| 1 | Checking and tightening the bolt & nuts of Super Arc fenders at Coal berths 1 & 2 (38 Nos fenders) and\"D\" type fenders at Small craft jetties including all fixtures and fittings other than fenders once a month including the hiring of the boat if required including the cost of all labour, tools and plants scaffolding, fuel, transport, etc complete. |
| 2 | First Year |
| 3 | Second Year |
| 4 | Checking and tightening the bolt & nuts ofDIPTI Cell fenders (14 Nos fenders)at General Cargo Berth-1including all fixtures and fittings other than fenders once a month including the hiring of the boat if required including the cost of all labor, tools, and plants scaffolding, fuel, transport etc complete. |
| 5 | First Year |
| 6 | Second Year |
| 7 | Checking and tightening the bolt & nuts ofSuper Cone fenders at CB -3 & 4(32 Nos fenders) and V-type fenders at Earth Retaining Structure(ERS) berth (17 Nos fenders)including all fixtures and fittings other than fenders once a month including the hiring of the boat if required including the cost of all labour , tools, and plants scaffolding, fuel, transport etc complete. |
| 8 | First Year |
| 9 | Second Year |
| 10 | Removing and transporting the existing damaged Super arc fenders to the place as shown at the site within a lead of 800 m including lifting loading, transporting unloading, and stacking the damaged fenders as directed at the site including the cost of all labor, machinery, hiring of the boat, Tools & equipment,transport, scaffolding, etc. complete. |
| 11 | First Year |
| 12 | Second Year |
| 13 | Lifting and transporting new/good fenders from the stack within a lead of about 800 m and fixing the same in position at the same place where the damaged fenders were removed as directed at the site including lifting, placing &fixing in position including the cost of all labour, machinery, hiring of the boat, Tools & equipment, transport, scaffolding etc. complete. |
| 14 | First Year |
| 15 | Second Year |
| 16 | Removing the damaged facia pads of fenders at General Cargo Berth - 1, CB -3 & 4 and transporting to the place as shown at the site within a lead of 800 m including lifting loading, transporting unloading, and stacking the damaged fascia pads as directed at the site including the cost of all labour, machinery, hiring of the boat, Tools & equipment,transport, scaffolding platform etc. complete. |
| 17 | First Year |
| 18 | Second Year |
| 19 | Lifting and transporting new/good fascia pads from the stack and fixing the same in position at the same place where the damaged fascia pads were removed as directed at the site including made good by providing bolt& nuts, clamps etc the frontal frame to receive the new facia pad including lifting, placing &fixing in position including the cost of all materials,labour, machinery, hiring of the boat, Tools & equipment, transport, scaffolding, platform etc. complete. |
| 20 | First Year |
| 21 | Second Year |
| 22 | Rectification of frontal frame including removing the frontal frame welding removing the damaged plates around both sides of the frontal frame, bolts, Scraping/rubbing the corrosion on the face of the frontal frame of cell fender, and applying MD MS polymer-based adhesive to receive facia pad including re-fixing the rectified frontal frames in position etc including the cost of all materials, labour transport, scaffolding, etc complete |
| 23 | First year |
| 24 | Second Year |
| 25 | Interchanging the damaged DIPTI cell fender at General Cargo Berth-1/ Super Cone fender at CB 3 & 4/ V-fender at ERS with idle fender including removing and fixing both fenders including transporting of fenders to the place as shown at site within a lead of 800 m including lifting loading, transporting unloading and stacking the damaged fenders as directed at the site including the cost of all labor, machinery, hiring of the boat, Tools & equipment,transport, scaffolding etc. complete. |
| 26 | First Year |
| 27 | Second Year |
| 28 | Retrieving and assembling super arc fenders from the damaged super arc fender units (3 piece unit) including Lifting, and assembling with the available bolts & nets as directed at the site including the cost of all labour, machinery, hiring of the boat, Tools & equipment, transport, scaffolding, etc. complete. |
| 29 | First Year |
| 30 | Second Year |
| 31 | Rectification of corroded /damagedladders at small craft jetties/ coal wharves, GCB-1including the cost of GI pipes 50mm dia to a required length, MS rod of 20 mm dia for rungsincluding the cost of all labour, machinery, hiring of the boat, Tools & equipment, transport,etc complete |
| 32 | First year |
| 33 | Second Year |
| 34 | Welding the creak in the rail of the wharf crane track of coal berths including strengthening the base of the joint with a suitable steel plate as directed at the site including welding the joints as per standard including the cost of all labour, welding rods, tools & plants, fuel, transport etc. complete. |
| 35 | First Year |
| 36 | Second Year |
| 37 | Clearing the coal deposited over the super arc fender at Coal Berths 1&2 once a month including depositing the coal within a lead of 50 m as directed at the site including the cost of all labour, scaffolding, tools and plant, transport,etc complete. |
| 38 | First Year |
| 39 | Second Year |
| 40 | Supplying and painting fittings, bollards, steel fixtures etc in General Cargo Berth / Coal Berths/ Small Craft Jetties with epoxy paint two coats including the cost of paint including the cost of all labour, materials, transport, scaffolding,etc. complete. |
| 41 | First Year |
| 42 | Second Year |
| 43 | Fabricate, Supply, and erect MS Steel ladder in the position of the old damaged/ missed ladder as per the drawing and or as directed at the site in coal berths, GCB, and small craft jetties including the cost of all materials, labour, tools, and plants, equipment etc complete. |
| 44 | First Year |
| 45 | Second Year |
| 46 | Interchanging the damaged \"D\" type fender with idle fender at small craft jetties as shown at the site including removing and fixing of fender,including the cost of all labor, machinery, hiring of the boat, Tools & equipment,transport, scaffolding, etc. complete. |
| 47 | First Year |
| 48 | Second Year |
| 49 | Supply and fixing of G.I. sleeve rods of 30mm diameter and 400mm length by core cutting in RCC rich mix of 50mm dia,320mm deep for fixing sleeve rods including fixing of G.I. sleeve rods with Hilti –E500 fastener as per instruction of Engineer including the cost of materials, fixing in a position suitable scaffolding, labour, tools & machinery, transport etc complete. |
| 50 | First Year |
| 51 | Second Year |
| 52 | Repairing and fixing the damaged fender chain by welding or providing new chain link as per requirementincluding the cost for welding, materials, labours, suitable scaffolding, tool and equipment etc required to complete the work |
| 53 | First Year |
| 54 | Second Year |
| 55 | Re-fixing of disturbed bollard including removing old bollarad including cost of stainless steel fasteners, cost of core cutting as per the specification with epoxy grouting including cost of labour, machinery, tools, transport, etc., complete. |
| 56 | First Year |
| 57 | Second Year |