}

Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Rabindra Sadan, Howrah-West Bengal

Department Of Information And Cultural Affairs has published Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Rabindra Sadan. Submission Date for this Tender is 15-12-2023. Event Management Tenders in Howrah West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

40858978
Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Rabindra Sadan
Open Tender
Indian
West Bengal
Howrah
15-12-2023

Tender Details

Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Rabindra Sadan- 1 BACK DROP (for 8 days) 2 3D back drop (20’X10’) with wooden structure or iron structure. 3 FLOWER DECORATION : (for 8 days) 4 Floral Decoration with coloured flower in front of the stage 5 FURNITURE (for 8 days): 6 Tables (5’X3’) with cover for green room 7 VIP chairs 8 Low table with covers 9 Fiber Chair with cover 10 Wooden Chowki with White cover for stages 11 Venue Branding,gates, Publicity, etc. at RABINDRA SADAN premises with creativebranding ideas andcreative awareness: (for 8 days) 12 3-D customizedGate with decoration:Decoration of the gates will be made by flex painting (design CD will be supplied by I&CA Deptt 13 Help Desk : Table with frills (10’ x 10’ ) 14 Programme schedule : Flex on wooden frame(10’ x 20’ ) 15 Name Tags- Help desk : Acrylic with prints(6x2.5) 16 Directional Signages : VOS (2x1.5) 17 SURROUNDING BRANDING (for 8 days) 18 16X4X30 (3d customized overhead gate) 19 F&B : 20 Arrangement of 230 food packet per day for Artists, Officials & Others for 8 days per packets @ INR 160 21 Dinner packets for artistes and guests @ Rs. 250/- (if required for whole night programme) 22 Arrangement of 200 tea / coffee per day for Artists, Officials & Others for 8 days @INR 12 per cup 23 Dinner packets for officials and other support staff @ Rs. 200/- (if required for whole night programme) 24 Manpower (for 8 days) 25 Supervisor 26 Boys 27 Security (8hrs-3shifts) 28 Installation of STAGE SOUND: (for 8 days) 29 Speaker Stand 30 Stage Monitor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 31 Out Box Speaker ( Low & Top).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 32 Amplifier.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 33 Audio Mixing Console (48 channels) with Effect Processor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 34 Microphones (with stands) & Gooseneck Microphone 35 Cordless microphones 36 DVD player 37 Voltage Stabilizer (10 kw).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 38 Clearcom 39 Power board for Stage.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 40 Sound Engineer 41 Technician 42 Installation/Operation 43 Goalpost 44 T-Truss 45 Installation of Stage Lighting (for 8 days): 46 S&F Thousand watt halogen Lamp (1000watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 47 S&F Metal hailed lamp fitting (400watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 48 Par 65.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 49 LED Par.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 50 Light engineer 51 Surphee.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 52 Moving Head.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 53 Haze.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 54 Installation Of Venue Lighting (for 8 days): 55 Metal 400 watt.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 56 Led rice lamp.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 57 DOCUMENTATION: (for 8 days) 58 Still Photography 59 Video Photography 60 Govt. taxes 61 Including all Govt. taxes

Key Value

Document Fees
Refer document
EMD
INR 30000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Engagement of Event Management Agency for the work related to stage, logistic, stage run, Venue Branding and Lighting, Hospitality, manpower, ushers etc. for Bangla Sangeet Mela-2023 at Rabindra Sadan
Sl. No. Item Description
1BACK DROP (for 8 days)
23D back drop (20’X10’) with wooden structure or iron structure.
3FLOWER DECORATION : (for 8 days)
4Floral Decoration with coloured flower in front of the stage
5FURNITURE (for 8 days):
6Tables (5’X3’) with cover for green room
7VIP chairs
8Low table with covers
9Fiber Chair with cover
10Wooden Chowki with White cover for stages
11Venue Branding,gates, Publicity, etc. at RABINDRA SADAN premises with creativebranding ideas andcreative awareness: (for 8 days)
123-D customizedGate with decoration:Decoration of the gates will be made by flex painting (design CD will be supplied by I&CA Deptt
13Help Desk : Table with frills (10’ x 10’  )
14Programme schedule : Flex on wooden frame(10’ x 20’  )
15Name Tags- Help desk : Acrylic with prints(6"x2.5")
16Directional Signages : VOS (2"x1.5)
17SURROUNDING BRANDING (for 8 days)
1816X4X30 (3d customized overhead gate)
19F&B :
20Arrangement of 230 food packet per day for Artists, Officials & Others for 8 days per packets @ INR 160
21Dinner packets for artistes and guests @ Rs. 250/- (if required for whole night programme)
22Arrangement of 200 tea / coffee per day for Artists, Officials & Others for 8 days @INR 12 per cup
23Dinner packets for officials and other support staff @ Rs. 200/- (if required for whole night programme)
24Manpower (for 8 days)
25Supervisor
26Boys
27Security (8hrs-3shifts)
28Installation of STAGE SOUND: (for 8 days)
29Speaker Stand
30Stage Monitor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
31Out Box Speaker ( Low & Top).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
32Amplifier.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
33Audio Mixing Console (48 channels) with Effect Processor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
34Microphones (with stands) & Gooseneck Microphone
35Cordless microphones
36DVD player
37Voltage Stabilizer (10 kw).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
38Clearcom
39Power board for Stage.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
40Sound Engineer
41Technician
42Installation/Operation
43Goalpost
44T-Truss
45Installation of Stage Lighting (for 8 days):
46S&F Thousand watt halogen Lamp (1000watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
47S&F Metal hailed lamp fitting (400watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
48Par 65.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
49LED Par.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
50Light engineer
51Surphee.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
52Moving Head.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
53Haze.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
54Installation Of Venue Lighting (for 8 days):
55Metal 400 watt.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
56Led rice lamp.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
57DOCUMENTATION: (for 8 days)
58Still Photography
59Video Photography
60Govt. taxes
61Including all Govt. taxes
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail