}

Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Hedua Park, Howrah-West Bengal

Department Of Information And Cultural Affairs has published Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Hedua Park. Submission Date for this Tender is 15-12-2023. Event Management Tenders in Howrah West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

40861766
Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Hedua Park
Open Tender
Indian
West Bengal
Howrah
15-12-2023

Tender Details

Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Hedua Park- 1 STAGE (for 8 days) 2 Stage : Stair Case, Mattress on floor, four side truss, tarpaulin & Cloth roofing with stage decoration (24 X 10 X 4) 3 Carpeting, Musking& Framing as qeruired 4 Floral decoration with coloured flower in front of stage 5 Ramp in both side of the stage 6 BACK DROP (for 8 days) 7 3D back drop (20’X10’) 8 Green Room (for 8 days): 9 20’X30’ attached with stage to be covered with tarpaulin & Octanum with curtain with mattress on floor and all other necessary equipments 10 Mirrors for green room 11 FURNITURE (for 8 days): 12 Tables (5’X3’) with cover for green room 13 VIP chairs 14 Low table with covers 15 Fiber Chair with cover 16 Wooden Chowki with White cover for stages 17 Sofa set for green room cum Office & for VVIP 18 BIO TOILET (for 8 days): 19 BIO TOILET (for 8 days): 20 VENUE BRANDING: Gates, Publicity etc. at Hedua Park premises with creativebranding ideas andcreative awareness (for 8 days): 21 STANDY8X4 IRON 22 HORDING 8’X6’ WOODEN 23 3-D customizedGate with decoration:Decoration of the gates will be made by flex painting (design CD will be supplied by I&CA Deptt 24 Walkway Pillar : Flex with iron frame (3’ X 8’) for inside the venue 25 Pole Pillar : Flex on wooden frame (3’ X 6’) for inside the venue 26 Help Desk : Table with frills (10’ x 10’ ) 27 Programme schedule : Flex on wooden frame(10’ x 20’ ) 28 Name Tags- Help desk : Acrylic with prints(6x2.5) 29 Directional Signages : VOS (2x1.5) 30 Walkway Pillar : Flex with iron frame (3’ X 8’) for outside the venue 31 Pole Pillar : Flex on wooden frame (3’ X 6’) for outside the venue 32 8X8 flex in wooden frame 33 CUTOUT (6x12) 34 SURROUNDING BRANDING (for 8 days) 35 16X4X30 (3d customized overhead gate) 36 HORRDING 8’X6’ WOODEN 37 COLOURFULL FLAGS ON ROPE 38 COLOURFULL FLAGS ON POLE 39 F&B : 40 Arrangement of 200 food packets per day for Artists, Officials & Others for 8 days per packets @ INR 160 41 Arrangement of 200 tea / coffee per day for Artists, Officials & Others for 8 days @INR 12 per cup 42 Manpower (for 8 days) 43 Supervisor 44 Boys 45 Security (8hrs-3shifts) 46 SOUND (for 8 days): 47 Speaker Stand 48 Stage Monitor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 49 Out Box Speaker(Low & Top).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 50 Amplifier.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 51 Audio Mixing Console (48 channels) with Effect Processor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 52 Microphones (with stands) & Gooseneck Microphone 53 Cordless microphones 54 DVD player 55 Voltage Stabilizer (10 kw).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 56 Clearcom 57 Power board for Stage.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 58 Technician 59 Installation/Operation 60 Goal Post (3side C Shape) Truss as per Stage measurement 61 T-Truss 62 Installation of Stage Lighting (for 8 days): 63 S&F Thousand watt halogen Lamp (1000watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 64 S&F Metal hailed lamp fitting (400watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 65 Par 65.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 66 LED Par.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 67 Light engineer 68 Surphee.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 69 Moving Head.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 70 Haze.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 71 Installation Of Venue Lighting (for 8 days): 72 Metal 400 watt.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 73 Led rice lamp.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 74 Electricity charges (On actual basis) 75 125KVA Genset for Power (for 8 days): 76 S&F Generator, 125 KVA, sound proof, for electricity supply and power backup (Fuel cost will be provided separately on the basis of actual consumption including one skilled manpower charge as per Labour Departments Order) 77 S&F Generator, 62.5 KVA, sound proof, for electricity supply and power backup (Fuel cost will be provided separately on the basis of actual consumption including one skilled manpower charge as per Labour Departments Order) 78 DOCUMENTATION: (for 8 days) 79 Still Photography 80 Video Photography 81 Govt. taxes 82 Including all Govt. taxes

Key Value

Document Fees
Refer document
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Engagement of Event Management Agency for the work related to stage, logistic, stage run, Venue Branding and Lighting, Hospitality, manpower, ushers etc. for Bangla Sangeet Mela-2023 at Hedua Park
Sl. No. Item Description
1STAGE (for 8 days)
2Stage : Stair Case, Mattress on floor, four side truss, tarpaulin & Cloth roofing with stage decoration (24 X 10 X 4)
3Carpeting, Musking& Framing as qeruired
4Floral decoration with coloured flower in front of stage
5Ramp in both side of the stage
6BACK DROP (for 8 days)
73D back drop (20’X10’)
8Green Room (for 8 days):
920’X30’ attached with stage to be covered with tarpaulin & Octanum with curtain with mattress on floor and all other necessary equipments
10Mirrors for green room
11FURNITURE (for 8 days):
12Tables (5’X3’) with cover for green room
13VIP chairs
14Low table with covers
15Fiber Chair with cover
16Wooden Chowki with White cover for stages
17Sofa set for green room cum Office & for VVIP
18BIO TOILET (for 8 days):
19BIO TOILET (for 8 days):
20VENUE BRANDING: Gates, Publicity etc. at Hedua Park premises with creativebranding ideas andcreative awareness (for 8 days):
21STANDY8X4 IRON
22HORDING 8’X6’ WOODEN
233-D customizedGate with decoration:Decoration of the gates will be made by flex painting (design CD will be supplied by I&CA Deptt
24Walkway Pillar : Flex with iron frame (3’ X 8’) for inside the venue
25Pole Pillar : Flex on wooden frame (3’ X 6’) for inside the venue
26Help Desk : Table with frills (10’ x 10’  )
27Programme schedule : Flex on wooden frame(10’ x 20’  )
28Name Tags- Help desk : Acrylic with prints(6"x2.5")
29Directional Signages : VOS (2"x1.5)
30Walkway Pillar : Flex with iron frame (3’ X 8’) for outside the venue
31Pole Pillar : Flex on wooden frame (3’ X 6’) for outside the venue
328"X8" flex in wooden frame
33CUTOUT (6"x12")
34SURROUNDING BRANDING (for 8 days)
3516X4X30 (3d customized overhead gate)
36HORRDING 8’X6’ WOODEN
37COLOURFULL FLAGS ON ROPE
38COLOURFULL FLAGS ON POLE
39F&B :
40Arrangement of 200 food packets per day for Artists, Officials & Others for 8 days per packets @ INR 160
41Arrangement of 200 tea / coffee per day for Artists, Officials & Others for 8 days @INR 12 per cup
42Manpower (for 8 days)
43Supervisor
44Boys
45Security (8hrs-3shifts)
46SOUND (for 8 days):
47Speaker Stand
48Stage Monitor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
49Out Box Speaker(Low & Top).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
50Amplifier.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
51Audio Mixing Console (48 channels) with Effect Processor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
52Microphones (with stands) & Gooseneck Microphone
53Cordless microphones
54DVD player
55Voltage Stabilizer (10 kw).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
56Clearcom
57Power board for Stage.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
58Technician
59Installation/Operation
60Goal Post (3side "C" Shape) Truss as per Stage measurement
61T-Truss
62Installation of Stage Lighting (for 8 days):
63S&F Thousand watt halogen Lamp (1000watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
64S&F Metal hailed lamp fitting (400watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
65Par 65.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
66LED Par.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
67Light engineer
68Surphee.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
69Moving Head.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
70Haze.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
71Installation Of Venue Lighting (for 8 days):
72Metal 400 watt.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
73Led rice lamp.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
74Electricity charges (On actual basis)
75125KVA Genset for Power (for 8 days):
76S&F Generator, 125 KVA, sound proof, for electricity supply and power backup (Fuel cost will be provided separately on the basis of actual consumption including one skilled manpower charge as per Labour Department"s Order)
77S&F Generator, 62.5 KVA, sound proof, for electricity supply and power backup (Fuel cost will be provided separately on the basis of actual consumption including one skilled manpower charge as per Labour Department"s Order)
78DOCUMENTATION: (for 8 days)
79Still Photography
80Video Photography
81Govt. taxes
82Including all Govt. taxes
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail