Tender For Package-I Civil And Hydro-Mechanical Works Of Diversion Tunnels Pertaining To Tato-Ii Hydro Electric Project (700 Mw), Arunachal Pradesh, West Siang-Arunachal Pradesh

North Eastern Electric Power Corporation Limited-NEEPCO has published Tender For Package-I Civil And Hydro-Mechanical Works Of Diversion Tunnels Pertaining To Tato-Ii Hydro Electric Project (700 Mw), Arunachal Pradesh. Submission Date for this Tender is 10-06-2024. Civil Work Tenders in West Siang Arunachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

40883107
Corrigendum : Tender For Package-I Civil And Hydro-Mechanical Works Of Diversion Tunnels Pertaining To Tato-Ii Hydro Electric Project (700 Mw), Arunachal Pradesh
Open Tender
Indian
Arunachal Pradesh
West Siang
10-06-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Package-I Civil And Hydro-Mechanical Works Of Diversion Tunnels Pertaining To Tato-Ii Hydro Electric Project ( 700 Mw ) , Arunachal Pradesh

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 15-Dec-2023 Corrigendum No. 1 Dated 15-12-2023 Other 29-01-2024
2 15-Dec-2023 Pre-bid Clarification No. 1 Dated 15-12-2023 Other 29-01-2024
3 19-Dec-2023 Pre-bid Clarification No. 2 Dated 19-12-2023 Other 29-01-2024
4 17-Jan-2024 Pre-bid Clarifications No. 3 Dated 17-01-2024 Other 29-01-2024
5 19-Jan-2024 Corrigendum No. 2 Dtd. 19-01-2024 Other 29-01-2024
6 19-Jan-2024 Pre-Bid Clarifications No. 4 Dtd. 19-01-2024 Other 29-01-2024
7 25-Jan-2024 Corrigendum No. 3 Dated 25-01-2024 Date 26-02-2024
8 12-Feb-2024 Corrigendum No. 4 Dtd. 12-02-2024 Other 26-02-2024
9 12-Feb-2024 Pre-Bid Clarifications No. 6 Dtd. 12-02-2024 Other 26-02-2024
10 12-Feb-2024 Pre-Bid Clarifications No. 5 Dtd. 12-02-2024 Other 26-02-2024
11 26-Feb-2024 Corrigendum No. 5 Dtd. 26-02-2024 Date 27-03-2024
12 27-Mar-2024 Corrigendum No. 6Dtd. 27-03-2024 Date 29-04-2024
13 02-Apr-2024 Pre-bid Clarifications No. 7 Dated 02-04-2024 Other 29-04-2024
14 09-Apr-2024 Corrigendum No. 7 Dated 09-04-2024 Other 29-04-2024
15 29-Apr-2024 Corrigendum No. 8 Dtd 29-04-2024 Date 10-06-2024

Key Value

Document Fees
INR 23600 /-
EMD
INR 28500000.0 /-
Tender Value
INR 142.73 Crore /-

Attachment

FileName File Description File Size
547ad3fa-0c36-41a8-bb18-e616257e2f7d.html Tender Notice 0 KB
BidDoc.rar Tender Document 0 KB
BOQ_192941.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work: Package-I: Civil & Hydro-Mechanical Works of Diversion Tunnels pertaining to Tato-II Hydro Electric Project (700 MW), Arunachal Pradesh
Sl. No. Item Description
11. CONTROL OF WATER, CONSTRUCTION DRAINAGE AND DEWATERING
21.1 Control of water, dewatering of surface/underground construction sites including all construction works, labor, plants and materials necessary to keep the construction sites free of water during the contract period. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge.
31.1.1 Dewatering of surface construction sites including all plants, materials, labour, installation, operation, power supply, maintenance and removal of pumping equipment from site
41.1.2 Dewatering of underground construction sites including all plants, materials, labour, installation, operation, power supply, maintenance and removal of pumping equipment from site
51.1.3 Construction of Temporray Ring Bund Complete in all respect with all plant, materials, labour, all lead & lifts, etc. as per technical specifications, drawings and as directed by Engineer-in-Charge
61.1.3.1 Clay/Earth/Random Fill
72. SURFACE EXCAVATION AND BACKFILL
82.1 Surface excavation including loading, transport, all lift and lead up to 3.0 km from the excavation area/working site, unloading at disposal sites or stockpiles and maintenance of the disposal sites or stockpiles. Construction of haul roads (if any) and its maintenance. Complete in all respect as per technical specification, drawings and as directed by Engineer- in-Charge.
92.1.1 Diversion Tunnel
102.1.1.1 Clearing of excavation areas, disposal areas and stockpiles
112.1.1.2 Excavation in soil including stripping of top soil
122.1.1.3 Excavation in soft and disintegrated rock
132.1.1.4 Excavation in hard rock
14(a) Drilling and blasting
15(b) Line-drilling
162.1.2 Cost of Haulage including loading & unloading of excavated materials For all types of Tracks beyond initial lead of 3.00km (Lead = 2 km)
172.1.3 Backfilling
18(a) Random backfill
19(b) Selected backfill
20(c)Free-draining backfill
21(d) Sand-gravel backfill
222.1.4.1 Providing and laying Pitching complete as per drawings and technicalspecifications at locations as directed by the Engineer-in-Charge Stone/ Boulders
232.1.4.2 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawings and technical specification. Boulders laid without wire crates
243. UNDERGROUND EXCAVATION
253.1 Underground excavation of Diversion Tunnel including excavation by drill and blast, mechanical, manual or conventional methods; including all survey and setting-out, all lifts, transportation and unloading at disposal sites upto 3.0 km from the nearest portal and including maintenance of the disposal sites or stockpiles. Construction of haul roads (if any) and its maintenance. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge.
263.1.1 Diversion Tunnel including handling of excavated materials upto 3.0 km from the nearest portal
27(a) Excavation in class 2
28(b) Excavation in class 3
29(c) Excavation in class 4
30(d) Excavation in class 5
313.1.2 Loading, transport including all lift and lead upto 3.0 km and unloading of accepted geological overbreak of Diversion Tunnel at disposal areas or stockpiles
323.1.3 Cost of Haulage including loading & unloading of excavated materials Katcha Track beyond initial lead of 3.00km (Lead = 2 km)
334. ROCK SUPPORT
344.1 Rock support for underground excavation of Diversion Tunnel including all plants, materials and labour. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge.
354.1.1 Shotcrete M25 including admixtures in underground works with articulated wet type shotcrete machine to the theoretical thickness as shown on the drawings or as directed by the Engineer-in-charge
36(a) Without Steel Fibre Reinforcement
37(b) With Steel Fibre Reinforcement
384.1.2 Supply and fixing in position Precast R.C.C. laggings
394.1.3 Supply and installation of resin/cement grouted rock bolts of any size and length in underground excavations, as shown on the drawings or as directed by the Engineer-in- charge, including all plants, materials and labour required for drilling, cleaning, installing, grouting and testing of the bolts. Complete in all respect
40(a) 25mm dia
41(b) 32mm dia
424.1.4 Supply and installation of Swellex Type rock bolts of any size and length in underground excavations, as shown on the drawings or as directed by the Engineer-in-charge, including all plants, materials and labour required for drilling, cleaning, installing, grouting and testing of the bolts. Complete in all respect 25 mm dia
434.1.5 Fabrication and erection of Steel ribs as permanent support as per the drawings or as directed by the Engineer-in-charge including all plants, materials, labour and accessories. Complete in all respect
444.1.6 Supply and providing of Forepoling with grouted anchor bars, length, dia, spacing and overlap to be determined on site by the Engineer-in-charge including all plants, materials and labour. Complete in all respect
454.1.7 Providing & fixing high tensile seamless pipe casing (minimum 21m long) of dia. 76-139mm & thickness 6-10mm, driven into medium using symmetrix drilling system (or equivalent) using sacrificial drill bits with all materials, accessories, equipments-machineries and labour ect. as per technical specification, drawings and as directed by Engineer-in-Charge complete in all respect.
464.1.8 Providing steel canopy support in underground excavation (HRT) including supplying , fabrication and installation at site with all materials, accessories, equipments-machineries and labour ect. as per technical specification, drawings and as directed by Engineer-in- Charge complete in all respect.
474.1.9 Welded Wire Mesh
485. SLOPE PROTECTION
495.1 Slope protection in surface excavation including all plants, materials and labour. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge
505.1.1 Rip-Rap
515.1.1.1 Bedding
525.1.1.2 Rip-Rap
535.1.2 Rock Paving
545.1.2.1 Dry rock paving
555.1.2.2 Rock paving in mortar
565.1.3 Gabions
575.1.4 Masonary walls
585.1.5 Supply and installation of resin/cement grouted rock bolts of ø 25 mm, length = variable in surface excavations, as shown on the drawings or as directed by the Engineer-in-charge, including all plants, materials and labour required for drilling, cleaning, installing, grouting and testing of the bolts. Complete in all respect
595.1.6 Shotcrete M25 including admixtures in open excavation with dry type/articulated wet type shotcrete machine to the theoretical thickness as shown on the drawings or as directed by the Engineer-in-charge
605.1.6.1 Without Steel Fibre Reinforcement
615.1.6.2 With Steel Fibre Reinforcement
625.1.7 Wire mesh
635.1.7.1 Chain link fabric/Welded wire mesh
64(a) Welded Wire Mesh
655.1.8 Supply and Installation of Grouted Anchor Bars of any size and length alongwith all plants, materials and labour required or drilling, cleaning, installing and grouting. Complete in all respect
665.1.8.1 25 mm dia
675.1.8.2 32mm dia
686. CONCRETE
696.1 Complete in all respect with all plants, materials, formwork, scaffoldings, staging, labour, all lead and lift etc. as per technical specification, drawings and as directed by Engineer-in- Charge.
706.1.1 Plain/reinforced cement concrete in Inlet & Outlet Structures, etc.
716.1.1.1 M15-40
726.1.1.2 M20-40
736.1.1.3 Concrete block for launching apron (M 15-40)
746.1.1.3.1 Second stage concrete in blockout including formwork
756.1.1.4 M25-20
766.1.1.5 M-15 in backfill, foundation & earth retaining structures
776.1..2 Plain/reinforced cement concrete in Diverson Tunnel
786.1.2.1 Cement concrete of M25 grade in Diversion Tunnel lining including formwork
796.1.2.2 Backfilling upto pay line with M20 concrete
806.1.2.3 Backfilling of accepted geological overbreak (upto 7% of pay line) with M20 concrete for Diversion Tunnel
817. STEEL FOR REINFORCEMENT
827.1 Complete in all respect with all plants, materials, labour, all lead and lift etc. as per technical specification, drawings and as directed by Engineer-in-Charge.
837.1.1 Mild Steel Reinforcement
847.1.2 High yield strength deformed reinforcement
857.1.2.1 Diversion Tunnel
867.1.2.2 Inlet & Outlet Structures
878. DRILLING
888.1 Complete in all respect with all plants, materials and labour as per technical specification, drawings and as directed by Engineer-in-Charge.
898.1.1 Percussion drilling
908.1.1.1 Diversion Tunnel
91(a) Drill holes up to ø 48 mm, length 10 - 30 m
928.1.2 Rotary drilling
938.1.2.1 Diversion Tunnel
948.1.2.1.1 Drill holes up to ø 76/80 mm, length < 30 m
958.1.3 Installation of pipes
968.1.3.1 Supply and installation of PVC pipes of 76mm dia (plain or slotted) including fittings and accessories
978.1.4 Drilling for Pre- Grouting
988.1.4.1 Drill holes up to ø 45 mm upto 10mm long for Pre-Grouting with Cement
998.1.4.2 Drill Holes up to 57mm upto 30m long for Pre-Grouting with Colloidal Silica
1009. GROUTING
1019.1 Complete in all respect with all plants, materials and labour as per technical specification, drawings and as directed by Engineer-in-Charge.
1029.1.1 Contact grouting, grouting pressure = 2 to 5 kg/cm2
1039.1.1.1 Contact grouting behind tunnel liner (concrete or steel)
1049.1.2 Consolidation and curtain grouting (grouting pressure = 2 to 20 kg/cm2)
1059.1.2.1 Diversion Tunnel, Inlet, Outlet, Portal and in any other areas as directed by the Engineer-in Charge
106(a) Single - stage grouting
107(b) Multiple - stage grouting, descending
108(c)Multiple - stage grouting, ascending
109(d) sand to be used in sand-cement grouting
110(e) Pre-grouting with Cement
111(f) Pre-grouting with Colloidal Silica
1129.1.3 Water pressure testing
1139.1.3.1 Simple water pressure tests
1149.1.3.2 Comprehensive water pressure tests
11510. INSTRUMENTATIONS AND MONITORING
11610.1 Tape extensometer station
11710.2 Optical convergence measurement station
11811. MISCELLENEOUS STEEL SECTIONS
11911.1 Supply, fittings & fixings of metal works in all structure. Complete in all respect with all plants, materials and labour as per technical specification, drawings and as directed by the Engineer-in-Charge
12011.1.1 Supply & Installation of Steel Pipes
12111.1.1.1 75 mm dia.
12211.1.1.2 100 mm dia.
12311.1.1.3 200 mm dia.
12411.1.1.4 300 mm dia.
12511.1.2 Miscelleneous Steel Sections
12611.1.3 Ladders & Climbing Iren
12711.1.4 Erection Hooks
12811.1.5 Steel Anchoring
12911.1.6 Supply & installation of Non Return Valve in Diversion Tunnel
13012. HYDRO-MECHANICAL WORKS
13112.1 Design, supply, manufacture, inspection, shop assembly, painting, transportation, site storage & site erection, testing & commissioning including all labor, tools, tackles, plant & material of 4100 mm x 10400 mm fixed wheel type Diversion Tunnel Gate complete with accessories like wheels, guide Rollers, seals, lifting lugs and embedded parts including sill beam, seal seats, guides, tracks, etc. in accordance with technical specifications, drawing and as per instruction of the Engineer-In-Charge.
13212.1.1 Gate Leaf: 1. Cost of Design & Drawings 2. Material Cost 3. Fabrication Cost including painting 4. Transportation Cost including Insurance 5. Cost of erection including cost of labour tools, tackles, plant & machineries, etc.
13312.1.2 Embedded Parts: 1. Cost of Design & Drawings 2. Material Cost 3. Fabrication Cost including painting 4. Transportation Cost including Insurance 5. Cost of erection including cost of labour tools, tackles, plant & machineries, etc.
13412.2 Steel Lining upstream & downstream of gate groove including groove lining including all necessary embedment and stiffeners complete as per specifications and drawings to the satisfaction of Engineer-in-Charge:
13512.2.1 Break-up: 1. Cost of Design & Drawings 2. Material Cost 3. Fabrication Cost including painting 4. Transportation Cost including insurance 5. Cost of erection including cost of labour, tools, tackles, plant & machineries, etc.
13612.3 Design, manufacture, inspection, shop assembly, painting, transportation, site storage & site erection, testing & commissioning including all labor, tools, tackles, plant & material of electrically operated rope drum hoists suitable for operation of diversion tunnel gate of size 4100 mm x 10400 mm under conditions specified in technical specification complete with all accessories including local control panels, trestles and hoist bridge in accordance with the specifications and drawings to the satisfaction of Engineer-In-Charge.
13712.3.1 Break-up: 1. Cost of Design & Drawings 2. Material Cost 3. Fabrication Cost including painting 4. Transportation Cost including Insurance 5. Cost of erection including cost of labour, tools, tackles, plant & machineries, etc.
13812.4 Design, manufacturer & supply at site of the spare parts as per list given in the technical specification
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail