Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Repairing And Complete Overhauling Of V.C.B., Control Panel, Relay And Testing Of T/F Installed At 33/11 Kv Sub Station Under E.U.T.D.-I, Prayagraj. Submission Date for this Tender is 12-12-2023. Control Panel Tenders in prayagraj Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Following work are to be carried out under the jurisdiction of E.U.T.D.-I, Prayagraj. |
2 | Repairing and complete overhauling of 11 KV Schneider Electric/Stelmac/Pascal and other make VCB installed at various 33/11 KV Sub Station. Materials, if required for replacement of damaged parts while repairing, will be provided by the contractor; rate should be given including following material Cost :- |
3 | Spout, Nut-Bolt, Washer, Packing, Wires and other rubberized parts. |
4 | On-off leaver, Nut-Bolt, Washer, Packing, Wires and other rubberized parts. |
5 | Repairing & Overhauling of Relay installed at different 33/11 KV Sub-Stations. Any material, if required for replacement of damaged parts, while repairing the same shall have to be provided by the department, except Nut-Bolt, Washer, Packing, Wires and other rubberized parts will be provided by the contractor at his own cost. |
6 | Repairing & Overhauling 33 KV Transformer control panel/Battery charger panel of Control Panel installed at different 33/11 KV Sub-Stations. Any material, if required for replacement of damaged parts, while repairing the same shall have to be provided by the department, except Nut-Bolt, Washer, Packing, Wires and other rubberized parts will be provided by the contractor at his own cost. |
7 | Testing and overhauling works. |
8 | Complete testing of 33 KV Switchgears Test includes Manual & Auto Tripping of Breaker by primary/secondary injection method, CT Ratio, Lubrication of Tripping Mechanism, Lubrication of Mechanism and minor wiring if required, is also to be done. |
9 | Complete testing of 11 KV Switchgears Test includes Manual & Auto Tripping of Breaker by primary/secondary injection method, CT Ratio, Lubrication of Tripping Mechanism and minor wiring if required, is also to be done. |