Tender For Special Repair Supplying And Fitting Of Electro Mechanical Items For Rural Water Supply Scheme Kishunpur And Its Adjoining Villages
Tender Value
Ref. Documents
Estimated cost
Bid Submission
13 Dec 2023
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
medininagar → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Special Repair Supplying And Fitting Of Electro Mechanical Items For Rural Water Supply Scheme Kishunpur And Its Adjoining Villages
BOQ
| Sl. No. | Item Description |
| 1 | Part – A (RAW WATER ) |
| 2 | Cost towards repairing and Overhauling of 30 H.P. V.T. Pump Set Multiple Stage ball assembly S/F impeller G.M. Bush as per sample 5 – Nos each, S/F Housing Bush as per Sample. Replace in spider rubber cutlass bush – 2 Nos, replacing of 25mm dia. 5 feet long S.S. line shaft – 4 Nos with S.S. socket . Transportation charge from site to work shop vice versa including tools – tackles and Labour charges for lifting & lowering V.T. Pump before and after repairing work etc all complete at pumping plant. |
| 3 | Supplying all labour tools and tackles for complete opening, dismantling , Cleaning of its slots of stator by brush & petrol then complete rewinding of 30 H.P. 440 Volts, 50 C/S, Star delta, 3 Phase V.T. motor by supplying super enameled copper wire & then tapping varnishing, heating & testing on full load and repairing of stator & rotor, changing of bearings as per sample SKF make with including the deduction of cost of burnt copper wires and transportation charges from P/Plant to workshop and back to the same . Including tools & tackles and labour charges etc all complete at P/Plant. |
| 4 | Cost towards repairing of 100 KVA Oil cooled Servo Voltage Stabilizer working on three phase input Voltage-240 to 400 V and Output-400±1%V with following works- |
| 5 | Cost towards disconnection and cleaning of stabilizer with all labour tools and tackles. |
| 6 | Cost towards S/F of servo motor as per sample-10 kg each. |
| 7 | Cost towards s/f ofPanel Sensing/controlPCB Card as per sample |
| 8 | R.C kit |
| 9 | Wiring of stabilizer with 4 sq. mm wire |
| 10 | Control transformer |
| 11 | 3 phase Digital Voltmeter (Input/Output) As Per sample. |
| 12 | Armored and shaft |
| 13 | Cost towards adding of transformer oil. |
| 14 | Cost towards complete servicing and repairing cost of stabilizer with all labour, tools and tackles and electrician charges etc. all complete job and testing on full load. |
| 15 | Transformer Oil Top – up 150 Ltrs |
| 16 | Cost towards repairing and maintaining of lighting arrangements inside and outside of pump house by installing 75 W LED Street lights. |
| 17 | Cost towards Supplying & Fitting of 120 Sq mm x 3.5 core 1.1 KV grade aluminium conductor PVC Insulated, PVC Shethed armoured Cable including laying on flour as where required from LT line from Electric Pole to MCP of Raw Water Pumping Plant |
| 18 | Supplying and Laying 2” dia. 170 ft G.I. Pipe for covering service cable on gangway. |
| 19 | Part – B (CLEAR WATER ) |
| 20 | Supplying all labour tools and tackles for complete opening, dismantling , Cleaning of its slots of stator by brush & petrol then complete rewinding of 60 H.P. 440 Volts, 50 C/S, Star delta, 3 Phase induction motor by supplying super enameled copper wire & then tapping varnishing, heating & testing on full load and repairing of stator & rotor, changing of bearings as per sample SKF make with including the deduction of cost of burnt copper wires and transportation charges from P/Plant to workshop and back to the same . Including tools & tackles and labour charges etc all complete at P/Plant. |
| 21 | Cost towards varnishing, heating & Greasing of both side ball bearing of 60 H.P. Induction motor 3 Phase, 1440 rpm, Volt 410 ± 10% 50 Cycle and testing on full load at site including supply of all labour tools and tackles. |
| 22 | Cost for repairing of 60 H.P.C/F pump with M/S/F S.S. shaftas per sample – 1 No. C.I. Gland Tightner – 2 Nos, C.I. Bearing housing – 2 Nos, MS. Check Nut – 2 Nos, C.I. Neckring – 2 Nos, Ball Bearing S.K.F. as per sample – 2 Nos, all labour tools & tackles and materials with loading and unloading transporting charge. |
| 23 | Cost towards repairing and full rewinding of 2 H.P. Induction motor 3 Phase, 1440 rpm, Volt 410 ± 10% 50 Cycle with super enameled copper wire and Varnishing of two coat of “Dr. Beck” Varnishing and heating at control temperature and testing on full load at site including supply of all labour tools and tackles. |
| 24 | Cost for repairing of 2 H.P. monoblock C/F pump with M/S/F S.S. shaftas per sample – 1 No. C.I. Gland Tightner – 2 Nos, C.I. Bearing housing – 2 Nos, MS. Check Nut – 2 Nos, C.I. Neckring – 2 Nos, Ball Bearing S.K.F. as per sample – 2 Nos, all labour tools & tackles and materials with loading and unloading transporting charge. |
| 25 | Cost towards repairing of 200 Amp Pannel Board. Replace of 100 TP MCCB 200 Amp. Thermal release – 1 No. and out going feeder 415 VTP MCCB OLDC having thermal release range – 2 Nos. S/F Voltmeter (0-500V) Squire type – 2 Nos, S/F – Ammeter (0-63A) squire type 2 Nos and Replace of phase indicator lamp – 3 Nos. including internal wire etc all complete |
| 26 | Part – C (ESR at Karihar ) |
| 27 | Cost towards alignment and Labeling of 20 H.P. C/F motor pump set to be done. |
| 28 | Cost towards Supplying and filling of Transformer Oil in 100 KVA Transformer |
| 29 | Cost towards varnishing, heating & Greasing of both side ball bearing of 20 H.P. Induction motor 3 Phase, 1440 rpm, Volt 410 ± 10% 50 Cycle and testing on full load at site including supply of all labour tools and tackles. |
| 30 | Cost towards varnishing, heating & Greasing of both side ball bearing of 30 H.P. Induction motor 3 Phase, 1440 rpm, Volt 410 ± 10% 50 Cycle and testing on full load at site including supply of all labour tools and tackles. |
| 31 | Cost for repairing of 20 H.P.C/F pump with M/S/F S.S. shaftas per sample – 1 No. C.I. Gland Tightner – 2 Nos, C.I. Bearing housing – 2 Nos, MS. Check Nut – 2 Nos, C.I. Neckring – 2 Nos, Ball Bearing S.K.F. as per sample – 2 Nos, all labour tools & tackles and materials with loading and unloading transporting charge. |
| 32 | Cost for repairing of 30 H.P.C/F pump with M/S/F S.S. shaftas per sample – 1 No. C.I. Gland Tightner – 2 Nos, C.I. Bearing housing – 2 Nos, MS. Check Nut – 2 Nos, C.I. Neckring – 2 Nos, Ball Bearing S.K.F. as per sample – 2 Nos, all labour tools & tackles and materials with loading and unloading transporting charge. |
AI Tender Summary
Tender Timeline
Dec 06, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedDec 13, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 14, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender