| 1 | Design, detail engineering, procurement, manufacturing,FAT, testing & inspection, packing, forwarding and supply till site including Commissioning spares, Special Tools & Tackles ,Consumables andAccessories in accordance with this specification including interface with Condition Monitoring System (CMS) & Electrical Control System(ECS) for Following AC UPS SYSTEM WITH BATTERIES FOR MSB UNIT as per specification in MR |
| 2 | Tag No. 1U64-SRR6-UPS-501:a) 200 kVA, 115 V, 50 Hz, 1 Phase, Parallel Redundant UPS with Common Static Type Stabilized Bypass supply, Redundant Ni-Cd Battery Bank (100%capacity each, back-up 200kVA for 0-30 min & 35kVA from 31-120min),ACDB, Battery isolator box with MCCB (flameproof suitable for Gas Group IIC), Battery bank stand, Interconnection cables from Battery charger to Battery bank and suitable termination arrangement with flameproof (Ex-d) nickel plated brass DC cable gland on either sides.Cell Booster(1 Lot)Cell booster: Input supply 240 V±10% AC, 50±3%HzOutput Voltage: 0-12 V DCRating: 0.2 X Ah of cellNote:Cell booster shall be supplied with 10mtrs. long flexible copper conductor.Condition Monitoring System as per Specifications forabove UPS System(1 Lot) |
| 3 | Tag No. 1U64-SRR6-UPS-501:b) 225 kVA, 115 V, 50 Hz, 1 Phase, Parallel Redundant UPS with Common Static Type Stabilized Bypass supply, Redundant Ni-Cd Battery Bank (100%capacity each, back-up 225kVA for 0-30 min & 35kVA from 31-120min),ACDB, Battery isolator box with MCCB (flameproof suitable for Gas Group IIC),Battery bank stand, Interconnection cables from Battery charger to Battery bank and suitable termination arrangement with flameproof (Ex-d) nickel plated brass DC cable gland on either sides.Cell Booster(1 Lot)Cell booster: Input supply 240 V±10% AC, 50±3%HzOutput Voltage: 0-12 V DCRating: 0.2 X Ah of cellNote:Cell booster shall be supplied with 10mtrs. long flexible copper conductor.Condition Monitoring System as per Specifications forabove UPS System(1 Lot) |
| 4 | Charges for SITE Supervision of Erection / Installation and Testing for SUPPLY OF AC UPS WITH BATTERIES FOR MSB UNIT FOR NREP PROJECT as per MR |
| 5 | Per diem charges for upto 8 hours work on normal working days. |
| 6 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
| 7 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |
| 8 | Charges for Training at Vendor Works for AC UPS WITH BATTERIES FOR MSB UNIT as specified in MR |
| 9 | Per diem charges for upto 8 hours work on normal working days. |
| 10 | Charges for Training at site for AC UPS WITH BATTERIES FOR MSB UNIT as specified in MR |
| 11 | Per diem charges for upto 8 hours work on normal working days. |