Name of Work: ESTIMATE FOR RECONSTRUCTION OF DAMAGED VRB OF GHOSIPURA MR AT KM 2.500 KM 5.100 AND SILHARI MR AT KM 0.000
Sl. No.
Item Description
1
DISMENTLING OLD DAMAGED VRB STRUCTURE INCLUDING ALL LABOUR T AND P PROPER DISPOSAL OF MATERIAL ETC. COMPLETION OF WORK
2
EARTH IN EXCAVATION OF FOUNDATION IN WET ORDINARY SOIL INCLUDING LIFT UP TO 1.50M AND LEAD UP TO 30M
3
C C136IN FOUNDATION AND FLOOR INCLUDING COST OF MATERIAL LABOUR AND T AND P
4
IstCLASS BRICK WORK IN 1 4CM INCLUDING ALL COST OF MATERIAL LABOUR AND T AND P
5
CENTERING AND SHUTTERING FOR RCC WORKS INCLUDING ALL COST OF MATERIALLABOUR AND T AND P
6
STEEL RAINFORCEMENT INCLUDING BENDING BINDING CUTTING PLACING OF REINFORCEMENT MATERIAL LABOUR AND T AND P
7
PROVIDING AND LAYING 75MM PVC PIPE FOR SLAB AND ABUTMENT
8
RCC 11.53 IN SLAB AND ABUTMENT INCLUDING ALL MATERIAL LABOUR AND T AND P ETC COMPLETE
9
CC11.53IN WEARING COST AND FLOOR INCLUDING ALL MATERIAL LABOUR AND T AND ETC COMPLETE
10
STRUCK DEEP POINTING IN12 CM INCLUDING ALL COST OFMATERIAL LABOUR AND T AND P ETC COMPLETE
11
SFWHEEL GUARD
12
S F OF MARBLE YEAR PLATE 300 X 300X 25 MM
13
S FOF BENCH MARK PLATE 150 X 150 X 25 MM
14
FINISHING WALLS WITH EXTERIOR EMULSION APEX OF APPOVED BRAND AND MANUFACTURE AND OF REQUIRED SHADE AND UNDACORATED WALL SURFACE TO GIVE SHADE OVER AT RATE 1.25 LTR PER 10 SQM INCLUDING ONE COAT OF PRIMER APPLIED AT RATE 0.75 PER 10 SQM COAT CURRING AND COAT OF ALL MATERRIAL LABOUR T AND PETC REQUIRED FOR PROPER COMPLETIOM OF WORK
15
EARTH WORK IN MAKING AND REMOVING BUNDS RAMP BACKFILLING AND MAKING CHANNEL SECTIONUP STEEMAND DOUN STEEM OF VRB
16
SUPPLY AND FIXING OF INFORMATION BOARD INCLUDING WRITING MATERIAL LABOUR ETC COMPLETION OF WORK
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.