Road 111 Cc Road 112 Inter Locking Road 113 Reinstatementoffollowingtypeofsurfaceincluding Sortingoutandstakingofserviceablematerialsof Disposal Of Unserviceable Materials Up To Adistance Of 50 M. 114 B.O.E. Road 60% Old Bricks 115 Bituminous Road 116 Cc Road 117 Inter Locking Road 118 Supplyofallmaterials, Labourt&Petc.Requiredand Constructs Single Tap Pillar Type Stand Post As Per Type Design. 119 Crossing Of Culvert For Laying Pipe Line Including Supply And Materials Labour, T&P Etc. Complete. 120 Crossingofnala / Drainforlayingpipelineincluding Supply And Materials Labour, T&P Etc. Complete. 121 Crossingof Roadfor Layingpipe Lineincludingsupply And Materials Labour, T&P Etc. Complete. 122 3.5 M Wide Road 123 7.0 M Wide Road 124 Provision Forlayingofpipelinebytrenchless Technology Including Supply Of Different Sizes M.S. Casing Pipe, Labour T&P Etc. Required For Proper Completion Of The Work. 125 200 Mm 126 250 Mm 127 300 Mm 128 350 Mm 129 Provisionofhouseconnectionincludingsupplyofall Materials, Labours , T&P, Road Cutting & Reinstatementetc.Requiredforproper Completion Of Work. 130 In B.O.E. Roads 131 For 90 Mm To 110 Mm Dia 132 In Bituminous Roads 133 For 90 Mm To 110 Mm Dia 134 For 140 Mm To 160 Mm Dia 135 For 200 Mm To 250 Mm Dia 136 For 300 Mm To 350 Mm Dia 137 In C.C. Roads 138 For 90 Mm To 110 Mm Dia 139 For 140 Mm To 160 Mm Dia 140 In C.C. Interlocking Tiles Roads 141 For 90 Mm To 110 Mm Dia 142 For 200 Mm To 250 Mm Dia 143 In Earthen Roads 144 For 90 Mm To 110 Mm Dia 145 For 300 Mm To 350 Mm Dia 146 Construction Of Half Set ( Single Room ) Staff Quarter 147 Excavationinfoundationinordinarysoil ( Loam, Clay, And / Or Sand ) Including Lift Up To 1.5Mand Leap Up To 50M Refilling, Watering, Andrammingofexcavatedearth Into Thetrenchesorintothespacebetweenthebuilding And Sidesoffoundationtrenches, Orintotheplinth And Disposalofsurplusearthuptoadistanceof50m Fromthe Center Of The Foundation Trenches. 148 Concretewith40mmgaugebrickballast, Localsand And Cement In Proportion Of 1:6:12 In Foundation Including Supply Of All Materials, Labour, T&P Etc Required For Proper Completion Of Work. 149 First Class Brick Work In 1:6 Cement And Local Sand Mortarinfoundationandplinthincludingsupplyofall Materials, Labourt&Petcrequiredforproper Completion Of Work. 150 25Mmthickdampproofcoarsewithcement, Stonegrit 12Mmandapprovedcoarsesand1:1.5:3With And Includingwater-Proofingmaterialsasorderedby The Engineer-Inchargeinthe Proportionasspecifiedby The Manufactures, Also Included Bitume Painting ( 85 / 50 Or 85 / 25 ) , Supplyofallmaterials, Labourt&Pand Toolsand Plantsetcrequiredforpropercompletionof Theworkand Including Proper Curing And Shuttering As Necessary. 151 Sandfillinginthefoundationincludingsupplyoflabour Material , T&P Etc . 152 Istclassbrickworkin1:4Cementandlocalsand Mortar Insuperstructureincludingsupplyofallmaterial, Labour, T&P Etc Required For Proper Completion Of The Work. ( Thickness Of Wall To One Brick Thick ) . 153 12 Mm Thick Plaster With Cement And Sand Mortar Inproportionof1:6Overbrickwork, Minimumthickness Not Be Less Than 10Mm , Including Supply Of All Materials, Labour , T&P Etc For Proper Completion Of Work. 154 20Mmthickcementplaster, Indadoorskirtingwith Cement And Coarse Sand Mortar 1:2 Laid In Panels And Finished With 3Mmfloating Coat Of Neat Cement Or 1:5 Cementandmarbledust, Includingsupplyofall Materials, Labour , T&P Etc For Proper Completion Of Work. 155 Sameasitemno2.52Butinproportion1:4Withcement And Local Sand Mortar, Over Ceiling. 156 Struck Pointing In Cement Mortar 1:2 With Colouring Material To Match With The Brickwork Colour Including Supply Of All Materials , Labour, T&P Etc Required For Proper Completion Of Work. 157 R.C.C.Workwithcementapprovedcoarsesandand20 Mm Gaugeapproved Stoneballast In The Proportion 1:1.5:3Inlintelsofdoors, Windows&Sunshadeexcluding Reinforcementanditsbendingbutincludingits Fixingand Bindingthesame24bwgwireinposition Withsupply Allmaterialslabourt&P Etcrequired Forproper Completion Of Work. 158 Mildsteelorironworkinplainworksuchasrccor Rbwork ( When Not Included In Overall Rates ) Brought To Requiredshapeasnecessary, Including Bendingand Supply Of Steel And Wastage For Completion Of Work 159 Supplyandfixingofmsangleironchaukhatsof 40X40x6mmsizeincludingsimoemouldingstraightwork Asinchaukhatsandalsosupplyofallmaterials, Labour, T&P Etc Required For Proper Completion Of Work. 160 Supplyandfixholdfastindoorsandwindows Chaukhats 25Cmx50mmx6mm Flat Iron Including Their Cutting, Moulding, Welding To Requirwed Shape Also Including Othermaterialssuchasnailsandscrews Etcrequiredin All Aspect To Complete The Work. 161 Mild Steel Grill In Windows Wrought To Required Form, Including Supply Of Labour, Steel , T&P Etc For Proper Completion Of Work. 162 25 Mm Thick ( 1:2:4 ) Plain Cement Concrete Floor With Cementcoursesandand20mmgaugestone Ballast, Laid In Panels, Finished With 3 Mm Floating Coat Of Neat Cementorcementandmarbledust In Ratio1:5As Specified, Andremovingany Overlappingormortaratthe Jointsofpanelsifanyand Givingthemuniformfinish, Includingsupplyofall Materials, Labour, T&Petc. Requiredforproper Completionofthework.Including75 Mmthickbase Concreteconsistingofcement, Localsand Andfirstclass Brickballast40mmgaugeinproportionof 1:4:8 Including Supply Of All Materials, Labour T&P Etc Required For Proper Completion Of Work. 163 Sameasitemno2.61Abovebut40mmthickoverbase Concrete Consisting Of Cement, Local Sand And 40 Mm Gaugefirstclassbrickballastintheproportionof 1:4:8. For Construction Of Apron 0.6 M Wide. 164 First Class Brick Work In 1:4 Cement And Local Sand Mortarinsuperstructureincludingsupplyofall Materials Labour T&P Etc Required For Proper Completion Of For Construction Of Apron 0.6 M Wide Work. 165 Supply Of 40 Mm Thick Sheesham Wood Door / Window Shutters With 9 Mm Thick Plywood Or Pressed Wood Pannels And Fixing Cleats, Stops, Hinges, Locks, Bolts, Handlers, Springandotherfittings. ( Excludingsuplyof Fittings ) . 166 Supply And Fixing Of Oxidized Iron Fittings Of Approved Make For Doors And Windows. 167 Paintingorvarnishingnewironworkornewwood Work In Small / Largeareas With Onecoatprimingand Two Coat Of Approvedpaintorvamishinclduingsupply Ofall Materials, Labourt&Petc.Completerequiredfor Proper Completion Of The Work. 168 White Washing In Three Coat Including Supply Of All Materials, Labour, T&Petc.Completerequiredforproper Completion Of The Work 169 Providingplasterofpariswallputtyof2mmthickness Over Plastered Surface To Prepare The Surface Even And Smooth Complete. 170 Finishingwallswithoilbaseddistemperpaintof Approvedmakeandqualityoveroneprimingonnew Work Withtwocoatstogivenanevenshadeincluding Supplyof Allmaterials, Labourt&Petcrequired Forproper Completion Of Work. 171 Provideallmaterial, Labour, T&Petc.Andconstruct100 Mmdiasemicircularc.C.Covereddraininclduing Rendering The Surface Smooth With Neat Cement. 172 Supply Of All Materials, Labour, T&P Etc And Construct Inspection Chamber As Per Type Design And Drwaing. 173 Supplying, Carting, Laying, Jointing, Fixingandtestingof ( 1 / 2 -1 Inch ) Cpvc Screwed Pipe With Specials And Fittingsinclduingcuttingholesinmasonryandmaking Good The Walls, Fixing Clamps Wherever Necessary Etc. Complete Including Cost Of White Lead, Hemps, Oil, Etc. 174 Supplyofallmaterial, Labour, T&Petcfixingofwater Tap Required For Proper Completion Of The Work. 175 Supplyofallmaterial, Labour, T&Petcfixingoffloat Valverequired For Proper Completion Of The Work. 176 Supplyandfixingof110mmdiapvcpipefromutrap Toseptic Tank Including Supply Of All Special Materials Required For Proper Completion Of The Work. 177 Provisionforinternalelectrification Includingsupplyof All Materials, Labour, T&P Etc. Complete. 178 Supplyandfix110mmdiaacdownpipewithrose Heads, Bends, Gratingswithnecessarymsclamps25mmx 3Mm Fixed With Walls Including Supply Of150mm Long , 6Mm Dia Nails Including Supply Of All Materials , Labour Etc For Proper Completion Of Work. 179 20Mmthickcementplaster, Indadoorskirtingwith Cement And Coarse Sand Mortar 1:2 Laid In Panels And Finished With 3Mmfloating Coat Of Neat Cement Or 1:5 Cementandmarbledust, Includingsupplyofall Materials, Labour , T&P Etc For Proper Completion Of Work. 180 Constructionofseptictankandsoakpitincludingsupply Of Materials Labour Etc Complete. 181 Supplyandfixofposition500litrecapacity Pvc ( Sintex Or Other Approved Make ) Storage Tank. 182 Supply And Fix Indian Type Latrine Seat With U-Trap Includingsupplyofallmaterials, Labour, T&Petc. Required For Proper Completion Of The Work. 183 Provision For Electrification Inside And Outside Of The Quarter. 184 Site Clearance And Other Unforeseen Items. 185 Add Extra For 0.5M Height Of Plinth Than The Departmentaltypedesignduetolowgroundlevel ( 125000 X 0.5=62500 ) 186 Construction Of Boundary Wall, Gate, Site Development And Approach Raod 187 Provideallmaterials;Labour T&P Etc. For The Boundary Wall As Per Direction Of Engineer-In-Charge. 188 Add For Extra 0.5M Plinth Raisingofboundrywalldue To Low Lying Water Campus ( 2040 X 0.5 = 1020 ) 189 Provideallmaterials, Labour T&Petc.Requiredforproper Completion Of Work And Constructpillarsaspertype Designandfixingofgate3.6 M Wide Gate. 190 Provideallmaterials, Labour T&Petc.Requiredforproper Completion Of Work And Construct Tilesapproach Road. 191 Constructionofdrainasper Typedesigninallmaterials, Labourt&Petc.Requiredfor Propercompletionofwork Insidecampousforproper Drainage. Size ( 300 Mm X 300 Mm ) . 192 Provision Of Lighting In Campousas Perdirection Of Engineer-In-Chargeincluding Allmaterials, Labourt&Petc Complete. 193 Provision Of Land Escapping Andarboricultureincampous Asperdirectionofengineer-In-Chargeincludingall Materials, Labourt&Petc Complete. 194 Provideallmaterials, Labour T&Petc.Requiredforproper Completionofworkincluding Leveling, Dressingexcavation And Filling Of Earth Where Necessary For Develop Of Water Works Site Including Carriage Of Earth. 195 Zone-6 196 Provideallmaterials, Labour, T&Petc. To Construct The Complete Pumphousesize ( 3.60X3.00X3.00M ) Cum Chlornatingroom ( 2.80 X1.50X3.00M ) As Per Type Design & Drawing ( 2 Nos. ) . 197 Excavation Ofearth Infoundationinordinary Soil ( Loam, Clay Orsand ) Includingliftupto1.50Mandleapupto50.00 M Refilling Of Excavated Earth In Tospace Betweenbuilding And Sidesoffoundationtrench, Watering, Rammingand Disposal Of Surplus Earth Up To 50 M From The Center Of The Trench. 198 Concretewith40mmgaugefirstclassbrickballast, Local Sandandcementinproportionof1:6:12Infoundation And Floors Including Supply Of All Materials, Labour, T&P Etc Required For Proper Completion Of Work. 199 Firstclassbrickworkin1:6Cementandcoarsesand Mortar Infoundationandplinthincludingsupplyofall Materials, Labour T&P Etc Required For Proper Completion Of Work. 200 25 Mm Thick Damp Proof Coarse With Cement , Stone Grit 12Mmandapprovedcoarsesand1:1.5:3Withand Including Water-Proofing Materials Asordered By The Engineer- Inchargeintheproportionasspecifiedbythe Manufactures, Alsoincludedbitumepainting ( 85 / 50Or 85 / 25 ) , Supplyofall Materials, Labourt&Pandtoolsand Plantsetcrequiredfor Propercompletionoftheworkand Includingpropercuring And Shuttering As Necessary. 201 Firstclassbrickworkin1:4Cementandcoarse Sand Mortar Insuperstructureincludingsupplyofallmaterials Labour T&P Etc Required For Proper Completion Of Work. 202 R.C.C.Workwithcementapprovedcoarsesandand20 Mm Gauge Approved Stone Ballast In The Proportion 1:2:4 In Lintelsofdoors, Windows&Sunshade Excluding Reinforcementanditsbendingbutincludingits Fixingand Bindingthesame24bwgwireinpositionwith Supplyall Materialslabourt&Petcrequiredforproper Completionof Work. 203 As In Item No. 3.01 Above But For Slab 204 Supplyandfixingof1mmthicksheetironpanelled Door / Window / Ventilatorsshuttersincluding Frame, Supply &Fixingand Adjustmentofcleats, Stops, Hinges, Locks, Bolts, Handlers, Spring And Other Fittings. ( Excluding Suply Of Fittings ) . 205 1. Door With Frame ( 4 Nos. ) 206 2. Window With Frame ( 8 Nos. ) & Ventilator ( 4 Nos. ) 207 Supplyofoxidizedironfittingsofapprovedmakefor Doors And Window. 208 Mild Steel Or Plain Work Such As Reinforced Concrete Or Reinforcedbrickworkwroughttorequiredshape As Necessaryincludingbuildingforpropercompletionof Work Andincludingsupplyofsteelitswastagebendhooks And Authorized Over Lapping Shall Be Measuredfloor Towlevel. 209 25Mmthick ( 1:2:4 ) Plain Cementconcrete Floorwith Cement Coursesandand20mmgaugeapprovedstone Grit, Laidin Panels, Finishedwith3mmfloatingcoatof Neatcementor Cementandmarbledustinratioof1:5As Specifiedoverand Including75mmthickbaseconcrete Consistingofcement, Localsandand40mmgaugefirst Classbrickballastinthe Proportionof1:4:8Andremoving Anyoverlappingofmortar Atthejointsofpanelsifany Andgiventhemuniformfinish Includingsupplyofall Materials, Labourt&Petcrequired For Proper Completion Of Work. 210 40Mmthickcement Concreteflooring 1:2:4Laid Inone Layer Finishedwithafloatingcoatofneatcementwithoutbase Concrete. 211 Same As Item No 10 Above But 40 Mm Thick Over Base Concreteconsistingofcement, Localsandand40mm Gauge First Class Brick Ballast In The Proportion Of1:4:8. For Construction Of Apron 0.6 M Wide. 212 Firstclassbrickworkin1:4Cementandcoarse Sand Mortar Insuperstructureincludingsupplyofallmaterials Labour T&Petcrequiredforpropercompletionoffor Construction Of Apron 0.6 M Wide Work. 213 Supplyandfixingofr.C.C.Coverofsize0.80X0.80Meter Over Pump House Slab Opening Including Supply Of All Material Labour T&P Etc Complete. 214 12Mmthickplasterwithcementandcoarsesandmortar In Proportionof1:4Overbrickwork, Minimumthickness Notbe Lessthan10mmincludingsupplyofallmaterials Labour, T&P Etc Required For Proper Completion Of Work. 215 Same As Above But For Rough Face. 216 11.5Cmstringordrip-Coarsein1:6Cementandlocalsand Mortor. 217 Paintingorvarnishingnewironworkinsmallareasor New Woodworkwithoneprimingcoatandtwocoatsof Approved Paintsorvarnishincludingsupplyofallmaterials Labour, T&P Etc Required For Proper Completion Of Work. 218 Whitecementinthreecoatsincludingsupplyof All Materialslabour, T&Petcrequiredforproper Completionof Work. 219 Providingplasterofpariswallputtyof2mmthickness Over Plastered Surface To Prepare The Surface Even And Smooth Complete. 220 Distempering ( Twocoat ) Withoilbounddistemper Of Approved Brandand Manufacture ( Suchasberger, Apex Ultima ) & Ofrequired Shadeon Undercoated Wall Surface To Give An Even Shade Over & Includingaprimingcoat Withcementprimerofapproved Brand&Manufacturesuchasberger, J&N, Shalimar, Asian Paints After Thoroughly Brushing The Surface Free From Mortar Droppings&Otherforeignmatters&Alsoincluding Preparingthesurfaceevenwithplasterofparisor Approved Syntheticmaterial&Sandpaperedsmooth Includingcostof All Materials. 221 Supplyandfixingofrolledsteeljoistincludingcostofall Materials Labour, T&P Etc Complete. 222 Provideandfixingofr.C.C.Precastventilatorsjaliover Openingincludingsupplyofallmaterialslabour, T&Petc Complete. 223 Supplyandfixingof100mmdiacipiperainwaterdown Pipe With Clamp Etc. 224 Anti Termite Treatment 225 Site Clearance And Other Unforeseen Items. 226 Addextrafor0.5Mheightofplinthofpump House Due To Low Ground Level ( 78000X 0.5=39000 ) 227 Bye Pass Chamber 228 Rising Main And Bye Pass Arrangement 229 Supplyofthefollowingpipesincludingrailwayfreight, Insurance Charges F.O.R. Etc. Complete. 230 150Mm Dia D.I.Class K-9 231 From Tube Wellsto Ohtincludingbye Pass 232 Supply Of D.I.Specials For Theabove Pipe Lines 233 Carting, Laying And Jointing Of The Following Sizes Of Pipes Into The Trenches Including Cost Of All Jointing Materials, Labourandt&P, Testing Etc. Complete. 234 From Tube Wellsto Ohtincludingbye Pass 235 Earthworkinordinarysoilwithliftupto1.50Mand Leadupto 50M, Filling, Wateringandrammingof Excavatedearthintothetrenchesanddisposalof Surplus Earthupto 50 M. 236 Supplyandcartinguptositeof Workof Followingsizesof C.I.D / Fsluicevalvesasperi.S.780-1960Testedto10 Kg / Sqmfixinginpipelinetrenches, Jointingandtesting Complete. 237 150Mm Dia D.I.Class K-9 238 Supplyofallmaterials, Labour, T&Pandconstructionof Followingchambersaspertypedesignincludingsupply Andmaterials, Labour Andt&P, Testing Etc. Complete. 239 Masonry Type 240 Privision Of Thrust Block 241 150Mm Dia D.I.Class K-9 242 Dismantlingandreinstatementoffollowingtypeofroad Surfacesforlyingofpipelineincludingsortingoutof Serviceablematerialsanddisposalofunserviceable Materials. 243 Bituminous Road 244 C.C. Road 245 Interlocking Road 246 Boe Road 247 Crossingofroadforlayingpipelineincludingsupply Andmaterials Labour, T&P Etc. Complete. 248 Construction Of Oht 650 Kl With 20 M Staging 249 Supply Of All The Materials, Labour T&P For Construction Of 650 Kl Capacity / 20M Staging R.C.C. Over Head Tank ( Confirming To Is 3370 ( Part 1 ) : 2009, Is 3370 ( Part 2 ) : 2009, Is 3370 ( Part 3 ) : 1967, Is 3370 ( Part 4 ) : 1967 Specification ) Along With Main Components, Including Cost Of Soil Testing And Making Made-Up G.L. 40 Cm Above From Adjoining Road At The Available Site. Allcomponents Of Oht Willbe Casted In M-30 Concrete Withcement, Coarsesand And Approvedstonegritasperi.S.11682Andi.S.456Oritslatestrevision.Minimumdepthof Foundationbeloworiginalgroundlevelwillbe2.0M.Seismiceffectsandwindloadshouldbe Taken Into Consideration As I.S. 1893 For Earthquake Resistance And I.S. 875 Part-Iii For Wind Load On Structure.The Assumed Bearing Capacity Of Soil Has Been Taken As 8 M.T. Sqm. 1M Wide Rcc Dog Legged Stair Case From Ground Level To Balcony With Two Separate Columns With Proper Covered M.S. Gate And Wiremesh From 1St Landing To 2Nd Landing Of Stair Case . M.S. Ladder Made Of 50 X 50 X 6 Mm Angle Section And 20 Mm Plain M.S. Bars ( Specification Of M.S. Should Be As Per Is 800-2007 ) With Hand Rails Of 20 Mm Medium Class G.I. Pipes On Both Sides In Three Rows From Balcony To Be Top Dome Resting On An Rcc Plateform ( 75 X 75 Cm And 10 Cm Thick ) Projecting From Top Ring Beam And One Alluminimum Ladder Inside The Tank Body ( From Manhole In Top Dome To Bootom Dome ) .1 M Wide Rcc Balcony Around The Tank At The Junction Point Of Vertical Wall And Conical Wall. Proper R.C.C. Railing And 20 Mm Dia Medium Class G.I. Pipe ( In 3 Rows ) On Both Sides Of Stair Case, Around The Balcony At Each Landing From Landing With Top Ring Beam Up To Manhole On The Top Dome And At The Periphery. The G.I. Pipes Will Be Supported On R.C.C. Posts Of 100 Mm Dia Or On The Posts Made Of 50 X 50 X 6 Mm M.S. Angle Section, Spaced At Intervals Not More Than 1.5 M. Proper Ventilator At Top Dome In Circularshapeof1.2Mdiaalongwithanr.C.C.Coverofminimum1.50Mdiaand7.5Cm Thickness, Pillar Of Ventilator Should Be Minimum 50 Cm Dia. The Space Between Top Dome And R.C.C.Covershouldbecoveredwithmosquitonetofstandardqualityalongwithexpended Mantled Jail, Providing 20 Mm Medium Class G.I. Pipes ( In 3 Rows ) Railing At Top Dome Along With Post Also, Supply & Installation Of Digital Water Level Indicator Including All Accessories.Lightening Conductor As Per I.S.S. 2309 Of Its Latest Amendments Of Latest Electricity Rules. It Should Consist Proper Elevation Rod With 5 Of More Fork Points Proper Down Conductors Of Prescribed Mental Of Proper Size Prescribed By Iss 2309-1969 And Iss 3013-1966. C.I. Manhole Of Min 60 X 60 Cm Size Made Of M.S. Channel Section With Adequate Cover Made Of M.S. Sheet Of Minimum3 Mm Thickness Hinged With Lockning Arrangement. The Manhol Should Be Fixed At Top Dome Atproper Place. 250 Supply And Fixing, Jointing Of Following Size Of D.I. D / F Pipes With D.I. D / F Specials Conforming To Is 8329 / 2000Asverticalpipesforinlet, Outlet, Overflowandwashoutasperlatest / Relevanti.S. Specifications With All Jointing Materials For Proper Completion Of Work Including Other Appurtenant Work And Excavation In All Types Of Soil For Inletpipe 150 Mm ( 2 Nos ) , Outlet Pipe 300 Mm, Overflow Pipe 150 Mm &Washout Pipe 100 Mm, Supply And Fixing Of Following Sizes C.I. D / F Sluice Valves Withactuator Operatedasperi.S.S.700 / 1969Oritslatestspecification, Pressure 10Kg / Sqcm Including Carting From Thestoretothesiteofwork, Loweringthem Intotrenches, Fixinginposition&Testingetc. Complete. For Inletpipe 150 Mm - 2 Nos., For Outlet Pipe 300 Mm- 1 No., For Washout Pipe 100 Mm - 1 No.. Construction Of Bed Blocks In 1:2:4 Pcc With Cement, Coarse Sand And Approved Stonegritundereachduckfootbendtosupporttheverticalpipes.Thesebedblocksshould Support On The Raft And Not On The Soil. Construction Of Masonary Type Sluice Valve Chamber For Abovesluicevalvesasperdepartmentaltypedesignanddrawingincludingsupplyand Fixing Of 150 Mm X 150 Mm Size C.I. Surface Box Including Locking Arrangement. Construction Of Washout / Overflow Chamber As Per Departmental Type Design And Drawing. Construction Of P.C.C. Floor&Drainandallothernecessaryworkasperdepartmentaltypedrawinganddesign.All Exteriorsurfaceofohttobegiventhreecoatsofapprovedexteriorweather Resistantpaintsuchas Berger / Narolac / Asian / Apex Ultima To Give A Smooth And Even Shade Including Painting Of The Pipesystemaboveapronlevelalongwiththeclampsinthreecoatswithapprovedsynthetic Paints. Including Supply Of All Labour Material T & P Necessory Scafolding Etc. Complete. Testing & Commission Etc. All Complete Work. Testing Of Bearing Capacity Of Soil From A Reorganized Govt.Engineering Collage / Institute. 251 Distribution System 252 Excavationforpipelinetrenchesinordinary Soil, ( Lime, Clayorsandincludingliftupto1.5Mand Leadupto50mandrefilling, Watering, Rammingof Excavated Earth In To Trenches Anddisposal Of Surplus Earthupto50mfromthecenterofthefoundation Trenches. 253 Supplyofthefollowingsizesofpipesconfirmingto I.S.4984:1995, I.S.-8329 / 2000Latest Relevantofi.S.S. With Couplers Etc Complete In All Respect F.O.R. Destination Including All Taxes And Insurance. 254 Hdpe Pipe Pn-6 ( O.D. ) Pe-100 255 90 Mm Dia 256 110 Mm Dia 257 140 Mm Dia 258 160 Mm Dia 259 200 Mm Dia 260 Di Pipe K-7 261 250 Mm Dia 262 300 Mm Dia 263 Addition ( Di K-7 ) Pipe For Connecting Overflow To Main Supply 264 150 Mm Dia 265 Supplyofspecialsforabovepipef.O.Rdestination Including All Taxes And Insurance. 266 Hdpe Pipe Pn-6 ( O. D. ) Pe-100 -5% Of Item No. ( 3.54 To 3.58 ) 267 Di Pipe K-7 -10% Of Item No. ( 3.60 To 3.61 ) 268 Di Pipe K-7 -10% Of Item No. ( 3.63 ) 269 Cartingfromthestore ( Upto8km. ) Thefollowing Sizesofpipeandspecialstothesiteofwork Lowering Themintotrenchesandlayingtrue Toalignmentand Gradient Includingjointing From Electro-Fusion Machine, Testing Of Pipeline And Includingsupplyofjointingmaterialsuchasnut& Bolts, Rubberinsertion, Whiteleadetc.Complatebut Excludingcostoftrenchingandcuttingofpipesetc. For Making Of Lengths But Including Making Joints. 270 Hdpe Pipe Pn-6 ( O. D. ) Pe-100 271 90 Mm Dia 272 110 Mm Dia 273 140 Mm Dia 274 160 Mm Dia 275 200 Mm Dia 276 Di Pipe K-7 277 250 Mm Dia 278 300 Mm Dia 279 Addition ( Di K-7 ) Pipe For Connecting Overflow To Main Supply 280 150 Mm Dia 281 C.I.Doubleflangedsluice / Scourvalvesasperi.S. 780 / 1969Class-1Workingpressure10kg / Sqmf.O.R Destination Including All Taxes And Insurance. 282 C.I.Doubleflangedsluicevalves 283 80 Mm 284 125 Mm 285 150 Mm 286 200 Mm 287 250 Mm 288 300 Mm 289 Scourvalves 290 80 Mm Dia 291 Airvalves 292 25 Mm 293 Fire Hydrants 294 80 Mm 295 Supplyofallmaterials, Labourt&Petc.Requiredand Constructionoffollowingchambersas Pertypedesign Including Supply And Materials Labour, T & P Etc. Complete. 296 Surface Box Type 297 Masonry Type 298 Air Valves 299 Fire Hydrants 300 Thrust Block 301 Dismantling Of Following Type Of Surface Including Sortingoutandstakingofserviceablematerialsof Disposal Of Unserviceable Materials Up To Adistance Of 50 M. 302 B.O.E. Road 60% Old Bricks 303 Bituminous Road 304 Cc Road 305 Inter Locking Road 306 Reinstatementoffollowingtypeofsurfaceincluding Sortingoutandstakingofserviceablematerialsof Disposal Of Unserviceable Materials Up To Adistance Of 50 M. 307 B.O.E. Road 60% Old Bricks 308 Bituminous Road 309 Cc Road 310 Inter Locking Road 311 Supplyofallmaterials, Labourt&Petc.Requiredand Constructs Single Tap Pillar Type Stand Post As Per Type Design. 312 Crossing Of Culvert For Laying Pipe Line Including Supply And Materials Labour, T&P Etc. Complete. 313 Crossingofnala / Drainforlayingpipelineincluding Supply And Materials Labour, T&P Etc. Complete. 314 Crossingof Roadfor Layingpipe Lineincludingsupply And Materials Labour, T&P Etc. Complete. 315 3.5 M Wide Road 316 7.0 M Wide Road 317 Provision Forlayingofpipelinebytrenchless Technology Including Supply Of Different Sizes M.S. Casing Pipe, Labour T&P Etc. Required For Proper Completion Of The Work. 318 200 Mm 319 250 Mm 320 300 Mm 321 350 Mm 322 Provisionofhouseconnectionincludingsupplyofall Materials, Labours , T&P, Road Cutting & Reinstatementetc.Requiredforproper Completion Of Work. 323 In B.O.E. Roads 324 For 90 Mm To 110 Mm Dia 325 In Bituminous Roads 326 For 90 Mm To 110 Mm Dia 327 For 140 Mm To 160 Mm Dia 328 For 200 Mm To 250 Mm Dia 329 For 300 Mm To 350 Mm Dia 330 In C.C. Roads 331 For 90 Mm To 110 Mm Dia 332 For 140 Mm To 160 Mm Dia 333 In C.C. Interlocking Tiles Roads 334 For 90 Mm To 110 Mm Dia 335 For 200 Mm To 250 Mm Dia 336 In Earthen Roads 337 For 90 Mm To 110 Mm Dia 338 Provisionforshiftingofhouseconnectionincluding Supplyofallmaterials, Labours , T&P, Road Cutting & Reinstatementetc.Requiredfor Proper Completion Of Work. 339 In B.O.E. Roads 340 For 90 Mm To 110 Mm Dia 341 In Bituminous Roads 342 For 90 Mm To 110 Mm Dia 343 For 140 Mm To 160 Mm Dia 344 For 200 Mm To 250 Mm Dia 345 For 300 Mm To 350 Mm Dia 346 In C.C. Roads 347 For 90 Mm To 110 Mm Dia 348 For 140 Mm To 160 Mm Dia 349 In C.C. Interlocking Tiles Roads 350 For 90 Mm To 110 Mm Dia 351 For 200 Mm To 250 Mm Dia 352 In Earthen Roads 353 For 90 Mm To 110 Mm Dia 354 Interconnectionofproposednewpipelinewithold Pipeincludingsupplyofallmaterials, Labour, T&P Bailing Out Of Water Etc. Required To Complete The Work. 355 Zone-7 356 Repair Of Existing Pump House- 2 Nos. 357 Paintingorvarnishingnewironworkinsmallareasor Newwoodworkwithoneprimingcoatandtwocoatsof Approvedpaintsorvarnishincludingsupplyofall Materialslabour, T&Petcrequiredforpropercompletionof Work. 358 White Cement In Three Coats Including Supply Of All Materialslabour, T&Petcrequiredforpropercompletion Of Work 359 Providingplasterofpariswallputtyof2mmthickness Overplasteredsurfacetopreparethesurfaceevenand Smooth Complete. 360 Distempering ( Two Coat ) With Oil Bound Distemper Of Approvedbrandandmanufacture&Ofrequiredshadeon Undecoratedwallsurfacetogiveanevenshadeover& Includingaprimingcoatwithcementprimerofapproved Brand & Manufacture Such As Berger, J&N, Shalimar, Asianpaintsafterthoroughlybrushingthesurfacefree Frommortardroppings&Otherforeignmatters&Also Includingpreparingthesurfaceevenwith Plasterofparis Orapprovedsyntheticmaterial&Sandpaperedsmooth Including Cost Of All Materials. 361 Supplyandfixing3mmthick Plainglassinwindows Including Supply Of Nails, Putty Etc. Required For Proper Completion Of The Work. 362 Supply And Fixing Of 100 Mm Dia Ci Pipe Rainwater Down Pipe With Clamp Etc. 363 Site Clearence And Other Unforseen Items. 364 Reparing Of One No. Existing Over Head Tank ( 500Kl / 18M ) 365 Scraping Old Color Washing And Prepairing The Surfacebyremovingloosmaterialetc. Including All Labour And T &P Etc. Complete. 366 Allexposedsurfaceofstructuretobegiven Three Coats Of Approved Exterior Cement Paint Berger / Narolac / Asian ( Such As Apex Ultima ) Togiveasmoothandevencolour.Thepipe Systemofaboveapronlevelalongwiththe Clampstobe Paintedwiththreecoats Approved Syntheticpaints. Includingsupply Of All Labour Material T & P Necessory Scafolding Etc. Complete. 367 Repairsofo.H.T.Wall, Watertighteingwork Includingalllabour, Materialetcrequiredfor Completion Of Work. 368 Dismentling&Reconstructionofinlet, Outlet, Overflow&Washoutchamberincludingall Labour, Material Etc Required For Completion Of Work. 369 Provision Of Safty Gate On Stair Case. 370 Netontopdomewentincludingalllabour, Material Etc Required For Completion Of Work. 371 Distribution System 372 Excavationforpipelinetrenchesinordinary Soil, ( Lime, Clayorsandincludingliftupto1.5Mand Leadupto50mandrefilling, Watering, Rammingof Excavated Earth In To Trenches Anddisposal Of Surplus Earthupto50mfromthecenterofthefoundation Trenches. 373 Supplyofthefollowingsizesofpipesconfirmingto I.S.4984:1995, I.S.-8329 / 2000Latest Relevantofi.S.S. With Couplers Etc Complete In All Respect F.O.R. Destination Including All Taxes And Insurance. 374 Hdpe Pipe Pn-6 ( O.D. ) Pe-100 375 90 Mm Dia 376 110 Mm Dia 377 140 Mm Dia 378 160 Mm Dia 379 200 Mm Dia 380 Di Pipe K-7 381 250 Mm Dia 382 Addition ( Di K-7 ) Pipe For Connecting Overflow To Main Supply 383 150 Mm Dia 384 Supplyofspecialsforabovepipef.O.Rdestination Including All Taxes And Insurance. 385 Hdpe Pipe Pn-6 ( O. D. ) Pe-100 - 5% Of Item No. ( 4.74 To 4.78 ) 386 Di Pipe K-7 - 10% Of Item No. ( 4.80 ) 387 Di Pipe K-7 - 10% Of Item No. ( 4.82 ) 388 Cartingfromthestore ( Upto8km. ) Thefollowing Sizesofpipeandspecialstothesiteofwork Lowering Themintotrenchesandlayingtrue Toalignmentand Gradient Including Jointing From Electro-Fusion Machine, Testing Of Pipeline And Includingsupplyofjointingmaterialsuchasnut& Bolts, Rubberinsertion, Whiteleadetc.Complatebut Excludingcostoftrenchingandcuttingofpipesetc. For Making Of Lengths But Including Making Joints. 389 Hdpe Pipe Pn-6 ( O. D. ) Pe-100 390 90 Mm Dia 391 110 Mm Dia 392 140 Mm Dia 393 160 Mm Dia 394 200 Mm Dia 395 Di Pipe K-7 396 250 Mm Dia 397 Addition ( Di K-7 ) Pipe For Connecting Overflow To Main Supply 398 150 Mm Dia 399 C.I.Doubleflangedsluice / Scourvalvesasperi.S. 780 / 1969Class-1Workingpressure10kg / Sqmf.O.R Destination Including All Taxes And Insurance. 400 C.I.Doubleflangedsluicevalves 401 80 Mm 402 150 Mm 403 200 Mm 404 250 Mm 405 Scourvalves 406 80 Mm Dia 407 Airvalves 408 25 Mm 409 Fire Hydrants 410 80 Mm 411 Supplyofallmaterials, Labourt&Petc.Requiredand Constructionoffollowingchambersas Pertypedesign Including Supply And Materials Labour, T & P Etc. Complete. 412 Surface Box Type 413 Masonry Type 414 Air Valves 415 Fire Hydrants 416 Thrust Block 417 Dismantling Of Following Type Of Surface Including Sortingoutandstakingofserviceablematerialsof Disposal Of Unserviceable Materials Up To Adistance Of 50 M. 418 B.O.E. Road 60% Old Bricks 419 Bituminous Road 420 Cc Road 421 Inter Locking Road 422 Reinstatementoffollowingtypeofsurfaceincluding Sortingoutandstakingofserviceablematerialsof Disposal Of Unserviceable Materials Up To Adistance Of 50 M. 423 B.O.E. Road 60% Old Bricks 424 Bituminous Road 425 Cc Road 426 Inter Locking Road 427 Supplyofallmaterials, Labourt&Petc.Requiredand Constructs Single Tap Pillar Type Stand Post As Per Type Design. 428 Crossing Of Culvert For Laying Pipe Line Including Supply And Materials Labour, T&P Etc. Complete. 429 Crossingofnala / Drainforlayingpipelineincluding Supply And Materials Labour, T&P Etc. Complete. 430 Crossingof Roadfor Layingpipe Lineincludingsupply And Materials Labour, T&P Etc. Complete. 431 3.5 M Wide Road 432 7.0 M Wide Road 433 Provision Forlayingofpipelinebytrenchless Technology Including Supply Of Different Sizes M.S. Casing Pipe, Labour T&P Etc. Required For Proper Completion Of The Work. 434 200 Mm 435 250 Mm 436 Provisionofhouseconnectionincludingsupplyofall Materials, Labours , T&P, Road Cutting & Reinstatementetc.Requiredforproper Completion Of Work. 437 In B.O.E. Roads 438 For 90 Mm To 110 Mm Dia 439 In Bituminous Roads 440 For 90 Mm To 110 Mm Dia 441 For 140 Mm To 160 Mm Dia 442 For 200 Mm To 250 Mm Dia 443 In C.C. Roads 444 For 90 Mm To 110 Mm Dia 445 For 140 Mm To 160 Mm Dia 446 In C.C. Interlocking Tiles Roads 447 For 90 Mm To 110 Mm Dia 448 For 200 Mm To 250 Mm Dia 449 In Earthen Roads 450 For 90 Mm To 110 Mm Dia 451 Provisionforshiftingofhouseconnectionincluding Supplyofallmaterials, Labours , T&P, Road Cutting & Reinstatementetc. Requiredfor Proper Completion Of Work. 452 In B.O.E. Roads 453 For 90 Mm To 110 Mm Dia 454 In Bituminous Roads 455 For 90 Mm To 110 Mm Dia 456 For 140 Mm To 160 Mm Dia 457 For 200 Mm To 250 Mm Dia 458 In C.C. Roads 459 For 90 Mm To 110 Mm Dia 460 For 140 Mm To 160 Mm Dia 461 In C.C. Interlocking Tiles Roads 462 For 90 Mm To 110 Mm Dia 463 For 200 Mm To 250 Mm Dia 464 In Earthen Roads 465 For 90 Mm To 110 Mm Dia 466 Interconnectionofproposednewpipelinewithold Pipeincludingsupplyofallmaterials, Labour, T&P Bailing Out Of Water Etc. Required To Complete The Work. 467 Repairing Of Existing Boundary Wall, Gate, Site Development And Approach Raod 468 Provideallmaterials;Labour T&P Etc. For Repaire Of The Existing Boundary Wall As Per Direction Of Engineer-In-Charge. 469 Repairing Of Existing Staff Quarter 470 Scrapingoldcolorwashingandprepairingthesurfaceby Removingloosmaterialetc. Includingalllabourandt&P Etc. Complete. 471 Whitewashinginthreecoatincludingsupplyofall Materials, Labour, T&P Etc.Complete Required Forproper Completion Of The Work 472 Providing Plaster Of Paris Wall Putty Of 2Mm Thicknessover Plastered Surface To Prepare The Surface Even And Smooth Complete. 473 Finishingwallswithoilbaseddistemperpaintofapproved Makeandqualityoveroneprimingonnewworkwithtwo Coats To Given An Even Shade Including Supply Of All Materials, Labourt&Petcrequiredforpropercompletionof Work. 474 Repair For Electric Fitting 475 Repair For Sanitation Work 476 Site Clearence And Other Unforseen Items. 477 Construction Of Ground Water Recharge Mechanism For Zone-5, & 7 478 Constructionofdrainforcollectionof Waterthrowout The Campus Rate As Per Unit Estimate. 479 Constructionofsettingtankaspertypedesigen ( As Per Unit Estimate ) . 480 Construction Of 110Mm Bore Hole For 30M Depth And Lowringpvcplain18mand110mmpvcslatted- 12M. Total 30M ( As Per Unit Estimate ) 481 Construction Of Semi Circular Drain / Drainage Works 482 Levelinganddressingofwaterworkcompoundfor Proper Slope For Harvesting And Rainwater Filling Of Additional Earth Etc. All Complete 483 Provision For Permission From Other Department For All Zones. 484 Roaddiversionoftraffic, Nightsignals, Fixingcaution Boards Etc. For The Laying Of Pipe Line For All Zones. 485 E / M Work 486 Zone-5 487 Construction Of Tubewell 488 Transportation Of Rig M / C And Its T&P Including Erection And Dismantling Of Rig M / C. 489 Drilling Of 600 / 500 Mm Dia Bore Hole By Dc Rig M / C Complete With All Required Material, Labour & T&P Etc. Complete. 490 600 Mm Dia Drilling From 0 To 60 M Bgl 491 500 Mm Dia Drilling From 61 To 100 M Bgl 492 500 Mm Dia Drilling From 101 To 180 M Bgl 493 Logging Of Bore Hole By Departmental / Approved Electric Logger. 494 Tubewell Assembly 495 M.S. Tubewell Assembly With All Required Parts Like Plain Pipe, Slotted Pipe ( As Required Upto 50% Of Plain Pipes ) Rings, Well Cap, Bail Plug, Clamp, Reducer, Central Guide, Support Structure Etc. As Required & As Per Typed Design Complete In All Respect. ( Note-Axial Length Ofreducer Without Ring Shall Be Measured With Casing Pipe. ) 496 300 Mm Dia 497 200Mm Dia 498 Lowering Of Assembly 499 Lowering Of Tube Well Assembly Duly Welded Including Welding Electrode And Shrouding Of Pea Gravel Complete In All Respect. ( Note-Axial Length Ofreducer Without Ring Shall Be Measured With Casing Pipe. ) 500 300 Mm Dia Size Assembly From 0 To 54 M Bgl 501 200 Mm Dia Size Assembly From 55 To 100 M Bgl 502 200 Mm Dia Size Assembly From 101 To165 M Bgl 503 Pea Gravel 504 Supply Of 1.6 - 4.8 Mm Size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened And Properly Stacked At Site. 505 Development Of Tubewell 506 By Air Compressor 507 Transportation, Erection & Dismantling Of 250 Psi Air Compressor. 508 Development Of T.W. By 250 Psi Air Compressor With All Required Material, Labour, T&P Etc. 509 By O.P. Unit 510 Transportation, Erection & Dismantling Of 3 Cusec O.P. Unit And Yield Test. 511 Development Of T.W. By 3 Cusec O.P. Unit With All Required Material, Labour, T&P Etc. 512 Chemical And Bacteriological Test. 513 Pumping Plant And Other Instrumentation Work 514 Supply, Installation, Testing & Commissioing Of 1400 Lpm Discharge, 50M / 51 M Head - 30 H.P. Submersible Pumping Plant Which Can Be Operated At 415+10% Volts, 50 Hz Ac Supply Includingpanel, Cable Etc. Of Suitable Capacity Complete In All Respect. 515 Sitc Of Main Piping & Valves ( 150 Mm Size ) With 24 Mtr. Column Pipe, Electronic Type Chlorinating Plant Power Wiring, Earthing, Painting , Tools Sets, Wiring Of Pump House ( Internal & External ) Chain Pulley Block And Gauges Complete In All Respect With Allrequired Material, T&P Labour. 516 Sitc Of Of 40 Kva Servo Voltage Stabilizer Or As Per Requirement ( Input Voltage 230V±450V ) To Output Voltage 415±1% As Per Is 9815-1994. 517 Ce / Ul Certified Intelligent Smart Energy Meter 518 Motor Operated Actuator For Without Sluice Valve Of Size Upto 150 Mm 519 Soft Stater With Rs485port- 400 V Class, 520 Ce / Ul Certified Hydrostatic Type Sub Soil Water Level Transmiter For Tubewell 521 Ce / Ul Certified Pressure Transmiter . 522 Ce / Ul Certified Electromagnatic Flowmeter 523 Scadaautomation Of Pumping Plant 524 Ce & Ul Certified Plc / Rtu In Ip 54 Enclosure Suitable To Communicate With Gsm Based Modemunit With Cpu & Power Supply With Analog & Digital Parameter & Fetures As Specified For Each Tubewell / Oht & Stand Alone Oht To Store And Transmit Data On Gsm Backbone, Rtu / Plc Designed With Logic To Transfer Data At Multiple Stations As Specified Also Enabled With Ups For Power Backup Upto 2 Hrs & Automatioc On / Off Switching Arrangement. 525 G.S.M / G.P.R.S Based Wireless Communication 4G Modem For Rtu / Plc Capable To Transfer & Gather Data From Remote Sites To Control Stations All Accessories Included With Signal Enhancer Antenna Made For Pumping Plant Internet Charges As Specified In Tender Technical Specification. 526 Ce / Ul Certified Surge Protector For Control Panel 527 Control Panel With Ip 54 Protection, Industrial Grade For All Equipment ( Separate For Control ( 24V ) And Power Equipment ) . 528 Installation, Commissioing & Testing For One Tubewell 529 Trial Run For 3 Month Period For One Tubewell 530 Complete Cabling For All Equipments At Pumphouse. 531 Scadaautomation For Oht 532 Ce / Ul Certified Radar Type Level Transmitter For Oht 533 Motor Operated Actuator With Outlet Sluice Valve For Oht Of Size Upto 350 Mm Size 534 Ce / Ul Certified Electromagnetic Flow Meter Of 350Mm. 535 Three Month Trial & Run For 03 Month 536 Zone-6 537 Construction Of Tubewell 538 Transportation Of Rig M / C And Its T&P Including Erection And Dismantling Of Rig M / C. 539 Drilling Of 600 / 500 Mm Dia Bore Hole By Dc Rig M / C Complete With All Required Material, Labour & T&P Etc. Complete. 540 600 Mm Dia Drilling From 0 To 60 M Bgl 541 500 Mm Dia Drilling From 61 To 100 M Bgl 542 500 Mm Dia Drilling From 101 To 165 M Bgl 543 Logging Of Bore Hole By Departmental / Approved Electric Logger. 544 Tubewell Assembly 545 M.S. Tubewell Assembly With All Required Parts Like Plain Pipe, Slotted Pipe ( As Required Upto 50% Of Plain Pipes ) Rings, Well Cap, Bail Plug, Clamp, Reducer, Central Guide, Support Structure Etc. As Required & As Per Typed Design Complete In All Respect. ( Note-Axial Length Ofreducer Without Ring Shall Be Measured With Casing Pipe. ) 546 300 Mm Dia 547 150Mm Dia 548 Lowering Of Assembly 549 Lowering Of Tube Well Assembly Duly Welded Including Welding Electrode And Shrouding Of Pea Gravel Complete In All Respect. ( Note-Axial Length Ofreducer Without Ring Shall Be Measured With Casing Pipe. ) 550 300 Mm Dia Size Assembly From 0 To 42 M Bgl 551 150 Mm Dia Size Assembly From 43 To 100 M Bgl 552 150 Mm Dia Size Assembly From 101 To150 M Bgl 553 Pea-Gravel 554 Supply Of 1.6 - 4.8 Mm Size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened And Properly Stacked At Site. 555 Development Of Tubewell 556 By Air Compressor 557 Transportation, Erection & Dismantling Of 250 Psi Air Compressor. 558 Development Of T.W. By 250 Psi Air Compressor With All Required Material, Labour, T&P Etc. 559 By O.P. Unit 560 Transportation, Erection & Dismantling Of 3 Cusec O.P. Unit And Yield Test. 561 Development Of T.W. By 3 Cusec O.P. Unit With All Required Material, Labour, T&P Etc. 562 Chemical And Bacteriological Test. 563 Pumping Plant And Other Instrumentation Work 564 Supply, Installation, Testing & Commissioing Of 800 Lpm Discharge, 48M / 49 M Head - 15H.P. Submersible Pumping Plant Which Can Be Operated At 415+10% Volts, 50 Hz Ac Supply Includingpanel, Cable Etc. Of Suitable Capacity Complete In All Respect. 565 Sitc Of Main Piping & Valves ( 100 Mm Size ) With 24 Mtr. Column Pipe, Electronic Type Chlorinating Plant Power Wiring, Earthing, Painting , Tools Sets, Wiring Of Pump House ( Internal & External ) Chain Pulley Block And Gauges Complete In All Respect With Allrequired Material, T&P Labour. 566 Sitc Of Of 25 Kva Servo Voltage Stabilizer Or As Per Requirement ( Input Voltage 230V±450V ) To Output Voltage 415±1% As Per Is 9815-1994. 567 Ce / Ul Certified Intelligent Smart Energy Meter 568 Motor Operated Actuator For Without Sluice Valve Of Size 100 Mm 569 Soft Stater With Rs485port- 400 V Class, 570 Ce / Ul Certified Hydrostatic Type Sub Soil Water Level Transmiter For Tubewell 571 Ce / Ul Certified Pressure Transmiter . 572 Ce / Ul Certified Electromagnetic Flowmeter Of Size 100Mm 573 Scadaautomation Of Tubewell 574 Ce & Ul Certified Plc / Rtu In Ip 54 Enclosure Suitable To Communicate With Gsm Based Modemunit With Cpu & Power Supply With Analog & Digital Parameter & Fetures As Specified For Each Tubewell / Oht & Stand Alone Oht To Store And Transmit Data On Gsm Backbone, Rtu / Plc Designed With Logic To Transfer Data At Multiple Stations As Specified Also Enabled With Ups For Power Backup Upto 2 Hrs & Automatioc On / Off Switching Arrangement. 575 G.S.M / G.P.R.S Based Wireless Communication 4G Modem For Rtu / Plc Capable To Transfer & Gather Data From Remote Sites To Control Stations All Accessories Included With Signal Enhancer Antenna Made For Pumping Plant Internet Charges As Specified In Tender Technical Specification. 576 Ce / Ul Certified Surge Protector For Control Panel 577 Control Panel With Ip 54 Protection, Industrial Grade For All Equipment ( Separate For Control ( 24V ) And Power Equipment ) . 578 Installation, Commissioing & Testing For One Tubewell 579 Trial Run For 3 Month Period For One Tubewell 580 Complete Cabling For All Equipments At Pumphouse. 581 Scadaautomation For Oht 582 Ce / Ul Certified Radar Type Level Transmitter For Oht 583 Motor Operated Actuator With Outlet Sluice Valve For Oht Of Size Upto 300 Mm Size 584 Ce / Ul Certified Electromagnetic Flow Meter Of Size 300Mm 585 Three Month Trial & Run For 03 Month 586 Zone-7 587 Instrumentation Item For Existing ( Old Tubewell ) 588 Motor Operator Actuator Without Sluice Valve ( 150Mm ) 589 Ce / Ul Certified Electromagnatic Flowmeter Of Size 150Mm 590 Sitc Of Of 25 Kva Servo Voltage Stabilizer Or As Per Requirement ( Input Voltage 230V±450V ) To Output Voltage 415±1% As Per Is 9815-1994. 591 Ce / Ul Certified Hydrostatic Type Sub Soil Water Level Transmiter For Tubewell 592 Ce / Ul Certified Intelligent Smart Energy Meter 593 Soft Stater With Rs485port- 400 V Class, 594 Ce / Ul Certified Pressure Transmiter . 595 Scadaautomation Items For Old Existing Tubewell. 596 Ce & Ul Certified Plc / Rtu In Ip 54 Enclosure Suitable To Communicate With Gsm Based Modemunit With Cpu & Power Supply With Analog & Digital Parameter & Fetures As Specified For Each Tubewell / Oht & Stand Alone Oht To Store And Transmit Data On Gsm Backbone, Rtu / Plc Designed With Logic To Transfer Data At Multiple Stations As Specified Also Enabled With Ups For Power Backup Upto 2 Hrs & Automatioc On / Off Switching Arrangement. 597 G.S.M / G.P.R.S Based Wireless Communication 4G Modem For Rtu / Plc Capable To Transfer & Gather Data From Remote Sites To Control Stations All Accessories Included With Signal Enhancer Antenna Made For Pumping Plant Internet Charges As Specified In Tender Technical Specification. 598 Ce / Ul Certified Surge Protector For Control Panel 599 Control Panel With Ip 54 Protection, Industrial Grade For All Equipment ( Separate For Control ( 24V ) And Power Equipment ) . 600 Installation, Commissioing & Testing For One Tubewell 601 Trial Run For 3 Month Period For One Tubewell 602 Complete Cabling For All Equipments At Pumphouse. 603 Scadaautomation For Oht 604 Ce / Ul Certified Radar Type Level Transmitter For Oht 605 Motor Operated Actuator With Outlet Sluice Valve For Oht Of Size Upto 250 Mm Size 606 Ce / Ul Certified Electromagnetic Flow Meter Of Size 250Mm. 607 Three Month Trial & Run For 03 Month

Key Value

Document Fees
INR 23600 /-
EMD
INR 2100000.0 /-
Tender Value
INR 20.24 Crore /-

BOQ Items

Name of Work:Pipiganj Nagar Panchayat Water Supply Reorganization Scheme (Part-2), District-Gorakhpur.
Sl. No. Item Description
1Zone-5
2Provideallmaterials, labour,T&Petc. to construct the complete PumpHousesize(3.60x3.00x3.00m)cum chlornatingroom(2.80 x1.50x3.00m)as per type design & drawing (2 Nos.).
3Excavation ofearth infoundationinordinary soil(loam, clay orsand)includingliftupto1.50mandleapupto50.00 m refilling of excavated earth in tospace betweenbuilding and sidesoffoundationtrench,watering,rammingand disposal of surplus earth up to 50 m from the center of the trench.
4Concretewith40mmgaugeFirstclassbrickballast,local sandandcementinproportionof1:6:12infoundation and floors including supply of all materials, labour, T&P etc required for proper completion of work.
5Firstclassbrickworkin1:6cementandcoarsesand mortar infoundationandplinthincludingsupplyofall materials, labour T&P etc required for proper completion of work.
625 mm thick damp proof coarse with cement ,stone grit 12mmandapprovedcoarsesand1:1.5:3withand including water-proofing materials asordered by the Engineer- inchargeintheproportionasspecifiedbythe manufactures, alsoincludedbitumepainting(85/50or 85/25),supplyofall materials,labourT&Pandtoolsand plantsetcrequiredfor propercompletionoftheworkand includingpropercuring and shuttering as necessary.
7Firstclassbrickworkin1:4cementandcoarse sand mortar insuperstructureincludingsupplyofallmaterials labour T&P etc required for proper completion of work.
8R.C.C.workwithCementapprovedCoarsesandand20 mm Gauge approved stone ballast in the proportion 1:2:4 in lintelsofdoors,windows&sunshade excluding reinforcementanditsbendingbutincludingits fixingand bindingthesame24BWGwireinpositionwith supplyall materialslabourT&Petcrequiredforproper completionof work.
9As in item no. 1.07 above but for slab
10Supplyandfixingof1mmthicksheetiron panelled door/window/ventilatorsshuttersincluding frame, supply &fixingand adjustmentofCleats,stops,hinges, locks,bolts,handlers, spring and other fittings. (Excluding suply of Fittings).
111. Door with frame (4 Nos.)
122. Window with frame (8 Nos.) & Ventilator (4 Nos.)
13Supplyofoxidizedironfittingsofapprovedmakefor doors and window.
14Mild steel or plain work such as reinforced concrete or reinforcedbrickworkwroughttorequiredshape as necessaryincludingbuildingforpropercompletionof work andincludingsupplyofsteelitswastagebendhooks and authorized over lapping shall be measuredfloor tow level.
1525mmthick(1:2:4)plain cementconcrete floorwith cement coursesandand20mmgaugeapprovedstone grit,laidin panels,finishedwith3mmfloatingcoatof neatcementor cementandmarbledustinratioof1:5as specifiedoverand including75mmthickbaseconcrete consistingofcement, localsandand40mmgaugefirst classbrickballastinthe proportionof1:4:8andremoving anyoverlappingofmortar atthejointsofpanelsifany andgiventhemuniformfinish includingsupplyofall materials,labourT&Petcrequired for proper completion of work.
1640mmthickcement concreteflooring 1:2:4laid inone layer finishedwithafloatingcoatofneatcementwithoutbase concrete.
17Same as item no 1.14 above but 40 mm thick over base concreteconsistingofcement,localsandand40mm gauge first class brick ballast in the proportion of1:4:8. For construction of apron 0.6 m wide.
18Firstclassbrickworkin1:4cementandcoarse sand mortar insuperstructureincludingsupplyofallmaterials labour T&PetcrequiredforpropercompletionofFor construction of apron 0.6 m wide work.
19SupplyandfixingofR.C.C.coverofsize0.80x0.80Meter over pump house slab opening including supply of all material labour T&P etc complete.
2012mmthickplasterwithcementandcoarsesandmortar in proportionof1:4overbrickwork,minimumthickness notbe lessthan10mmincludingsupplyofallmaterials labour, T&P etc required for proper completion of work.
21Same as above but for rough face.
2211.5cmstringordrip-coarsein1:6cementandlocalsand mortor.
23Paintingorvarnishingnewironworkinsmallareasor new woodworkwithoneprimingcoatandtwocoatsof approved paintsorvarnishincludingsupplyofallmaterials labour, T&P etc required for proper completion of work.
24Whitecementinthreecoatsincludingsupplyof all materialslabour,T&Petcrequiredforproper completionof work.
25ProvidingplasterofPariswallputtyof2mmthickness over plastered surface to prepare the surface even and smooth complete.
26Distempering(Twocoat)withoilbounddistemper of approved brandand manufacture (suchasBerger, Apex Ultima)& ofrequired shadeon undercoated wall surface to give an even shade over & includingaprimingcoat withcementprimerofapproved brand&manufacturesuchasBerger,J&N,Shalimar,Asian paints after thoroughly brushing the surface free from mortar droppings&otherforeignmatters&alsoincluding preparingthesurfaceevenwithplasterofparisor approved syntheticmaterial&sandpaperedsmooth includingcostof all materials.
27Supplyandfixingofrolledsteeljoistincludingcostofall materials labour, T&P etc complete.
28ProvideandfixingofR.C.C.precastventilatorsjaliover openingincludingsupplyofallmaterialslabour,T&Petc complete.
29Supplyandfixingof100mmdiaCIpiperainwaterdown pipe with clamp etc.
30Anti termite treatment
31Site clearance and other unforeseen items.
32Addextrafor0.5mheightofplinthofpump house due to low ground level (78000X 0.5=39000)
33Bye Pass chamber
34Rising Main and Bye Pass Arrangement
35Supplyofthefollowingpipesincludingrailwayfreight, insurance charges F.O.R. etc. complete.
36200mm dia D.I.Class K-9
37From Tube wellsto OHTincludingbye pass
38Supply of D.I.specials for theabove pipe lines
39Carting, laying and jointing of the following sizes of pipes into the trenches including cost of all jointing materials,labourandT&P, testing etc. complete.
40From Tube wellsto OHTincludingbye pass
41Earthworkinordinarysoilwithliftupto1.50mand leadupto 50m,filling,wateringandrammingof excavatedearthintothetrenchesanddisposalof surplus earthupto 50 m.
42Supplyandcartinguptositeof workof followingsizesof C.I.D/FsluicevalvesasperI.S.780-1960testedto10 Kg/sqmfixinginpipelinetrenches,jointingandtesting complete.
43200mm dia D.I.Class K-9
44Supplyofallmaterials,labour,T&Pandconstructionof followingchambersaspertypedesignincludingsupply andmaterials,labour andT&P, testing etc. complete.
45Masonry Type
46Privision of Thrust block
47200mm dia D.I.Class K-9
48Dismantlingandreinstatementoffollowingtypeofroad surfacesforlyingofpipelineincludingsortingoutof serviceablematerialsanddisposalofunserviceable materials.
49Bituminous Road
50C.C. Road
51Interlocking Road
52BOE Road
53CrossingofRoadforlayingpipelineincludingsupply andmaterials labour, T&P etc. complete.
54Construction of OHT 1100 KL with 22 m Staging
55Supply of all the materials, labour T&P for construction of 1100 KL capacity/ 22m staging R.C.C. Over head tank (confirming to IS 3370 (part 1) : 2009, IS 3370 (Part 2): 2009, IS 3370 (Part 3) : 1967, IS 3370 (Part 4) : 1967 specification) along with main components, including cost of soil testing and making made-up G.L. 40 cm above from adjoining road at the available site. Allcomponents of OHT willbe casted in M-30 concrete withcement, coarsesand and approvedstonegritasperI.S.11682andI.S.456oritslatestrevision.Minimumdepthof foundationbeloworiginalgroundlevelwillbe2.0M.Seismiceffectsandwindloadshouldbe taken into consideration as I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure.The assumed bearing capacity of soil has been taken as 8 M.T. sqm. 1m wide RCC dog legged stair case from ground level to balcony with two separate columns with proper covered M.S. Gate and wiremesh from 1st landing to 2nd landing of stair case . M.S. ladder made of 50 x 50 x 6 mm angle section and 20 mm plain M.S. bars (specification of M.S. should be as per IS 800-2007) with hand rails of 20 mm medium class G.I. pipes on both sides in three rows from balcony to be top dome resting on an RCC plateform (75 x 75 cm and 10 cm thick) projecting from top ring beam and one alluminimum ladder inside the tank body (from manhole in top dome to bootom dome).1 m wide RCC balcony around the tank at the junction point of vertical wall and conical wall. Proper R.C.C. railing and 20 mm dia medium class G.I. pipe (in 3 rows) on both sides of stair case, around the balcony at each landing from landing with top ring beam up to manhole on the top dome and at the periphery. The G.I. pipes will be supported on R.C.C. posts of 100 mm dia or on the posts made of 50 x 50 x 6 mm M.S. angle section, spaced at intervals not more than 1.5 m. Proper ventilator at top dome in circularshapeof1.2mdiaalongwithanR.C.C.coverofminimum1.50mdiaand7.5cm thickness, pillar of ventilator should be minimum 50 cm dia. The space between top dome and R.C.C.covershouldbecoveredwithmosquitonetofstandardqualityalongwithexpended mantled jail, Providing 20 mm medium class G.I. pipes (in 3 rows) railing at top dome along with post also,Supply & installation of Digital Water level indicator including all accessories.Lightening conductor as per I.S.S. 2309 of its latest amendments of latest electricity rules. It should consist proper elevation rod with 5 of more fork points proper down conductors of prescribed mental of proper size prescribed by ISS 2309-1969 and ISS 3013-1966. C.I. manhole of min 60 x 60 cm size made of M.S. channel section with adequate cover made of M.S. sheet of minimum3 mm thickness hinged with lockning arrangement. The manhol should be fixed at top dome atproper place.
56Supply and fixing, jointing of following size of D.I. D/F pipes with D.I. D/F specials conforming to IS 8329/2000asverticalpipesforinlet,outlet,overflowandwashoutasperlatest/relevantI.S. specifications with all jointing materials for proper completion of work including other appurtenant work and excavation in all types of soil for Inletpipe 200 mm (2 Nos), Outlet pipe 350 mm, Overflow pipe 200 mm &Washout pipe 100 mm, Supply and fixing of following sizes C.I. D/F sluice valves withActuator OperatedasperI.S.S.700/1969oritslatestspecification, pressure 10kg/sqcm including carting from thestoretothesiteofwork,loweringthem intotrenches,fixinginposition&testingetc. complete. For Inletpipe 200 mm - 2 Nos., For Outlet pipe 350 mm- 1 No., For Washout pipe 100 mm - 1 No.. Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stonegritundereachduckfootbendtosupporttheverticalpipes.Thesebedblocksshould support on the raft and not on the soil. Construction of Masonary type sluice valve chamber for abovesluicevalvesasperdepartmentaltypedesignanddrawingincludingsupplyand fixing of 150 mm x 150 mm size C.I. surface box including locking arrangement. Construction of washout/overflow chamber as per departmental type design and drawing. Construction of P.C.C. floor&drainandallothernecessaryworkasperdepartmentaltypedrawinganddesign.All exteriorsurfaceofOHTtobegiventhreecoatsofapprovedexteriorweather resistantpaintsuchas Berger/ narolac / Asian/Apex Ultima to give a smooth and even shade including painting of the pipesystemaboveapronlevelalongwiththeclampsinthreecoatswithapprovedsynthetic paints. including supply of all labour material T & P necessory Scafolding etc. complete. Testing & Commission etc. all complete work. Testing of bearing capacity of soil from a reorganized Govt. Engineering Collage/Institute.
57Distribution System
58ExcavationforpipelinetrenchesinOrdinary soil,(lime,clayorsandIncludingliftupto1.5mand leadupTo50mandrefilling,watering,Rammingof excavated earth in to trenches anddisposal of surplus earthupto50mfromthecenterofthefoundation trenches.
59Supplyofthefollowingsizesofpipesconfirmingto I.S.4984:1995,I.S.-8329/2000latest relevantofI.S.S. with couplers etc complete in all respect F.O.R. destination including all taxes and insurance.
60HDPE Pipe PN-6 (O.D.) PE-100
6190 mm dia
62110 mm dia
63140 mm dia
64160 mm dia
65200 mm dia
66DI Pipe K-7
67250 mm dia
68300 mm dia
69350 mm dia
70Addition (DI K-7) Pipe for connecting overflow to main supply
71200 mm dia
72SupplyofSpecialsforabovepipeF.O.Rdestination including all Taxes and insurance.
73HDPE Pipe PN-6 (O. D.)PE-100 -5% of item no. (1.60 to 1.64)
74DI Pipe K-7 - 10% of item no. (1.66 to 1.68)
75DI Pipe K-7 10% of item no. (1.70)
76Cartingfromthestore(upto8Km.)Thefollowing sizesofpipeandspecialstothesiteofwork lowering themintotrenchesandlayingtrue toalignmentand gradient includingjointing from electro-fusion machine, testing of pipeline and includingsupplyofjointingmaterialsuchasnut& bolts,rubberinsertion,whiteleadetc.complatebut excludingcostoftrenchingandcuttingofpipesetc. For making of lengths but including making joints.
77HDPE Pipe PN-6 (O. D.)PE-100
7890 mm dia
79110 mm dia
80140 mm dia
81160 mm dia
82200 mm dia
83DI Pipe K-7
84250 mm dia
85300 mm dia
86350 mm dia
87Addition (DI K-7) Pipe for connecting overflow to main supply
88200 mm dia
89Supplyoffollowingtypesoffittingsincluding railwaysfreight,cartageuptostore,alltaxesand duties complete.
90C.I.DoubleflangedSluice/ScourValvesasperI.S. 780/1969class-1workingpressure10Kg/sqmF.O.R Destination including all taxes and insurance.
91C.I.DoubleflangedSluiceValves
9280 mm
93250 mm
94300 mm
95350 mm
96ScourValves
9780 mm dia
98AirValves
9925 mm
100Fire Hydrants
10180 mm
102Supplyofallmaterials,labourT&PEtc.requiredand constructionoffollowingchambersas pertypedesign including supply and materials labour, T & P etc. complete.
103Surface Box Type
104Masonry Type
105Air Valves
106Fire Hydrants
107Thrust Block
108Dismantling of following type of surface including sortingoutandstakingofserviceablematerialsof disposal of unserviceable materials up to adistance of 50 m.
109B.O.E. ROAD 60% old bricks
110Bituminous Road
111CC Road
112Inter locking Road
113Reinstatementoffollowingtypeofsurfaceincluding sortingoutandstakingofserviceablematerialsof disposal of unserviceable materials up to adistance of 50 m.
114B.O.E. ROAD 60% old bricks
115Bituminous Road
116CC Road
117Inter locking Road
118Supplyofallmaterials,labourT&PEtc.requiredand constructs single tap pillar type stand post as per type design.
119Crossing of Culvert for laying pipe line including supply and materials labour, T&P etc. complete.
120CrossingofNala/drainforlayingpipelineincluding supply and materials labour, T&P etc. complete.
121Crossingof Roadfor layingpipe lineincludingsupply and materials labour, T&P etc. complete.
1223.5 M wide Road
1237.0 M wide Road
124Provision forlayingofpipelinebytrenchless technology including supply of different sizes M.S. casing pipe, labour T&P etc. required for proper completion of the work.
125200 mm
126250 mm
127300 mm
128350 mm
129ProvisionofHouseconnectionincludingSupplyofall materials,labours , T&P, Road Cutting & Reinstatementetc.requiredforproper completion of work.
130In B.O.E. Roads
131For 90 mm to 110 mm dia
132In Bituminous Roads
133For 90 mm to 110 mm dia
134For 140 mm to 160 mm dia
135For 200 mm to 250 mm dia
136For 300 mm to 350 mm dia
137In C.C. Roads
138For 90 mm to 110 mm dia
139For 140 mm to 160 mm dia
140In C.C. Interlocking Tiles Roads
141For 90 mm to 110 mm dia
142For 200 mm to 250 mm dia
143In Earthen Roads
144For 90 mm to 110 mm dia
145For 300 mm to 350 mm dia
146Construction of Half Set (Single Room)Staff Quarter
147Excavationinfoundationinordinarysoil(loam,clay,and/or sand) including lift up to 1.5mand leap up to 50m refilling,watering,andrammingofexcavatedearth into thetrenchesorintothespacebetweenthebuilding and sidesoffoundationtrenches,orintotheplinth and disposalofsurplusearthuptoadistanceof50m fromthe center of the foundation trenches.
148Concretewith40mmgaugebrickballast,localsand and cement in proportion of 1:6:12 in foundation including supply of all materials, labour, T&P etc required for proper completion of work.
149First class brick work in 1:6 cement and local sand mortarinfoundationandplinthincludingsupplyofall materials,labourT&Petcrequiredforproper completion of work.
15025mmthickdampproofcoarsewithcement,stonegrit 12mmandapprovedcoarsesand1:1.5:3with and includingwater-proofingmaterialsasorderedby the Engineer-inchargeinthe proportionasspecifiedby the manufactures, also included bitume painting (85/50 or 85/25),supplyofallmaterials,labourT&Pand toolsand plantsetcrequiredforpropercompletionof theworkand including proper curing and shuttering as necessary.
151Sandfillinginthefoundationincludingsupplyoflabour material ,T&P etc .
152IstClassbrickworkin1:4cementandlocalsand mortar insuperstructureincludingsupplyofallmaterial, labour, T&P etc required for proper completion of the work. (Thickness of wall to one brick thick).
15312 mm thick plaster with cement and sand mortar inproportionof1:6overbrickwork,minimumthickness not be less than 10mm ,including supply of all materials,labour ,T&P etc for proper completion of work.
15420mmthickcementplaster,inDadoorskirtingwith cement and coarse sand mortar 1:2 laid in panels and finished with 3mmfloating coat of neat cement or 1:5 cementandmarbledust,includingsupplyofall materials,labour ,T&P etc for proper completion of work.
155Sameasitemno2.52butinproportion1:4withcement and local sand mortar, over ceiling.
156Struck pointing in cement mortar 1:2 with colouring material to match with the brickwork colour including supply of all materials ,labour, T&P etc required for proper completion of work.
157R.C.C.workwithCementapprovedCoarsesandand20 mm Gaugeapproved stoneballast in the proportion 1:1.5:3inlintelsofdoors,windows&sunshadeexcluding reinforcementanditsbendingbutincludingits fixingand bindingthesame24BWGwireinposition withsupply allmaterialslabourT&P etcrequired forproper completion of work.
158MildsteelorironworkinplainworksuchasRCCor RBwork (when not included in overall rates ) brought to requiredshapeasnecessary,including bendingand supply of steel and wastage for completion of work
159SupplyandfixingofMSangleironchaukhatsof 40x40x6mmsizeincludingsimoemouldingstraightwork asinchaukhatsandalsosupplyofallmaterials,labour, T&P etc required for proper completion of work.
160Supplyandfixholdfastindoorsandwindows chaukhats 25cmx50mmx6mm flat iron including their cutting,moulding, welding to requirwed shape also including othermaterialssuchasnailsandscrews etcrequiredin all aspect to complete the work.
161Mild steel grill in windows wrought to required form,including supply of labour, steel ,T&P etc for proper completion of work.
16225 mm thick (1:2:4) plain cement concrete floor with cementcoursesandand20mmgaugestone ballast,laid in panels, finished with 3 mm floating coat of neat cementorcementandmarbledust in ratio1:5as specified,andremovingany overlappingormortaratthe jointsofpanelsifanyand givingthemuniformfinish, includingsupplyofall materials,labour,T&Petc. requiredforproper completionofthework.including75 mmthickbase concreteconsistingofcement,localsand andfirstclass brickballast40mmgaugeinproportionof 1:4:8 including supply of all materials, labour T&P etc required for proper completion of work.
163Sameasitemno2.61abovebut40mmthickoverbase concrete consisting of cement, local sand and 40 mm gaugefirstclassbrickballastintheproportionof 1:4:8. For construction of apron 0.6 m wide.
164First class brick work in 1:4 cement and local sand mortarinsuperstructureincludingsupplyofall materials labour T&P etc required for proper completion of For construction of apron 0.6 m wide work.
165Supply of 40 mm thick sheesham wood door /window shutters with 9 mm thick Plywood or pressed Wood pannels and fixing Cleats, stops,hinges, locks, bolts, handlers,springandotherfittings. (Excludingsuplyof Fittings).
166Supply and fixing of oxidized iron fittings of approved make for doors and windows.
167PaintingorVarnishingnewironworkornewwood work in small/largeareas with onecoatprimingand two coat of approvedpaintorVamishinclduingsupply ofall materials,labourT&Petc.completerequiredfor proper completion of the work.
168White washing in three coat including supply of all materials,labour,T&Petc.completerequiredforproper completion of the work
169ProvidingplasterofPariswallputtyof2mmthickness over plastered surface to prepare the surface even and smooth complete.
170Finishingwallswithoilbaseddistemperpaintof approvedmakeandqualityoveroneprimingonnew work withtwocoatstogivenanevenshadeincluding supplyof allmaterials,labourT&Petcrequired forproper completion of work.
171Provideallmaterial,labour,T&Petc.andconstruct100 mmdiasemicircularC.C.covereddraininclduing rendering the surface smooth with neat cement.
172Supply of all materials, labour,T&P etc and construct inspection chamber as per type design and drwaing.
173Supplying,carting,laying,jointing,fixingandtestingof (1/2 -1 inch) CPVC Screwed pipe with specials and fittingsinclduingcuttingholesinmasonryandmaking good the walls, fixing clamps wherever necessary etc. complete including cost of white lead, hemps, oil, etc.
174Supplyofallmaterial,labour,T&Petcfixingofwater tap required for proper completion of the work.
175Supplyofallmaterial,labour,T&Petcfixingoffloat valverequired for proper completion of the work.
176Supplyandfixingof110mmdiaPVCpipefromUtrap toseptic tank including supply of all special materials required for proper completion of the work.
177Provisionforinternalelectrification includingsupplyof all materials, labour, T&P etc. complete.
178Supplyandfix110mmdiaACdownPipewithrose heads,bends,gratingswithnecessaryMSclamps25mmx 3mm fixed with walls including supply of150mm long ,6mm dia nails including supply of all materials ,labour etc for proper completion of work.
17920mmthickcementplaster,inDadoorskirtingwith cement and coarse sand mortar 1:2 laid in panels and finished with 3mmfloating coat of neat cement or 1:5 cementandmarbledust,includingsupplyofall materials,labour ,T&P etc for proper completion of work.
180Constructionofseptictankandsoakpitincludingsupply of materials labour etc complete.
181Supplyandfixofposition500litrecapacity PVC(Sintex or other approved make ) storage tank.
182Supply and fix indian type latrine seat with U-Trap includingsupplyofallmaterials,labour,T&Petc. required for proper completion of the work.
183Provision for electrification inside and outside of the quarter.
184Site clearance and other unforeseen items.
185Add extra for 0.5m height of plinth than the departmentaltypedesignduetolowgroundlevel (125000 x 0.5=62500)
186Construction of Boundary wall, Gate, Site Development and Approach Raod
187Provideallmaterials;labour T&P etc. for the Boundary wall as per direction of Engineer-in-charge.
188Add for extra 0.5m plinth raisingofboundrywalldue to low lying water campus (2040 x 0.5 = 1020)
189Provideallmaterials,labour T&Petc.requiredforproper completion of work and constructpillarsaspertype designandfixingofgate3.6 m wide gate.
190Provideallmaterials,labour T&Petc.requiredforproper completion of work and construct Tilesapproach road.
191ConstructionofDrainasper typedesigninallmaterials, labourT&Petc.requiredfor propercompletionofwork insidecampousforproper drainage. Size (300 mm x 300 mm).
192Provision of Lighting in campousas perdirection of Engineer-in-chargeincluding allmaterials,labourT&Petc complete.
193Provision of land escapping andarboricultureincampous asperdirectionofEngineer-in-chargeincludingall materials,labourT&Petc complete.
194Provideallmaterials,labour T&Petc.requiredforproper completionofworkincluding leveling,dressingexcavation and filling of earth where necessary for develop of water works site including carriage of earth.
195Zone-6
196Provideallmaterials,labour,T&Petc. to construct the complete PumpHousesize(3.60x3.00x3.00m)cum chlornatingroom(2.80 x1.50x3.00m)as per type design & drawing (2 Nos.).
197Excavation ofearth infoundationinordinary soil(loam, clay orsand)includingliftupto1.50mandleapupto50.00 m refilling of excavated earth in tospace betweenbuilding and sidesoffoundationtrench,watering,rammingand disposal of surplus earth up to 50 m from the center of the trench.
198Concretewith40mmgaugeFirstclassbrickballast,local sandandcementinproportionof1:6:12infoundation and floors including supply of all materials, labour, T&P etc required for proper completion of work.
199Firstclassbrickworkin1:6cementandcoarsesand mortar infoundationandplinthincludingsupplyofall materials, labour T&P etc required for proper completion of work.
20025 mm thick damp proof coarse with cement ,stone grit 12mmandapprovedcoarsesand1:1.5:3withand including water-proofing materials asordered by the Engineer- inchargeintheproportionasspecifiedbythe manufactures, alsoincludedbitumepainting(85/50or 85/25),supplyofall materials,labourT&Pandtoolsand plantsetcrequiredfor propercompletionoftheworkand includingpropercuring and shuttering as necessary.
201Firstclassbrickworkin1:4cementandcoarse sand mortar insuperstructureincludingsupplyofallmaterials labour T&P etc required for proper completion of work.
202R.C.C.workwithCementapprovedCoarsesandand20 mm Gauge approved stone ballast in the proportion 1:2:4 in lintelsofdoors,windows&sunshade excluding reinforcementanditsbendingbutincludingits fixingand bindingthesame24BWGwireinpositionwith supplyall materialslabourT&Petcrequiredforproper completionof work.
203As in item no. 3.01 above but for slab
204Supplyandfixingof1mmthicksheetiron panelled door/window/ventilatorsshuttersincluding frame, supply &fixingand adjustmentofCleats,stops,hinges, locks,bolts,handlers, spring and other fittings. (Excluding suply of Fittings).
2051. Door with frame (4 Nos.)
2062. Window with frame (8 Nos.) & Ventilator (4 Nos.)
207Supplyofoxidizedironfittingsofapprovedmakefor doors and window.
208Mild steel or plain work such as reinforced concrete or reinforcedbrickworkwroughttorequiredshape as necessaryincludingbuildingforpropercompletionof work andincludingsupplyofsteelitswastagebendhooks and authorized over lapping shall be measuredfloor tow level.
20925mmthick(1:2:4)plain cementconcrete floorwith cement coursesandand20mmgaugeapprovedstone grit,laidin panels,finishedwith3mmfloatingcoatof neatcementor cementandmarbledustinratioof1:5as specifiedoverand including75mmthickbaseconcrete consistingofcement, localsandand40mmgaugefirst classbrickballastinthe proportionof1:4:8andremoving anyoverlappingofmortar atthejointsofpanelsifany andgiventhemuniformfinish includingsupplyofall materials,labourT&Petcrequired for proper completion of work.
21040mmthickcement concreteflooring 1:2:4laid inone layer finishedwithafloatingcoatofneatcementwithoutbase concrete.
211Same as item no 10 above but 40 mm thick over base concreteconsistingofcement,localsandand40mm gauge first class brick ballast in the proportion of1:4:8. For construction of apron 0.6 m wide.
212Firstclassbrickworkin1:4cementandcoarse sand mortar insuperstructureincludingsupplyofallmaterials labour T&PetcrequiredforpropercompletionofFor construction of apron 0.6 m wide work.
213SupplyandfixingofR.C.C.coverofsize0.80x0.80Meter over pump house slab opening including supply of all material labour T&P etc complete.
21412mmthickplasterwithcementandcoarsesandmortar in proportionof1:4overbrickwork,minimumthickness notbe lessthan10mmincludingsupplyofallmaterials labour, T&P etc required for proper completion of work.
215Same as above but for rough face.
21611.5cmstringordrip-coarsein1:6cementandlocalsand mortor.
217Paintingorvarnishingnewironworkinsmallareasor new woodworkwithoneprimingcoatandtwocoatsof approved paintsorvarnishincludingsupplyofallmaterials labour, T&P etc required for proper completion of work.
218Whitecementinthreecoatsincludingsupplyof all materialslabour,T&Petcrequiredforproper completionof work.
219ProvidingplasterofPariswallputtyof2mmthickness over plastered surface to prepare the surface even and smooth complete.
220Distempering(Twocoat)withoilbounddistemper of approved brandand manufacture (suchasBerger, Apex Ultima)& ofrequired shadeon undercoated wall surface to give an even shade over & includingaprimingcoat withcementprimerofapproved brand&manufacturesuchasBerger,J&N,Shalimar,Asian paints after thoroughly brushing the surface free from mortar droppings&otherforeignmatters&alsoincluding preparingthesurfaceevenwithplasterofparisor approved syntheticmaterial&sandpaperedsmooth includingcostof all materials.
221Supplyandfixingofrolledsteeljoistincludingcostofall materials labour, T&P etc complete.
222ProvideandfixingofR.C.C.precastventilatorsjaliover openingincludingsupplyofallmaterialslabour,T&Petc complete.
223Supplyandfixingof100mmdiaCIpiperainwaterdown pipe with clamp etc.
224Anti termite treatment
225Site clearance and other unforeseen items.
226Addextrafor0.5mheightofplinthofpump house due to low ground level (78000X 0.5=39000)
227Bye Pass chamber
228Rising Main and Bye Pass Arrangement
229Supplyofthefollowingpipesincludingrailwayfreight, insurance charges F.O.R. etc. complete.
230150mm dia D.I.Class K-9
231From Tube wellsto OHTincludingbye pass
232Supply of D.I.specials for theabove pipe lines
233Carting, laying and jointing of the following sizes of pipes into the trenches including cost of all jointing materials,labourandT&P, testing etc. complete.
234From Tube wellsto OHTincludingbye pass
235Earthworkinordinarysoilwithliftupto1.50mand leadupto 50m,filling,wateringandrammingof excavatedearthintothetrenchesanddisposalof surplus earthupto 50 m.
236Supplyandcartinguptositeof workof followingsizesof C.I.D/FsluicevalvesasperI.S.780-1960testedto10 Kg/sqmfixinginpipelinetrenches,jointingandtesting complete.
237150mm dia D.I.Class K-9
238Supplyofallmaterials,labour,T&Pandconstructionof followingchambersaspertypedesignincludingsupply andmaterials,labour andT&P, testing etc. complete.
239Masonry Type
240Privision of Thrust block
241150mm dia D.I.Class K-9
242Dismantlingandreinstatementoffollowingtypeofroad surfacesforlyingofpipelineincludingsortingoutof serviceablematerialsanddisposalofunserviceable materials.
243Bituminous Road
244C.C. Road
245Interlocking Road
246BOE Road
247CrossingofRoadforlayingpipelineincludingsupply andmaterials labour, T&P etc. complete.
248Construction of OHT 650 KL with 20 m Staging
249Supply of all the materials, labour T&P for construction of 650 KL capacity/ 20m staging R.C.C. Over head tank (confirming to IS 3370 (part 1) : 2009, IS 3370 (Part 2): 2009, IS 3370 (Part 3) : 1967, IS 3370 (Part 4) : 1967 specification) along with main components, including cost of soil testing and making made-up G.L. 40 cm above from adjoining road at the available site. Allcomponents of OHT willbe casted in M-30 concrete withcement, coarsesand and approvedstonegritasperI.S.11682andI.S.456oritslatestrevision.Minimumdepthof foundationbeloworiginalgroundlevelwillbe2.0M.Seismiceffectsandwindloadshouldbe taken into consideration as I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure.The assumed bearing capacity of soil has been taken as 8 M.T. sqm. 1m wide RCC dog legged stair case from ground level to balcony with two separate columns with proper covered M.S. Gate and wiremesh from 1st landing to 2nd landing of stair case . M.S. ladder made of 50 x 50 x 6 mm angle section and 20 mm plain M.S. bars (specification of M.S. should be as per IS 800-2007) with hand rails of 20 mm medium class G.I. pipes on both sides in three rows from balcony to be top dome resting on an RCC plateform (75 x 75 cm and 10 cm thick) projecting from top ring beam and one alluminimum ladder inside the tank body (from manhole in top dome to bootom dome).1 m wide RCC balcony around the tank at the junction point of vertical wall and conical wall. Proper R.C.C. railing and 20 mm dia medium class G.I. pipe (in 3 rows) on both sides of stair case, around the balcony at each landing from landing with top ring beam up to manhole on the top dome and at the periphery. The G.I. pipes will be supported on R.C.C. posts of 100 mm dia or on the posts made of 50 x 50 x 6 mm M.S. angle section, spaced at intervals not more than 1.5 m. Proper ventilator at top dome in circularshapeof1.2mdiaalongwithanR.C.C.coverofminimum1.50mdiaand7.5cm thickness, pillar of ventilator should be minimum 50 cm dia. The space between top dome and R.C.C.covershouldbecoveredwithmosquitonetofstandardqualityalongwithexpended mantled jail, Providing 20 mm medium class G.I. pipes (in 3 rows) railing at top dome along with post also,Supply & installation of Digital Water level indicator including all accessories.Lightening conductor as per I.S.S. 2309 of its latest amendments of latest electricity rules. It should consist proper elevation rod with 5 of more fork points proper down conductors of prescribed mental of proper size prescribed by ISS 2309-1969 and ISS 3013-1966. C.I. manhole of min 60 x 60 cm size made of M.S. channel section with adequate cover made of M.S. sheet of minimum3 mm thickness hinged with lockning arrangement. The manhol should be fixed at top dome atproper place.
250Supply and fixing, jointing of following size of D.I. D/F pipes with D.I. D/F specials conforming to IS 8329/2000asverticalpipesforinlet,outlet,overflowandwashoutasperlatest/relevantI.S. specifications with all jointing materials for proper completion of work including other appurtenant work and excavation in all types of soil for Inletpipe 150 mm (2 Nos), Outlet pipe 300 mm, Overflow pipe 150 mm &Washout pipe 100 mm, Supply and fixing of following sizes C.I. D/F sluice valves withActuator OperatedasperI.S.S.700/1969oritslatestspecification, pressure 10kg/sqcm including carting from thestoretothesiteofwork,loweringthem intotrenches,fixinginposition&testingetc. complete. For Inletpipe 150 mm - 2 Nos., For Outlet pipe 300 mm- 1 No., For Washout pipe 100 mm - 1 No.. Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stonegritundereachduckfootbendtosupporttheverticalpipes.Thesebedblocksshould support on the raft and not on the soil. Construction of Masonary type sluice valve chamber for abovesluicevalvesasperdepartmentaltypedesignanddrawingincludingsupplyand fixing of 150 mm x 150 mm size C.I. surface box including locking arrangement. Construction of washout/overflow chamber as per departmental type design and drawing. Construction of P.C.C. floor&drainandallothernecessaryworkasperdepartmentaltypedrawinganddesign.All exteriorsurfaceofOHTtobegiventhreecoatsofapprovedexteriorweather resistantpaintsuchas Berger/ narolac / Asian/Apex Ultima to give a smooth and even shade including painting of the pipesystemaboveapronlevelalongwiththeclampsinthreecoatswithapprovedsynthetic paints. including supply of all labour material T & P necessory Scafolding etc. complete. Testing & Commission etc. all complete work. Testing of bearing capacity of soil from a reorganized Govt.Engineering Collage/Institute.
251Distribution System
252ExcavationforpipelinetrenchesinOrdinary soil,(lime,clayorsandIncludingliftupto1.5mand leadupTo50mandrefilling,watering,Rammingof excavated earth in to trenches anddisposal of surplus earthupto50mfromthecenterofthefoundation trenches.
253Supplyofthefollowingsizesofpipesconfirmingto I.S.4984:1995,I.S.-8329/2000latest relevantofI.S.S. with couplers etc complete in all respect F.O.R. destination including all taxes and insurance.
254HDPE Pipe PN-6 (O.D.) PE-100
25590 mm dia
256110 mm dia
257140 mm dia
258160 mm dia
259200 mm dia
260DI Pipe K-7
261250 mm dia
262300 mm dia
263Addition (DI K-7) Pipe for connecting overflow to main supply
264150 mm dia
265SupplyofSpecialsforabovepipeF.O.Rdestination including all Taxes and insurance.
266HDPE Pipe PN-6 (O. D.)PE-100 -5% of item no. (3.54 to 3.58)
267DI Pipe K-7 -10% of item no. (3.60 to 3.61)
268DI Pipe K-7 -10% of item no. (3.63)
269Cartingfromthestore(upto8Km.)Thefollowing sizesofpipeandspecialstothesiteofwork lowering themintotrenchesandlayingtrue toalignmentand gradient includingjointing from electro-fusion machine, testing of pipeline and includingsupplyofjointingmaterialsuchasnut& bolts,rubberinsertion,whiteleadetc.complatebut excludingcostoftrenchingandcuttingofpipesetc. For making of lengths but including making joints.
270HDPE Pipe PN-6 (O. D.)PE-100
27190 mm dia
272110 mm dia
273140 mm dia
274160 mm dia
275200 mm dia
276DI Pipe K-7
277250 mm dia
278300 mm dia
279Addition (DI K-7) Pipe for connecting overflow to main supply
280150 mm dia
281C.I.DoubleflangedSluice/ScourValvesasperI.S. 780/1969class-1workingpressure10Kg/sqmF.O.R Destination including all taxes and insurance.
282C.I.DoubleflangedSluiceValves
28380 mm
284125 mm
285150 mm
286200 mm
287250 mm
288300 mm
289ScourValves
29080 mm dia
291AirValves
29225 mm
293Fire Hydrants
29480 mm
295Supplyofallmaterials,labourT&PEtc.requiredand constructionoffollowingchambersas pertypedesign including supply and materials labour, T & P etc. complete.
296Surface Box Type
297Masonry Type
298Air Valves
299Fire Hydrants
300Thrust Block
301Dismantling of following type of surface including sortingoutandstakingofserviceablematerialsof disposal of unserviceable materials up to adistance of 50 m.
302B.O.E. ROAD 60% old bricks
303Bituminous Road
304CC Road
305Inter locking Road
306Reinstatementoffollowingtypeofsurfaceincluding sortingoutandstakingofserviceablematerialsof disposal of unserviceable materials up to adistance of 50 m.
307B.O.E. ROAD 60% old bricks
308Bituminous Road
309CC Road
310Inter locking Road
311Supplyofallmaterials,labourT&PEtc.requiredand constructs single tap pillar type stand post as per type design.
312Crossing of Culvert for laying pipe line including supply and materials labour, T&P etc. complete.
313CrossingofNala/drainforlayingpipelineincluding supply and materials labour, T&P etc. complete.
314Crossingof Roadfor layingpipe lineincludingsupply and materials labour, T&P etc. complete.
3153.5 M wide Road
3167.0 M wide Road
317Provision forlayingofpipelinebytrenchless technology including supply of different sizes M.S. casing pipe, labour T&P etc. required for proper completion of the work.
318200 mm
319250 mm
320300 mm
321350 mm
322ProvisionofHouseconnectionincludingSupplyofall materials,labours , T&P, Road Cutting & Reinstatementetc.requiredforproper completion of work.
323In B.O.E. Roads
324For 90 mm to 110 mm dia
325In Bituminous Roads
326For 90 mm to 110 mm dia
327For 140 mm to 160 mm dia
328For 200 mm to 250 mm dia
329For 300 mm to 350 mm dia
330In C.C. Roads
331For 90 mm to 110 mm dia
332For 140 mm to 160 mm dia
333In C.C. Interlocking Tiles Roads
334For 90 mm to 110 mm dia
335For 200 mm to 250 mm dia
336In Earthen Roads
337For 90 mm to 110 mm dia
338ProvisionforshiftingofHouseconnectionincluding Supplyofallmaterials, labours , T&P, Road Cutting & Reinstatementetc.requiredfor proper completion of work.
339In B.O.E. Roads
340For 90 mm to 110 mm dia
341In Bituminous Roads
342For 90 mm to 110 mm dia
343For 140 mm to 160 mm dia
344For 200 mm to 250 mm dia
345For 300 mm to 350 mm dia
346In C.C. Roads
347For 90 mm to 110 mm dia
348For 140 mm to 160 mm dia
349In C.C. Interlocking Tiles Roads
350For 90 mm to 110 mm dia
351For 200 mm to 250 mm dia
352In Earthen Roads
353For 90 mm to 110 mm dia
354Interconnectionofproposednewpipelinewithold pipeincludingsupplyofallmaterials,labour,T&P bailing out of water etc. required to complete the work.
355Zone-7
356Repair of Existing Pump House- 2 Nos.
357Paintingorvarnishingnewironworkinsmallareasor newwoodworkwithoneprimingcoatandtwocoatsof approvedpaintsorvarnishincludingsupplyofall materialslabour,T&Petcrequiredforpropercompletion of work.
358White cement in three coats including supply of all materialslabour,T&Petcrequiredforpropercompletion of work
359ProvidingplasterofPariswallputtyof2mmthickness overplasteredsurfacetopreparethesurfaceevenand smooth complete.
360Distempering (Two coat) with oil bound distemper of approvedbrandandmanufacture&ofrequiredshadeon undecoratedwallsurfacetogiveanevenshadeover& includingaprimingcoatwithcementprimerofapproved brand & manufacture such as Berger, J&N, Shalimar, Asianpaintsafterthoroughlybrushingthesurfacefree frommortardroppings&otherforeignmatters&also includingpreparingthesurfaceevenwith plasterofparis orapprovedsyntheticmaterial&sandpaperedsmooth including cost of all materials.
361Supplyandfixing3mmthick plainglassinwindows including supply of nails,putty etc. required for proper completion of the work.
362Supply and fixing of 100 mm dia CI pipe rainwater down pipe with clamp etc.
363Site clearence and other unforseen items.
364REPARING OF  ONE NO. EXISTING OVER HEAD TANK (500KL/18M)
365Scraping old color washing and prepairing the surfacebyremovingloosmaterialetc. including all labour and T &P etc. complete.
366Allexposedsurfaceofstructuretobegiven three coats of approved exterior cement paint Berger/ narolac / Asian ( Such as apex ultima) togiveasmoothandevencolour.thepipe systemofaboveapronlevelalongwiththe clampstobe paintedwiththreecoats approved syntheticpaints. includingsupply of all labour material T & P necessory Scafolding etc. complete.
367RepairsofO.H.T.wall,watertighteingwork includingalllabour,materialetcrequiredfor completion of work.
368Dismentling&reconstructionofInlet,outlet, overflow&washoutchamberincludingall labour, material etc required for completion of work.
369Provision of safty gate on stair case.
370Netontopdomewentincludingalllabour, material etc required for completion of work.
371Distribution System
372ExcavationforpipelinetrenchesinOrdinary soil,(lime,clayorsandIncludingliftupto1.5mand leadupTo50mandrefilling,watering,Rammingof excavated earth in to trenches anddisposal of surplus earthupto50mfromthecenterofthefoundation trenches.
373Supplyofthefollowingsizesofpipesconfirmingto I.S.4984:1995,I.S.-8329/2000latest relevantofI.S.S. with couplers etc complete in all respect F.O.R. destination including all taxes and insurance.
374HDPE Pipe PN-6 (O.D.) PE-100
37590 mm dia
376110 mm dia
377140 mm dia
378160 mm dia
379200 mm dia
380DI Pipe K-7
381250 mm dia
382Addition (DI K-7) Pipe for connecting overflow to main supply
383150 mm dia
384SupplyofSpecialsforabovepipeF.O.Rdestination including all Taxes and insurance.
385HDPE Pipe PN-6 (O. D.)PE-100 - 5% of item no. (4.74 to 4.78)
386DI Pipe K-7 - 10% of item no. (4.80)
387DI Pipe K-7 - 10% of item no. (4.82)
388Cartingfromthestore(upto8Km.)Thefollowing sizesofpipeandspecialstothesiteofwork lowering themintotrenchesandlayingtrue toalignmentand gradient including jointing from electro-fusion machine, testing of pipeline and includingsupplyofjointingmaterialsuchasnut& bolts,rubberinsertion,whiteleadetc.complatebut excludingcostoftrenchingandcuttingofpipesetc. For making of lengths but including making joints.
389HDPE Pipe PN-6 (O. D.)PE-100
39090 mm dia
391110 mm dia
392140 mm dia
393160 mm dia
394200 mm dia
395DI Pipe K-7
396250 mm dia
397Addition (DI K-7) Pipe for connecting overflow to main supply
398150 mm dia
399C.I.DoubleflangedSluice/ScourValvesasperI.S. 780/1969class-1workingpressure10Kg/sqmF.O.R Destination including all taxes and insurance.
400C.I.DoubleflangedSluiceValves
40180 mm
402150 mm
403200 mm
404250 mm
405ScourValves
40680 mm dia
407AirValves
40825 mm
409Fire Hydrants
41080 mm
411Supplyofallmaterials,labourT&PEtc.requiredand constructionoffollowingchambersas pertypedesign including supply and materials labour, T & P etc. complete.
412Surface Box Type
413Masonry Type
414Air Valves
415Fire Hydrants
416Thrust Block
417Dismantling of following type of surface including sortingoutandstakingofserviceablematerialsof disposal of unserviceable materials up to adistance of 50 m.
418B.O.E. ROAD 60% old bricks
419Bituminous Road
420CC Road
421Inter locking Road
422Reinstatementoffollowingtypeofsurfaceincluding sortingoutandstakingofserviceablematerialsof disposal of unserviceable materials up to adistance of 50 m.
423B.O.E. ROAD 60% old bricks
424Bituminous Road
425CC Road
426Inter locking Road
427Supplyofallmaterials,labourT&PEtc.requiredand constructs single tap pillar type stand post as per type design.
428Crossing of Culvert for laying pipe line including supply and materials labour, T&P etc. complete.
429CrossingofNala/drainforlayingpipelineincluding supply and materials labour, T&P etc. complete.
430Crossingof Roadfor layingpipe lineincludingsupply and materials labour, T&P etc. complete.
4313.5 M wide Road
4327.0 M wide Road
433Provision forlayingofpipelinebytrenchless technology including supply of different sizes M.S. casing pipe, labour T&P etc. required for proper completion of the work.
434200 mm
435250 mm
436ProvisionofHouseconnectionincludingSupplyofall materials, labours , T&P, Road Cutting & Reinstatementetc.requiredforproper completion of work.
437In B.O.E. Roads
438For 90 mm to 110 mm dia
439In Bituminous Roads
440For 90 mm to 110 mm dia
441For 140 mm to 160 mm dia
442For 200 mm to 250 mm dia
443In C.C. Roads
444For 90 mm to 110 mm dia
445For 140 mm to 160 mm dia
446In C.C. Interlocking Tiles Roads
447For 90 mm to 110 mm dia
448For 200 mm to 250 mm dia
449In Earthen Roads
450For 90 mm to 110 mm dia
451ProvisionforshiftingofHouseconnectionincluding Supplyofallmaterials,labours , T&P, Road Cutting & Reinstatementetc. requiredfor proper completion of work.
452In B.O.E. Roads
453For 90 mm to 110 mm dia
454In Bituminous Roads
455For 90 mm to 110 mm dia
456For 140 mm to 160 mm dia
457For 200 mm to 250 mm dia
458In C.C. Roads
459For 90 mm to 110 mm dia
460For 140 mm to 160 mm dia
461In C.C. Interlocking Tiles Roads
462For 90 mm to 110 mm dia
463For 200 mm to 250 mm dia
464In Earthen Roads
465For 90 mm to 110 mm dia
466Interconnectionofproposednewpipelinewithold pipeincludingsupplyofallmaterials,labour,T&P bailing out of water etc. required to complete the work.
467Repairing of Existing Boundary wall, Gate, Site Development and Approach Raod
468Provideallmaterials;labour T&P etc. For repaire of the Existing Boundary wall as per direction of Engineer-in-charge.
469Repairing of Existing Staff Quarter
470Scrapingoldcolorwashingandprepairingthesurfaceby removingloosmaterialetc. includingalllabourandT&P etc. complete.
471Whitewashinginthreecoatincludingsupplyofall materials, labour,T&P etc.complete required forproper completion of the work
472Providing plaster of Paris wall putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete.
473Finishingwallswithoilbaseddistemperpaintofapproved makeandqualityoveroneprimingonnewworkwithtwo coats to given an even shade including supply of all materials,labourT&Petcrequiredforpropercompletionof work.
474Repair for electric fitting
475Repair for sanitation work
476Site clearence and other unforseen items.
477Construction of ground water recharge mechanism for Zone-5, & 7
478Constructionofdrainforcollectionof waterthrowout the campus rate as per unit Estimate.
479Constructionofsettingtankaspertypedesigen(As per unit estimate).
480Construction of 110mm bore hole for 30M depth and lowringPVCplain18Mand110mmPVCslatted- 12M. Total 30M (As per Unit Estimate)
481Construction of Semi Circular Drain/Drainage works
482Levelinganddressingofwaterworkcompoundfor proper slope for harvesting and rainwater filling of additional earth etc. all complete
483Provision for permission from other department for all zones.
484Roaddiversionoftraffic,nightsignals,fixingcaution boards etc. for the laying of pipe line for all zones.
485E/M Work
486Zone-5
487CONSTRUCTION OF TUBEWELL
488Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
489Drilling of 600/500 mm dia bore hole by DC Rig m/c complete with all required material, labour & T&P etc. complete.
490600 mm dia Drilling from 0 to 60 M BGL
491500 mm dia Drilling from 61 to 100 M BGL
492500 mm dia Drilling from 101 to 180 M BGL
493Logging of bore hole by departmental/approved electric logger.
494TUBEWELL ASSEMBLY
495M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length ofReducer without Ring shall be measured with Casing Pipe.)
496300 mm dia
497200mm dia
498LOWERING OF ASSEMBLY
499Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect.(Note-Axial Length ofReducer without Ring shall be measured with Casing Pipe.)
500300 mm dia size Assembly from 0 to 54 M BGL
501200 mm dia size Assembly from 55 to 100 M BGL
502200 mm dia size Assembly from 101 to165 M BGL
503PEA GRAVEL
504Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed,Screened and properly Stacked at Site.
505DEVELOPMENT OF TUBEWELL
506By Air Compressor
507Transportation, Erection & Dismantling of 250 PSI Air Compressor.
508Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
509By O.P. Unit
510Transportation, Erection & Dismantling of 3 Cusec O.P. Unit and Yield Test.
511Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
512Chemical and bacteriological test.
513Pumping plant and Other instrumentation work
514Supply, Installation, Testing & Commissioing of 1400 LPM discharge, 50m/51 M head - 30 H.P. Submersible Pumping Plant which can be operated at 415+10% Volts, 50 Hz AC Supply includingPanel, Cable etc. of suitable capacity complete in all respect.
515SITC of Main piping & Valves (150 mm size) with 24 mtr. Column pipe, Electronic type Chlorinating plant Power wiring, earthing, Painting , Tools sets, wiring of pump house (internal & External) Chain Pulley block and gauges complete in all respect with allrequired material, T&P labour.
516SITC of of 40 KVA Servo Voltage stabilizer or as per requirement (Input Voltage 230V±450V) to Output Voltage 415±1% As per IS 9815-1994.
517CE/UL Certified Intelligent Smart Energy Meter
518Motor operated Actuator for without Sluice Valve of size upto 150 mm
519Soft Stater with RS485Port- 400 V Class,
520CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
521CE/UL Certified Pressure Transmiter .
522CE/Ul certified Electromagnatic flowmeter
523SCADAAUTOMATION OF PUMPING PLANT
524CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modemunit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2 Hrs & Automatioc on/off switching arrangement.
525G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
526CE/UL Certified Surge protector for control panel
527Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
528Installation, commissioing & testing for one tubewell
529Trial Run for 3 month period for one tubewell
530Complete cabling for all equipments at pumphouse.
531SCADAAUTOMATION FOR OHT
532CE/UL Certified Radar type level Transmitter for OHT
533Motor operated Actuator with outlet Sluice Valve for OHT of size upto 350 mm size
534CE/UL Certified Electromagnetic flow meter of 350mm.
535Three Month Trial & Run for 03 Month
536Zone-6
537CONSTRUCTION OF TUBEWELL
538Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
539Drilling of 600/500 mm dia bore hole by DC Rig m/c complete with all required material, labour & T&P etc. complete.
540600 mm dia Drilling from 0 to 60 M BGL
541500 mm dia Drilling from 61 to 100 M BGL
542500 mm dia Drilling from 101 to 165 M BGL
543Logging of bore hole by departmental/approved electric logger.
544TUBEWELL ASSEMBLY
545M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length ofReducer without Ring shall be measured with Casing Pipe.)
546300 mm dia
547150mm dia
548LOWERING OF ASSEMBLY
549Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect.(Note-Axial Length ofReducer without Ring shall be measured with Casing Pipe.)
550300 mm dia size Assembly from 0 to 42 M BGL
551150 mm dia size Assembly from 43 to 100 M BGL
552150 mm dia size Assembly from 101 to150 M BGL
553PEA-GRAVEL
554Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed,Screened and properly Stacked at Site.
555DEVELOPMENT OF TUBEWELL
556By Air Compressor
557Transportation, Erection & Dismantling of 250 PSI Air Compressor.
558Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
559By O.P. Unit
560Transportation, Erection & Dismantling of 3 Cusec O.P. Unit and Yield Test.
561Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
562Chemical and bacteriological test.
563Pumping plant and Other instrumentation work
564Supply, Installation, Testing & Commissioing of 800 LPM discharge, 48M/49 M head - 15H.P. Submersible Pumping Plant which can be operated at 415+10% Volts, 50 Hz AC Supply includingPanel, Cable etc. of suitable capacity complete in all respect.
565SITC of Main piping & Valves (100 mm size) with 24 mtr. Column pipe, Electronic type Chlorinating plant Power wiring, earthing, Painting , Tools sets, wiring of pump house (internal & External) Chain Pulley block and gauges complete in all respect with allrequired material, T&P labour.
566SITC of of 25 KVA Servo Voltage stabilizer or as per requirement (Input Voltage 230V±450V) to Output Voltage 415±1% As per IS 9815-1994.
567CE/UL Certified Intelligent Smart Energy Meter
568Motor operated Actuator for without Sluice Valve of size 100 mm
569Soft Stater with RS485Port- 400 V Class,
570CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
571CE/UL Certified Pressure Transmiter .
572CE/UL certified Electromagnetic flowmeter of size 100mm
573SCADAAUTOMATION OF TUBEWELL
574CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modemunit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2 Hrs & Automatioc on/off switching arrangement.
575G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
576CE/UL Certified Surge protector for control panel
577Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
578Installation, commissioing & testing for one tubewell
579Trial Run for 3 month period for one tubewell
580Complete cabling for all equipments at pumphouse.
581SCADAAUTOMATION FOR OHT
582CE/UL Certified Radar type level Transmitter for OHT
583Motor operated Actuator with outlet Sluice Valve for OHT of size upto 300 mm size
584CE/UL Certified Electromagnetic flow meter of size 300mm
585Three Month Trial & Run for 03 Month
586Zone-7
587instrumentation item for Existing(Old Tubewell)
588Motor operator Actuator without Sluice Valve(150mm)
589CE/UL certified Electromagnatic flowmeter of size 150mm
590SITC of of 25 KVA Servo Voltage stabilizer or as per requirement (Input Voltage 230V±450V) to Output Voltage 415±1% As per IS 9815-1994.
591CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
592CE/UL Certified Intelligent Smart Energy Meter
593Soft Stater with RS485Port- 400 V Class,
594CE/UL Certified Pressure Transmiter .
595SCADAAUTOMATION ITEMS for old existing Tubewell.
596CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modemunit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2 Hrs & Automatioc on/off switching arrangement.
597G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
598CE/UL Certified Surge protector for control panel
599Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
600Installation, commissioing & testing for one tubewell
601Trial Run for 3 month period for one tubewell
602Complete cabling for all equipments at pumphouse.
603SCADAAUTOMATION FOR OHT
604CE/UL Certified Radar type level Transmitter for OHT
605Motor operated Actuator with outlet Sluice Valve for OHT of size upto 250 mm size
606CE/UL Certified Electromagnetic flow meter of size 250mm.
607Three Month Trial & Run for 03 Month
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail