}

Tender For Strengthening The Bt Road At Mavuruti Eswaran Kovil To Madesampalayam In Paramathi Town Panchayat, Namakkal-Tamil Nadu

Town Panchayats-TP has published Tender For Strengthening The Bt Road At Mavuruti Eswaran Kovil To Madesampalayam In Paramathi Town Panchayat. Submission Date for this Tender is 11-12-2023. Road Work Tenders in Namakkal Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

40898189
Tender For Strengthening The Bt Road At Mavuruti Eswaran Kovil To Madesampalayam In Paramathi Town Panchayat
Open Tender
Indian
Tamil Nadu
Namakkal
11-12-2023

Tender Details

Tender For Strengthening The Bt Road At Mavuruti Eswaran Kovil To Madesampalayam In Paramathi Town Panchayat; 1 Picking The Existing Surface 3 To 5 Cm Deep Removal Of Picked Up Staff To The Side Berms And Using The Useful Metal To The Road Hand Packing To Camber Sectioning Levelling Etc., Complete As Per Including Labour Charges For Picking And Other Tools And Plants Etc., Complete As Per Standard Specifications. 404 Ofmorth. 2 Collection, Supply And Laying Of Well Gravel To The Specified Thick Including Cost And Conveyance Ofwellgravel From Approved Quarry And Stocking The Same At Road Side To Departmental Guage For Premeasurement As Directed By The Departmental Officers Including Labour Charges For Spreading In Layers Not Exceeding 75 Mm Thick ( Or ) As Specified By The Departmental Officers, Levelling, Sectioning Etc., And All Other Charges For Tools And Plants Employed For The Work And All Other Incidental Charges Such As Barricading And Providing Danger Lights Etc., Complete As Per Standard Specification. As Per Clause 301 & 305 Of Morth 3 Providing, Laying, Spreading And Compacting Grading Aggregates To Wet Mix Mecadam Specification In 150Mm Thick Including Premixing The Materials With Water At Omc In Mechanical Mix Plant. Cariage Of Mixed Materials By Tipper To Work Site Laying In Uniform Layers With Pavers In Sub Base / Course On Well Prepared Surface And Compacting With Vibratory Roller To Acheive The Desired Density Etc Complete As Per Clause 406 Of Morth Rev-5 4 Providing And Laying Prime Coat Over Wmm Surface Using 7Kg Of Emulsion Bitumen ( Ssi ) Per10 Sqm For Preparatory To Another Bituminous Construction Over It, Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete As Per Clause 502 Of Morth Rev-5 5 Providing And Laying Tack Coat 2.5Kg Per 10Sqm Over Wmmsurface Using Of Emulsion Biumen ( Rs 1 ) And Cost Emulsion Bitumen Which Will Be Supplied And Procured By The Contractor Himself At His Own Cost As Per Special Condition Appeneded Labour Charges For Preparing The Surface For Laying The Tack Coat And For Applying The Required Quantity Of Bituminous By Mechanicla Sprayer Including Hire And Fuel For All Tools And Plants Employed Etc Completestandard Specification As Per Clause 503 Of Morth Rev - 5 Specification. 6 Providing And Laying 50Mm Consolidated Thick Dense Bituminous Macadam Using 0.24Cum Of 26.50-13.20Mm, 0.25 Cum Of 13.20-2.36Mm And 0.23 Cum Of 2.36Mm & Below And With 53.20Kgs Of Vg30 / Vg40 Bitumen For Premixing Per 10Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregate To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Conveying The Mix By Tipper Trucks To Worksite, Spreading The Mix To Uniform Thickness Of 50Mm With Paver To The Specified Grades And Cross Sections And Compacted By Vibratory / Pneumatic Roller To The Required Density Etc., Including Labour For Attending To Paver At Site Etc., Including Hire Charges And Fuel Charges For 20- 30T Cmp With Bitumen Boiler, Tipper Trucks, Paver Finisher / 9M Paver Finisher, Vibratory / Pneumatic Rollers And All Other Tools And Plant Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clause 505 Morth Rev-5 7 Providing And Laying Bituminous Concrete 30Mm Consolidated Thick Using 0.13 Cum Of 19.00 – 9.50Mm, 0.17 Cum Of 9.50-2.36Mm And 0.26 Cum Of2.36 Mm & Below With 50.3 Kgs Of 60 / 70 Grade Bulk Bitumen For Premixing Per 10 Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20 – 30 Ton Capacity, Conveying The Mix By Tipper Trucks To Paver Site, Spreading Themix To Uniform Thickness Of 30 Mm With Mechanical Pavers To The Specified Grades And Cross Sections And Compaction By Vibratory / Pneumatic Rollers To The Required Density Etc., Including Labour For Loading Bitumen Into Bitumen Tank And Metal To Feeder Unit, Labour For Attending To Paver Site Etc., Including Hire Charges And Fuel Charges For 20 – 30 Ton Cmp With Bitumen Boiler Tipper, Trucks, Paver Finisher / 9M, Vibrator Rollers And All Other Tools And Plants Required, Including All Other Incidental Charges Etc., Complete As Per Standard Specification Using Cmp Clause 507 Of Morth Rev-5 8 Road Marking With Hot Applied Thermoplastic Compound 2.5Mm Thick With Reflectorising Glass Beads On Bituminous Surface Inlcuding Refectorising Glass Beads @ 250 Gms Per Sqm Area, Exclusive Of Surface Applied Glass Beads. The Finished Surface To Be Level Uniform And Free From Streaks And Holes Etc., Complete As Per Morth Specification No. 803. 9 Towards The Charges For Routine Maintenance Of The Road Work Executed Under Nabard Scheme Including Dressing Of Berms By Refilling The Gully With The Earth From Borrow Pits, Cleaning Of Wild Seasonal Growth On Berms, Destilting Of Side Drains And Cd Works, White Washing Guard Stones, Painting Of Km, Hm Stones, Parapets, Cutting Of Branches Of Trees, Refixing Displaced Guard Stones, Caution Boards, Speed Limit Boards Etc., With The Periodicity For The Above Activities As Prescribed In Irc-Sp-20:2002 And As Directed By The Departmental Officers Except For The Constructional Defects Which Has To Be Rectified By The Contractor At His Own Cost. Clearing And Lightjungle Removing And Disposing Of All Materials Such As Bushes, Shrubs, Stumps, Roots, Grass, Weeds, Top Organic Soil Not Exceeding 150Mm In Thickness As Rubbish Including All Other Incidental Charges Etc., Complete As Per Morth Specification 111, 112, 201 . Upkeeping 1St Year ( 50% ) 10 Upkeeping 2Nd Year ( 60% ) 11 Upkeeping 3Rd Year ( 60% ) 12 Upkeeping 4Th Year ( 60% ) 13 Upkeeping 5Th Year ( 60% ) 14 Earth Work Open Excavation And Depositing On Bank With In The Initial Lead Of 10M And A Lift Of 2M In Hard Stiff Clay, Stiff Block Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Boulders Etc. Complete. Complying With Standard Specifications As Per Ss 20 Amorth 24 & 25Upkeeping For 1St Year ( 40% ) 15 Upkeeping For 2Nd Year ( 40% ) 16 Upkeeping For 3Rd Year ( 40% ) 17 Upkeeping For 4Th Year ( 40% ) 18 Upkeeping For 5Th Year ( 40% ) 19 Tack Coat- Providing And Applying Tack Coat With Bitumen Emulsion ( Rs-I Type ) Using Emulsion Pressure Distributor At The Rate Of 0.20 Kg / Sqm On The Prepared Bituminous / Granular Surface Cleaned With Mechanical Broom As Per Clause 503. 4 Th Year 3% 20 5 Th Year 5% 21 Providing And Laying Bituminous Concrete 30Mm Consolidated Thick Using 0.13 Cum Of 19.00 – 9.50Mm, 0.17 Cum Of 9.50-2.36Mm And 0.26 Cum Of2.36 Mm & Below With 50.3 Kgs Of 60 / 70 Grade Bulk Bitumen For Premixing Per 10 Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20 – 30 Ton Capacity, Conveying The Mix By Tipper Trucks To Paver Site, Spreading Themix To Uniform Thickness Of 30 Mm With Mechanical Pavers To The Specified Grades And Cross Sections And Compaction By Vibratory / Pneumatic Rollers To The Required Density Etc., Including Labour For Loading Bitumen Into Bitumen Tank And Metal To Feeder Unit, Labour For Attending To Paver Site Etc., Including Hire Charges And Fuel Charges For 20 – 30 Ton Cmp With Bitumen Boiler Tipper, Trucks, Paver Finisher / 9M, Vibrator Rollers And All Other Tools And Plants Required, Including All Other Incidental Charges Etc., Complete As Per Standard Specification Using Cmp Clause 507 Of Morth Rev-5 4 Th Year 3% 22 5 Th Year 5%

Key Value

Document Fees
Refer document
EMD
INR 210000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Strengthening the BT Road @Mavuruti Eswaran Kovil to Madesampalayam in Paramathi Town Panchayat
Sl. No. Item Description
1Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 ofMORTH.
2Collection, supply and laying of Well Gravel to the specified thick including cost and conveyance ofWellgravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
3Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 150mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete as per clause 406 of MORTH Rev-5
4Providing and laying Prime Coat over WMM Surface using 7Kg of Emulsion Bitumen (SSI)per10 sqm for preparatory to another bituminous construction over it, including cost of material,labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
5Providing and laying Tack coat 2.5Kg per 10sqm over WMMSurface using of Emulsion Biumen ( RS 1) and cost emulsion bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appeneded labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanicla sprayer including hire and fuel for all tools and plants employed etc completestandard specification As per clause 503 of MORTH Rev - 5 Specification.
6Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
7Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of2.36 mm & below with 50.3 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
8Road Marking with Hot Applied Thermoplastic Compound 2.5mm thick with Reflectorising Glass Beads on Bituminous Surface inlcuding refectorising glass beads @ 250 gms per sqm area, exclusive of surface applied glass beads. The finished surface to be level uniform and free from streaks and holes etc., complete as per MORTH specification No. 803.
9Towards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost. Clearing and LightJungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MORTH Specification 111, 112, 201 . Upkeeping 1st year (50%)
10Upkeeping 2nd year (60%)
11Upkeeping 3rd year (60%)
12Upkeeping 4th year (60%)
13Upkeeping 5th year (60%)
14Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complying with Standard Specifications as per SS 20 AMORTH 24 & 25Upkeeping for 1st year (40%)
15Upkeeping for 2nd year (40%)
16Upkeeping for 3rd year (40%)
17Upkeeping for 4th year (40%)
18Upkeeping for 5th year (40%)
19Tack coat- Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503. 4 th year 3%
205 th year 5%
21Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of2.36 mm & below with 50.3 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 4 th year 3%
225 th year 5%
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail