}

Tender For Formation Of Bt Road At Ward No: 15 Kattukottai Cross Street Iii ( Thenkarai Bg Road ) In Veeraganur Town Panchayat Salem District., Salem-Tamil Nadu

Town Panchayats-TP has published Tender For Formation Of Bt Road At Ward No: 15 Kattukottai Cross Street Iii ( Thenkarai Bg Road ) In Veeraganur Town Panchayat Salem District.. Submission Date for this Tender is 12-12-2023. Road Work Tenders in Salem Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

40874467
Tender For Formation Of Bt Road At Ward No: 15 Kattukottai Cross Street Iii ( Thenkarai Bg Road ) In Veeraganur Town Panchayat Salem District.
Open Tender
Indian
Tamil Nadu
Salem
12-12-2023

Tender Details

Formation Of Bt Road At Ward No: 15 Kattukottai Cross Street Iii ( Thenkarai Bg Road ) In Veeraganur Town Panchayat Salem District.; 1 Earth Work Excavation For Foundation And Depositing On Bank With In The Initial Lead Of 10M And A Lift Of 2M In Hard Stiff Clay, Stiff Block Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Boulders Etc., As Per Ss 20 A. Tndss No: 23 & 24 Vi ( S2 ) Vi, Vii 9, 10With Standard Specifications. 2 Construction Of Granular Sub-Base By Providing Close Graded Material, Mixing In A Machanical Plant At Omc, Carriage Of Mixed Material To Work Site, Spreading In Uniform Layers With Motor Grader On Prepared Surface And Compacting With Vibratory Power Roller To Acheive The Desired Density, Complete As Per Clause 401. 3 Providing And Laying U / S Gravel To The Specified Thick Including Cost And Conveyance Ofu / S Gravel From Approved Quarry And Stocking The Same At Road Side To Departmental Guage For Premeasurement As Directed By The Departmental Officers Including Labour Charges For Spreading In Layers Not Exceeding 75 Mm Thick ( Or ) As Specified By The Departmental Officers, Levelling, Sectioning Etc., And All Other Charges For Tools And Plants Employed For The Work And All Other Incidental Charges Such As Barricading And Providing Danger Lights Etc., Complete As Per Standard Specification. As Per Clause 301 & 305 Of Morth 4 Providing And Laying, Spreading And Compacting Graded Stone Aggregates To Wet Mix Macadamspecification Including Premixing The Materials With Waterat Omc In Mechnanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying Inuniform Layers With Paver Sin Sub Base / Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Acheive The Desired Density Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete As Per Clause 406 Of Morth Rev-5 5 Providing And Laying Prime Coat Over Wbm / Wmm Surface Using 7Kg Of Emulsion Bitumen ( Ss1 ) Per 10Sqm For Preparatory To Another Bituminous Construction Over It, Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete As Per Clause 502 Of Morth Rev-5 6 Providing And Laying Tack Coat Over Wbm / Wmm Surface ( Treated With Primer ) Using 2.50Kg Of Bitumen Emulsion ( Rs1 ) Per 10Sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete As Per Clause 503 Of Morth Rev-5 7 Providing And Laying 50Mm Consolidated Thick Dense Bituminous Macadam Using 0.24Cum Of 26.50-13.20Mm, 0.25Cum Of 13.20-2.36Mm And 0.23Cum Of 2.36Mm & Below And With 53.20Kgs Of Vg30 / Vg40 Bitumen For Premixing Per 10Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregate To Required Temperature And Mixing The Min Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Conveying The Mix By Tipper Trucks To Work Site, Spreading The Mix To Uniform Thickness Of 50Mm With Paver To The Specified Grades And Cross Sections And Compacted By Vibratory / Pneumatic Roller To The Required Density Etc., Including Labour For Attending To Paver At Site Etc., Including Hire Charges And Fuel Charges For 20-30T Cmp With Bitumen Boiler, Tipper Trucks, Paver Finisher / 9M Paver Finisher, Vibratory / Pneumatic Rollers And All Other Tools And Plant Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clause 505 Morth Rev-5 8 Providing And Laying Bituminous Concrete 30Mm Consolidated Thick Using 0.13 Cum Of 19.00 – 9.50Mm, 0.17 Cum Of 9.50-2.36Mm And 0.26 Cum Of2.36 Mm & Below With 50.30 Kgs Of 60 / 70 Grade Bulk Bitumen For Premixing Per 10 Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20 – 30 Ton Capacity, Conveying The Mix By Tipper Trucks To Paver Site, Spreading Themix To Uniform Thickness Of 40 Mm With Mechanical Pavers To The Specified Grades And Cross Sections And Compaction By Vibratory / Pneumatic Rollers To The Required Density Etc., Including Labour For Loading Bitumen Into Bitumen Tank And Metal To Feeder Unit, Labour For Attending To Paver Site Etc., Including Hire Charges And Fuel Charges For 20 – 30 Ton Cmp With Bitumen Boiler Tipper, Trucks, Paver Finisher / 9M, Vibrator Rollers And All Other Tools And Plants Required, Including All Other Incidental Charges Etc., Complete As Per Standard Specification Using Cmp Clause 507 Of Morth Rev-5 9 Earthwork Excavation In All Soils And Sub Soils Except Hard Rock Requiring Blasting With Initial Lead And Lift Including Re-Filling The Sides Of Foundation In Layer Of 15 Cm Thick Watering , Ramming , Depositing The Surplus Earth In The Premises As Directed By Departmental Officers Etc., Complete As Per Standard Specification. As Per Ss 20 B Tndss No: 23&24Vi ( S2 ) , Vii 9, 10 10 Plain Cement Concrete 1:4:8 Mix ( One Part Of Cement, Four Part Of Sand And Eight Part Of Aggregates ) Using 40 Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Work Site And All Labour Charges For Mixing, Laying, Consolidating And Curing Etc Complete As Per The Standard Specifications. Tndss No: 28 V, Vi ( S2 ) V, Vi ( S5a ) Vii 11 Supplying And Errecting Centering To Sides And Soffits Including Supports And Struttingfor Drainage Sides Andculvert Body Wall Sidesusing 90Cm X 60Cm And B.G 10Stifenedwith Welded Mild Steel Angles Of Size 25Mm X 25Mm X 3Mm For Boardinglaid Over ( Silver Oak Joists ) Of Size 10Cm X 6.50Cm Spaced At About 90Cm Including All Labour Charges And Cost And Conveyance Of All Materials To Site Etc. Complete Complying With Standard Specification. Tndss No: 30&86 12 Upto 1 Mtr 13 Above 1 Mtr 14 Plain Cement Concrete 1:2:4 Mix ( One Part Of Cement, Two Part Of M- Sand And Four Part Ofaggrigate ) Using 20Mm Size Iss Hbg Metal Machine Crushed From Approved Quarry Including Cost And Conveyance Of All Materials To Site, Loading And Unloading Charges And Labour Charges For Mixing, Laying And Curing Etc., Complete As Per Tndss No: 28 & Vi ( S2 ) Vi ( S5a ) Vii Standard Specifications As Directed By Engineer Incharge. 15 Supplying And Fabrication Of Steel And Placing In Position Of Tmt Steel Rods For Rcc Works As Per Design Given Including Cost Of Steel And Gi Binding Wire In All Floors Etc., Complete Complying With Standard Specification In Tndss No:97 V, Vi ( S6 ) Vii ( S6 ) , Vii-3. 16 Reinforced Cement Concrete 1:1.5:3 Mix ( One Part Cement, Two Part Sand And Four Part Of Aggregate ) Using 20Mm Size Iss Hbg Metal Machine Crushed From Approved Quarry Including Cost And Conveyance Of All Materials To Site, Loading And Unloading Charges And Labour Charges For Mixing, Laying And Curing But Excluding Cost Of Reinforcement Etc.Complete With Std.Specifications.Tndss No: 30 V, Vi ( S3 ) , Vii-3. 17 Finishing The Top Of Flooring With Granothatic Flooring With Cement Concrete 1:2:4 ( One Cement, Two Sand And Four Aggrigate ) Using 10 To 12Mm Stone Chips – 25Mm Tk Etc., Complete. 18 Towards The Charges For Routine Maintenance Of The Road Work Executed Under Nabard Scheme Including Dressing Of Berms By Refilling The Gully With The Earth From Borrow Pits, Cleaning Of Wild Seasonal Growth On Berms, Destilting Of Side Drains And Cd Works, White Washing Guard Stones, Painting Of Km, Hm Stones, Parapets, Cutting Of Branches Of Trees, Refixing Displaced Guard Stones, Caution Boards, Speed Limit Boards Etc., With The Periodicity For The Above Activities As Prescribed In Irc-Sp-20:2002 And As Directed By The Departmental Officers Except For The Constructional Defects Which Has To Be Rectified By The Contractor At His Own Cost. 19 Clearing And Grubbing By Lightjungle Removing And Disposing Of All Materials Such As Bushes, Shrubs, Stumps, Roots, Grass, Weeds, Top Organic Soil Not Exceeding 150Mm In Thickness As Rubbish Including All Other Incidental Charges Etc., Complete As Per Morth Specification 111, 112, 201. 20 Upkeeping 1St Year ( 50% ) 21 Upkeeping 2Nd Year ( 60% ) 22 Upkeeping 3Rd Year ( 60% ) 23 Upkeeping 4Th Year ( 60% ) 24 Upkeeping 5Th Year ( 60% ) 25 Earth Work Excavating And Deposting On Bank With Initial Lead Of 10M & Initial Lift Of 2M In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Boulders Ss20a For Making Up The Berms. As Per Clause 111, 112, 201, 202, 301 To 305 & 900 Of Morth Vth Revision [ Twice In A Year ] 26 Upkeeping For 1St Year ( 40% ) 27 Upkeeping For 2Nd Year ( 40% ) 28 Upkeeping For 3Rd Year ( 40% ) 29 Upkeeping For 4Th Year ( 40% ) 30 Upkeeping For 5Th Year ( 40% ) 31 Tack Coat- Providing And Applying Tack Coat With Bitumen Emulsion ( Rs-I Type ) Using Emulsion Pressure Distributor At The Rate Of 0.20 Kg / Sqm On The Prepared Bituminous / Granular Surface Cleaned With Mechanical Broom As Per Clause 503 32 4 Th Year 3% 33 5 Th Year 5% 34 Providing And Laying Bituminous Concrete 30Mm Consolidated Thick Using 0.13 Cum Of 19.00 – 9.50Mm, 0.17 Cum Of 9.50-2.36Mm And 0.26 Cum Of2.36 Mm & Below With 50.30 Kgs Of 60 / 70 Grade Bulk Bitumen Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20 – 30 Ton Capacity, Conveying The Mix By Tipper Trucks To Paver Site, Spreading Themix To Uniform Thickness Of 40 Mm With Mechanical Pavers To The Specified Grades And Cross Sections And Compaction By Vibratory / Pneumatic Rollers To The Required Density Etc., Including Labour For Loading Bitumen Into Bitumen Tank And Metal To Feeder Unit, Labour For Attending To Paver Site Etc., Including Hire Charges And Fuel Charges For 20 – 30 Ton Cmp With Bitumen Boiler Tipper, Trucks, Paver Finisher / 9M, Vibrator Rollers And All Other Tools And Plants Required, Including All Other Incidental Charges Etc., Complete As Per Standard Specification Using Cmp Clause 507 Of Morth Rev-5 35 4 Th Year 3% 36 5 Th Year 5%

Key Value

Document Fees
Refer document
EMD
INR 210000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Formation of BT Road at Ward No: 15 Kattukottai Cross Street III ( Thenkarai BG Road ) in Veeraganur Town Panchayat Salem district.
Sl. No. Item Description
1Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10with standard specifications.
2Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
3Providing and laying U/s Gravel to the specified thick including cost and conveyance ofU/s gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
4Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadamspecification including premixing the materials with waterat OMC in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
5Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as per Clause 502 of MORTH Rev-5
6Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
7Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
8Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
9Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
10Plain cement concrete 1:4:8 mix( One Part of Cement,Four Part of Sand and Eight Part of aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
11Supplying and errecting centering to sides and soffits including supports and struttingfor drainage sides andculvert body wall sidesusing 90cm x 60cm and B.G 10stifenedwith welded mild steel angles of size 25mm x 25mm x 3mm for boardinglaid over( silver oak joists ) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86
12UPTO 1 Mtr
13ABOVE 1 Mtr
14Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part ofaggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
15Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
16Reinforced Cement Concrete 1:1.5:3 Mix (One part cement, two part sand and four part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc.Complete with std.Specifications.TNDSS NO: 30 V, VI (S3),VII-3.
17Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
18Towards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
19Clearing and Grubbing by LightJungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MORTH Specification 111, 112, 201.
20Upkeeping 1st year (50%)
21Upkeeping 2nd year (60%)
22Upkeeping 3rd year (60%)
23Upkeeping 4th year (60%)
24Upkeeping 5th year (60%)
25Earth Work excavating and deposting on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS20A for making up the berms. as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision [Twice in a year]
26Upkeeping for 1st year (40%)
27Upkeeping for 2nd year (40%)
28Upkeeping for 3rd year (40%)
29Upkeeping for 4th year (40%)
30Upkeeping for 5th year (40%)
31Tack coat- Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503
324 th year 3%
335 th year 5%
34Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
354 th year 3%
365 th year 5%
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail