Tender For Overhauling Of Mechanical System For Ash Handling Plant Of U 4 Stg Ii, sagardighi-West Bengal

West Bengal Power Development Corporation Limited has published Tender For Overhauling Of Mechanical System For Ash Handling Plant Of U 4 Stg Ii. Submission Date for this Tender is 23-12-2023. Ash Handling Machine Tenders in sagardighi West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

40880233
Tender For Overhauling Of Mechanical System For Ash Handling Plant Of U 4 Stg Ii
Open Tender
Indian
West Bengal
sagardighi
23-12-2023

Tender Details

Overhauling Of Mechanical System For Ash Handling Plant Of U 4 Stg Ii

Key Value

Document Fees
Refer document
EMD
INR 74405.0 /-
Tender Value
INR 37.35 Lakhs /-

BOQ Items

Name of Work:Overhauling of Mechanical system for Ash Handling plant of U#4, Stg - II
Sl. No. Item Description
1Job description
2BA Feed gate actuator cylinder dismantling, cylinder seal kit checking if require replacement, gasket fitting and cylinder fitting, if require then cylinder replacement.
3BA Feed gate alignment, checking/ Replacement of side guide angles, rollers, wedges including water leakage arrest from enclosure body & view glass checking and replacement, if required.
4BA Clinker grinder overhauling (Dismantling of crusher, checking/replacement of shaft, cam segments, sleeve, bearings, wear plates, sprocket etc.)and/or replacement of complete assembly of clinker grinder
5BA Clinker Grinder gear box & fluid coupling checking, oil replacement/bearing replacement. Alignment of motor to gear box to clinker grinder. Gear box/Fluid coupling replacement if necessary.
6BA Jet Pulsion pumps overhauling including checking/replacement of nozzle tip, nozzle plate, wear piece intermediate, throat increaser.
7BA hopper four side trough seal nozzle checking, welding of nozzle pipe.Seal trough cleaning & water flushing.
8BA clinker grinder feed sump checking, Repairing/replacement, welding, painting and refitting.
9BA hopper all wall jetting nozzle checking/replacement.
10Checking of BA area KGV, then servicing/replacement if required.
11Checking & servicing/replacement of Water line valves (Gate, Globe and Plug) at BA area.
12Refractory work inside BA hopper with Supply of refractory, fire crete special castable recommended service temp. 1350 deg C, refractoriness (min) 1450 deg C, dry density (kg/m3) 2250, cold crushing strength (kg/cm2) 400(at 110 deg C) and 300 (at 1350 deg C), Pack size 50 kg with supply of anchor fasteners(if required) & wire mesh
13Refractory cooling header(100NB,SS316) And cooling water supply pipe(25 NB, SS 316)checking, fabrication & replacement
14Checking and replacement of coupling gasket along with replacement of fittings (elbow, lateral etc.) for 250NB BA Slurry pipeline below BAH area
15Replacement of 250NB BA Slurry pipeline near BA Hopper area (3 nos. pipelines)
16Checking and Servicing/Replacement of Economizer hopper KGV
17Checking/replacement if required of drop pipe below each eco hopper & Fabrication & erection of adaptor below each Economizer hopper
18Replacement of 200 NB MS discharge pipe from flushing apparatus including fabrication of miter cut bends and reducers.
19Replacement of 300 NB MS/ DRC Pipe Common discharge pipe below economizer flushing apparatus including fabrication and erection of discharge cone of individual flushing apparatus discharge pipe up to BA hopper and others areas at AHP as required
20Dry & wet cleaning of Economizer hoppers
21Dry & wet cleaning of ash from insideof Air Preheated hoppers
22Vacuum line Gasket checking and replacement
23Overhauling of ESP Material Handling valve replacement if required.
24Overhauling of APH Material Handling valve replacement if required.
25Replacement of ESP hopper fluidizing tiles
26Wetting head nozzle cleaning / replacement
27Wetting head replacement if required
28Replacement of Collector tank cone
29Checking/replacement (if required) of Impingement plate/wear plate/baffle plate inside each Collector tank.
30Checking/replacement (if required) of Collector tank drop pipe.
31Wet mode air washer nozzle cleaning/ replacement. Ash cleaning inside of air washer.
32Fluidizing airline flushing/cleaning For ESP hoppers
33Fly ash pipeline (6”, 8” & 10”) checking /replacement, if required
34Fly ash pipe line (vacuum line)bend, elbow, lateral, match piece checking & replacement
35Checking/servicing/replacement of Segregating valves 200 NB and 250 NB.
36Checking/servicing/Replacement of vacuum breakers
37Servicing / Replacement of all water line valves of FAE Tower ,necessary rectification if required
38Water washing of 200 NB Vacuum line from Vacuum pump to Collecter Tank, Vacuum Pump and Silencer
39Adopter below ESP Hoppers & APH Hoppers Checking, repairing & replacement if required
40Checking and Servicing/replacement of Manual KGV below ESP & APH Hoppers
41Replacement of different sizes of water pipeline (200 NB& above )
42Replacement of different sizes of water pipeline (15 NB to 150 NB )
43Cleaning ofBuffer hopper, Intermediate Surge hopper, Transfer hopper, Air lock vessels and disposal of ash from worksite to suitable place (as per instruction of department) for FAE tower #4A & #4B
44Each Air lock vessel’s top & bottom gate seat and disc checking/replacement(if required)
45Each air lock vessel’s vent/equalizing
46Intermediate Surge hopper wall body welding checking, repairing and strengthening
47Checking/replacement of each Transfer vessel fluidizing tiles, top & bottom gate, vent/equalizing valve
48Checking/repairing/replacement of square tiles with gasket of Intermediate Surge hopper.
49Checking/cleaning/replacement of total filter bags for all buffer hoppers of FAE tower #4A & #4B including pulse jetting bar.
50Installation of different types of valves (20 NB to 250 NB) for ash handling system
51Fabrication & Erection of Platforms & walkway with hand rail at different areas at AHP, STG-2 (i)Walk-way with hand rail through Common Eco hopper discharge header for U#4. (ii)Platform with hand rail at HP water supply line isolation valve to Eco hoppers (U#4) (iii) Platform with handrail at each BA Hopper feed gate power cylinder (total- 6 nos) for maintenance purpose (iv) Platform with handrail at different location as requitedat FAE Tower – 4A & 4B vertical Fly ash vacuum conveying line for coupling/pipe maintenance purpose (v)Vacuum pump silencer body repairing/refurbishment work (10 nos. silencer)
52Couplings /Bends/Lateral checking and rectification by fabrication if required for 200NB and above pipe lines
53Replacement/repairing of flushing Apparatus of Economizer hoppers
54Replacement/repairing of seal box of Economizer hoppers
55Dismantling & Replacement of bottom ash hopper feed gate including pneumatic cylinder assembly
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail