| 1 | Repairs TO Exsisting ToiletUnit 1and 2 IN Govt High SEC School Mudurin Mudur pt |
| 2 | Dismantling Of oldExisiting damagedToilet Floot Tiles And IWCincluding cost and conveyance of all materials to site including all labour charges for fillingetc.complete, |
| 3 | Dismantling Of Flooring CementConcrete Iincluding cost and conveyance of all materials to site including all labour charges for fillingetc.complete, |
| 4 | Floor finishing with ceromic tiles of size 305x305x6mm including costincluding cost and conveyance of all materials and labour charges , etc, complete. |
| 5 | Distempering two coat with priming coat and two coat with OIL BOUND Distemper over Cement plastered surface, ceiling and other new surface including cleaning preparing the surface etc, complete. |
| 6 | Painting Two coat approved Plastic Emulsion over the plastered surface including cost and all other charges etc., |
| 7 | Painting TWO coats of new iron works such as steel doors, windows,ventilators, window bars, balustrades etc., |
| 8 | Provision for IWC |
| 9 | Provision forEWC |
| 10 | 110 mm pvcpiie |
| 11 | 63mm pvc pipe |
| 12 | 110 mm pvc tee |
| 13 | 63 mm pvc Bend |
| 14 | Provision for 2000litter tank |
| 15 | Provision forUrinalBasin |
| 16 | Earth work excavation for foundation in all classes of soils and sub soil to full depthexcept in hard rock requiring blasting but inclusive of shoring struttingif required forthe sides of foundation. |
| 17 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., |
| 18 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 19 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.) |
| 20 | Rainforcement Cement Concrete 1:1 1/2:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or ro |
| 21 | Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 22 | Plastering with CM 1:4, 20mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 23 | Supply and Delivery of 180mm dia/6kscpvc pipe casing |
| 24 | Supply and delivery of 2.00 hp pumpset having1 |
| 25 | 2.00 hp panel board |
| 26 | 2.5 srmm Cable |
| 27 | 32mm Gi pipe |
| 28 | 32 mm Gi Coupling |
| 29 | 32mm Gi Elbow |
| 30 | 63mm pvc pipe |
| 31 | 63mm pvcElbow |
| 32 | 7/20 GI Stay Wire |
| 33 | 7/20Copper Wire |
| 34 | 20mm GI pipe for EB srvice |
| 35 | Teak wood Board 12x24 |
| 36 | 63mm Fuse carrier |
| 37 | Bore well cover plate |
| 38 | Cement Solvent |
| 39 | 20 mm pvcpipe |
| 40 | 20 mm pvc Bend |
| 41 | 20 mm pvcTee |
| 42 | 110 mm pvcpipe |
| 43 | 110 mm Pvc Tee |
| 44 | Geophysical Investigation charges for selecting the Bore well point |
| 45 | Drilling of 180 mm dia vertical bore well in hard rock area by using hard rock rig including cost of drilling upto casing pipe depth |
| 46 | Drilling of 150mm dia vertical bore well in hard rock area by using hard rock rig including cost of drilling below casing pipe |
| 47 | Earth work excabation and deposit on bank with inital lead |
| 48 | Laying and joints PVC pipe into trench |
| 49 | Refiling Trench after laying pipe into trench |
| 50 | Labour Charges for Erection |
| 51 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |