| 1 | Earthwork in excavation of foundation inall kinds ofsoilwith all leads ,lifts and delifts including rough dressing & leveling the bed and depositing the excavated materials away from the work site including breaking the clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.30m in depth withall labour, T&P &cess etc complete as per the specification & direction of Engineer-in-charge |
| 2 | Filling in foundation and plinth with sand watered and rammed with all lead, lift and de-lifts etc including cost conveyance ,royalty & all taxes of materials etc. complete as per the direction of the Engineer-in-charge |
| 3 | C.C.( 1:3:6) using 40mm & down graded Crusher broken hard granite metal fromapproved quarry and of approved qualityfree from weathered skin & foreign materials mixing them properly using concrete mixer including layinginposition and compacting by vibrators with all cost, conveyance, royalty& taxes of all materialswith all leads, lifts, delifts includingwatering and curing, labour charges , cess & all T&P materials etc complete as per specification & as directed by the Engineer-In-charge. |
| 4 | RCC work of M-20 grade with 20mm and down graded Crusher broken hard granite metal fromapproved quarry and of approved quality free from weathered skin & foreign materials mixing them properly using concrete mixer including layinginposition and compacting by vibrators with all cost, conveyance, royalty& taxes of all materialswith all leads, lifts, delifts includingwatering and curing, labour charges , cess & all T&P materials etc complete as per specification & as directed by the Engineer-In-charge. |
| 5 | C.C.( 1:2:4) with12mmCrusher broken hard granite stone chipsfromapproved quarry and of approved qualityfree from weathered skin & foreign materials,sand of approved quality ,cement of approved quality and Grade,mixing them properly using concrete mixer including layinginpositionand compacting by vibratorswith all cost, conveyance, royalty& taxes of all materialsincluding, labour charges , cessT&P ,scaffolding watering & curingwith all leads, lifts, deliftsetc complete as per specification & as directed by the Engineer-In-charge. |
| 6 | Supplying,fitting and placing uncoated HYSD bar reinforcement includinglabourfor cutting ,bending,binding and tying the grillswithall cost ,conveyance, taxes of all materials, cost of binding wire, all labour , T&P, cesswith all leads, lifts & delifts etc complete as per thedrawing ,specification & direction of Engineer-in-charge. |
| 7 | Rigid & smooth centering & shutteringforC.C works including false workand dismantling them after specified period of casting including removing the debries clear & away from work siteincluding cost of all materials, conveyance, all taxes with all leads, lifts & delifts, labour charges, labour cess,all T&P materials and all costs incidental to the work etc complete as per specification & direction ofthe Engineer -In- charge. |
| 8 | Filling in foundation and plinth with previous excavated earth in layers not exceeding 22.5 cm thick including watering and ramming with all lead, lift and de-lifts etc. complete as per the direction of the Engineer-in-charge |
| 9 | Earth work in excavation in hard soil with all leads,lifts and de-lifts including rough dressing, breaking the clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m thick in approved filling reaches of canal including cost, labour charges, T&P materials, royalty, taxes etc. complete as per specification and the direction of Engineer-in-Charge. |