| 1 | Area cleaning in and around the site by cleaning the bushes, debris, fallen trees, waste materials, garbages etc., collecting, conveying and disposing the same at places as shown by the department with a lead of 1Km all complete as per specification and as directed by the Engineer-in-charge. |
| 2 | Cleaning of existing road surfaces& foot paths by mannual or mechanical brooms including collecting, conveying of deposited sand and removing the unwanted vegetation growth and disposing them with a lead of 500 meter etc. all including safety arrangements, barricadings, labour, tools & tackels, machinery all complete as per the direction of Engineer-In-Charge. |
| 3 | Cleaning the under ground sewer line/drain line including Inspection chamber, man -hole, cleaning all the sludge and washing with water etc. complete all as per specifications and as directed by Engineer-in- charge. |
| 4 | Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc.,in all types of soil like hard gravelly soil, sandy soil for the followingdepth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling, ramming and achieving 95% modified proctor density at the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge.(if water encountered during excavation , it shall be drained out by proper dewatering arrangements and power supply required for dewatering shall borne by the contractor.) |
| 5 | All kinds of soil with depth up to 1.5m below average Ground level and disposing surplus excavated earth up to a lead of 1Km |
| 6 | Cleaning the surrounding area of various building at all levelsby removing the vegetation growth, includingclearingchoked rainwater downtake pipes, periodically as and when required including necessary ladders and scaffolding arrangements, Conveying the removed unwanted materials to the bins with a lead up to 1.0 Km etc, complete as directed by the Engineer-in-Charge. |
| 7 | Roof top area including Gutters. |
| 8 | Sunshade and Portico area. |
| 9 | Plinth protection, and drainaround the buildings |
| 10 | Road side storm water drainage |
| 11 | Cleaning of under ground road culverts of clear opening Size 14 X 1.5 X 2.0Mby manual means from existing road level including removing all types of soil,silt and slushfor upto a invert level of culvert includingstacking the excavated materials away from the edge of culvert/ chamber/road edge/ trenchesand depositing / disposing the surplus excavated earth with a lead of 30 m (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled)as directed by Engineer incharge as per specifications. Note: i) The rate shall include dewatering of culverts whenever necessay. ii) The culvert area has to be kept cleanfor 6 months. |
| 12 | Attending water supply PVC Pipe line Burst / Breakage for the following various dia. including earth work excavation to ascertain the types of leak including extra length and width of excavation required as per site condition to facilitate removal of damaged / broken pipes, specials and its rectification, dewatering, removing the slush from the trenches, conveying of the earth and slush away (within a lead of 100m) from the trenches to prevent over burden for the trench, conveyance of pipes, specials and other accessories, cutting the burst / broken pipes and removing the pipes from the mains and re-installation the new pipes of 6 Kg. per sq.cm pressure pipe confirming to IS 4985 of make \"Finolex\" or equivalent approved make jointing and testing the pipeline and re-filling the excavated trenches in to the oroginal condition etc. including labour charges complete all as per specification and as directed by Engineer-In-Charge.Note: Fixing of new pipes wherever required shall be paid under relavent item. |
| 13 | 32mm OD PVC |
| 14 | 40mm OD PVC |
| 15 | 50mm OD PVC |
| 16 | 63mm OD PVC |
| 17 | 90mm OD PVC |
| 18 | 110mm OD PVC |
| 19 | 160mm OD PVC |
| 20 | Replacing the following sizes of existing damaged PVC pipes with new PVC pipe of 6 Kg. per sq.cm pressure pipe confirming to IS 4985 of make \"Finolex\" or equivalent approved make bearing ISI marking including all types of specials, cutting and removing the damaged portion of the existing PVC line, replacing new PVC pipe for flush tank & kitchen waste line with suitable jointing compounds, necessary opening/ chasing of the wall, flooring, etc., without interupting the regular water supply, cost of necessary GI clamps, screws, teakwood plugs, packing pieces, restoring the same after completing the job to its original condition etc., all complete as per specification and as directed by the Engineer-in-charge. |
| 21 | 32mm OD PVC |
| 22 | 40mm OD PVC |
| 23 | 50mm OD PVC |
| 24 | 63mm OD PVC |
| 25 | 90mm OD PVC |
| 26 | 110mm OD PVC |
| 27 | Replacing the existing exposed worn-out GI pipe with new GI pipe of \"B\" class of make \"Tata\" or other approved equivalent conforming to relevant IS standards bearing with ISI mark and heavy quality GI specials such as Coupling, Nipple, Tee, bend, elbow, reducer, union, etc., including cost of fixing, with necessary GI clamps, screws, teakwood plugs, packing pieces, cement required for the work, painting the pipe with two coats of synthetic enamel paint over a coat of red oxide primer and making opening/ chasing in masonry wall, concrete flooring etc., and restoring the same after completing the job to its original condition, returning the retrieved worn-out pipes to Civil Maintenance stores, etc., at all lifts all complete as per specification and as directed by Engineer-In-Charge. |
| 28 | 20mm O/D GI Pipe |
| 29 | 25mm O/D GI Pipe |
| 30 | 32mm O/D GI Pipe |
| 31 | 40mm O/D GI Pipe |
| 32 | 50mm O/D GI Pipe |
| 33 | Attending underground sewer supply line Burst / Breakage for the following various dia. including earth work excavation to ascertain the types of leak including extra length and width of excavation required as per site condition to facilitate removal of damaged / broken pipes, dewatering, removing the slush from the trenches, conveying of the earth and slush away from the trenches (within a lead of 100metre) to prevent over burden for the trench, conveyance of pipes, dewatering,removing the pipes from the mains and re-installation the new pipes, jointing and testing the pipeline and re-filling the excavated trenches in to the oroginal condition etc. including labour charges complete all as per specification and as directed by Engineer-In-Charge.Note: Fixing of new pipes wherever required shall be paid under relavent item. |
| 34 | 100mm Dia. Pipe |
| 35 | 150mm Dia. Pipe |
| 36 | Providing, laying to the slope specified an jointing the following glazed stoneware pipes grade SP1. conforming to IS: 651, jointing with stiff mixture of cement mortar 1:1 (1 cement :1 fine sand) including testing of joints etc. complete excluding excavation and refilling which will be paid under relevant item all as per specifications and directed by the Engineer-in-charge. |
| 37 | 100mm diametre |
| 38 | 150mm diametre |
| 39 | Providing and fixing the following sizes of gun metal full way gate valves female ends screwed bonnet integral seat non raising spindle class I, ISI marked to IS: 778 tested to 20 kg/sq.cm hydraulic pressure etc. complete all as per specification and as directed by the Engineer-in-charge. |
| 40 | 25mm nominal bore |
| 41 | 32mm nominal bore |
| 42 | 40mm nominal bore |
| 43 | 50mm nominal bore |
| 44 | 100mm nominal bore |
| 45 | Rectifying the leakages in scour pipe in over head water tanks by chipping the concrete wall, cutting and removing the damaged GI scour pipe and introducing new 25mm to 40mm GI pipe sleeve of medium class of make \"Tata\" or other approved equivalent with ISI mark of 300 mm long with one end suitable for GI coupling and plug and welded with 150 x 150 x 6mm MS plate including painting with two coats of synthetic enamel paint over a coat of red oxide primer, embedded and grouting in the over head tank wall with plain cement, cost of GI pipe and GI specials, etc., all complete as directed by the Engineer-in-charge. |
| 46 | Cleaning of peripheral security fence including removal of wild growth, bushes, weeds, creepers etc. upto a height of 4.0 meter from existing ground level, disposing of unwanted material upto a lead of 500 meter etc. all including scaffolding/ladder tools & tackels, labour all complete as directed by the Engineer-In-Charge. |
| 47 | Providing plastering to the external surfaces of brickwork/concrete at all elevations in cement mortar 1:5, 20mm thick in two coats including hacking of concrete surfaces with pointed tool, scaffolding, finishing, curing, forming grooves wherever necessary, all as per specifications. |
| 48 | Fixing of 110mm dia. PVC rain water pipes of existing Rain water pipes which have come out from its original position due to decay of teak wood plug/packingpiece,rustedGIclampsincluding providingnewTeak wood plug/packing piece, fixing with new GI clamp with necessary screws, etc., all complete as directed by the Engineer-in-charge. upto mininmum 15.0 meter height |
| 49 | Removing of existing old damaged PVC Gate Valve and replacing with new valve for the following sizes of approved make complete all as per specification and as directed by the Engineer-in-charge. |
| 50 | 25mm dia |
| 51 | 32mm dia |
| 52 | 40mm dia |
| 53 | 50mm dia |
| 54 | 110mm dia |
| 55 | Providing and fixing the following sizes of Brass An Impact Sprinkler (impulse sprinkler) Rotary Nozzles/ Rotators all as per specification and as directed by the Engineer-in-Charge. |
| 56 | Upto radius 9m to 12m |
| 57 | Dewatering from trenches, sump, foundation structure using electrical submersible or suitable pump of required capasity with necessary arrangements to the nearest storm water drain or at places shown as directed by EIC including HDPE pipe, maintenance of the system, cost of spares, idling, labour for operation etc. Mode of measeurement will be power consumption in KWh. Note: This item will be operated during abnormal bad weather, surface run off from outside scope of work only aslo it shall be estimated for already existing culverts/Strom water drain. |
| 58 | Removal and disposal of scrab material within a lead of one Kilo meter per Cubic meter icluding man power and truck etc. |
| 59 | Construction of granular sub-bass by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MoRT&H specifications for road and bridge works (4th Revision) and as directed by the Engineer-in-charge. |
| 60 | for Grading-I material |
| 61 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost). |