}

Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Sangeet Academy Mukta Mancha, Howrah-West Bengal

Department Of Information And Cultural Affairs has published Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Sangeet Academy Mukta Mancha. Submission Date for this Tender is 15-12-2023. Event Management Tenders in Howrah West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

40858941
Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Sangeet Academy Mukta Mancha
Open Tender
Indian
West Bengal
Howrah
15-12-2023

Tender Details

Engagement Of Event Management Agency For The Work Related To Stage, Logistic, Stage Run, Venue Branding And Lighting, Hospitality, Manpower, Ushers Etc. For Bangla Sangeet Mela-2023 At Sangeet Academy Mukta Mancha- 1 STAGE (for 8 days) 2 Stage :Mattress on floor, four side truss, tarpaulin & Cloth roofing with stage decoration 3 Carpeting, Musking& Framing as qeruired 4 Floral decoration with coloured flower in front of stage 5 BACK DROP (for 8 days) 6 3D back drop (20’X10’) 7 Green Room (for 8 days): 8 20’X30’ attached with stage to be covered with tarpaulin & Octanum with curtain with mattress on floor and all other necessary equipments 9 Mirrors for green room 10 FURNITURE (for 8 days): 11 Tables (5’X3’) with cover for green room 12 VIP chairs 13 Low table with covers 14 Fiber Chair with cover 15 Wooden Chowki with White cover for stages 16 Sofa set for green room cum Office & for VVIP 17 BIO TOILET (for 8 days): 18 BIO TOILET (for 8 days): 19 VENUE BRANDING: Gates, Publicity etc. at Madhusudan Prangan premises with creativebranding ideas andcreative awareness (for 8 days): 20 STANDY8X4 IRON 21 HOARDING 8’X6’ WOODEN 22 3-D customizedGate with decoration:Decoration of the gates will be made by flex painting (design CD will be supplied by I&CA Deptt 23 Walkway Pillar : Flex with iron frame (3’ X 8’) for inside the venue 24 Pole Pillar : Flex on wooden frame (3’ X 6’) for inside the venue 25 Help Desk : Table with frills (10’ x 10’ ) 26 Programme schedule : Flex on wooden frame(10’ x 20’ ) 27 Name Tags- Help desk : Acrylic with prints(6x2.5) 28 Directional Signages : VOS (2x1.5) 29 Walkway Pillar : Flex with iron frame (3’ X 8’) for outside the venue 30 Pole Pillar : Flex on wooden frame (3’ X 6’) for outside the venue 31 8X8 flex in wooden frame 32 CUTOUT (6x12) 33 SURROUNDING BRANDING (for 8 days) 34 16X4X30 (3d customized overhead gate) 35 HOARDING 8’X6’ WOODEN 36 COLOURFULL FLAGS ON ROPE 37 COLOURFULL FLAGS ON POLE 38 F&B : 39 Arrangement of 200 food packets per day for Artists, Officials & Others for 8 days per packets @ INR 160 40 Arrangement of 200 tea / coffee per day for Artists, Officials & Others for 8 days @INR 12 per cup 41 Manpower (for 8 days) 42 Supervisor 43 Boys 44 Security (8hrs-3shifts) 45 SOUND (for 8 days): 46 Speaker Stand 47 Stage Monitor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 48 Out Box Speaker(Low & Top).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 49 Amplifier.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 50 Audio Mixing Console (48 channels) with Effect Processor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 51 Microphones (with stands) & Gooseneck Microphone 52 Cordless microphones 53 DVD player 54 Voltage Stabilizer (10 kw) 55 Clearcom 56 Power board for Stage.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 57 Technician 58 Installation/Operation 59 Goal Post (3side C Shape) Truss as per Stage measurement 60 T-Truss 61 Installation of Stage Lighting (for 8 days): 62 S&F Thousand watt halogen Lamp (1000watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 63 S&F Metal hailed lamp fitting (400watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 64 Par 65.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 65 LED Par.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 66 Light engineer 67 Surphee.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 68 Moving Head.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 69 Haze.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 70 Installation Of Venue Lighting (for 8 days): 71 Metal 400 watt.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 72 Led rice lamp.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigidPVC conduit and proper earthling. 73 Electricity charges (on actual basis) 74 125KVA Genset for Power (for 8 days): 75 S&F Generator, 125 KVA, sound proof, for electricity supply and power backup (Fuel cost will be provided separately on the basis of actual consumption including one skilled manpower charge as per Labour Departments Order) 76 S&F Generator, 62.5 KVA, sound proof, for electricity supply and power backup (Fuel cost will be provided separately on the basis of actual consumption including one skilled manpower charge as per Labour Departments Order) 77 DOCUMENTATION: (for 8 days) 78 Still Photography 79 Video Photography 80 Govt. taxes 81 Including all Govt. taxes

Key Value

Document Fees
Refer document
EMD
INR 45000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Engagement of Event Management Agency for the work related to stage, logistic, stage run, Venue Branding and Lighting, Hospitality, manpower, ushers etc. for Bangla Sangeet Mela-2023 at Sangeet Academy Mukta Mancha
Sl. No. Item Description
1STAGE (for 8 days)
2Stage :Mattress on floor, four side truss, tarpaulin & Cloth roofing with stage decoration
3Carpeting, Musking& Framing as qeruired
4Floral decoration with coloured flower in front of stage
5BACK DROP (for 8 days)
63D back drop (20’X10’)
7Green Room (for 8 days):
820’X30’ attached with stage to be covered with tarpaulin & Octanum with curtain with mattress on floor and all other necessary equipments
9Mirrors for green room
10FURNITURE (for 8 days):
11Tables (5’X3’) with cover for green room
12VIP chairs
13Low table with covers
14Fiber Chair with cover
15Wooden Chowki with White cover for stages
16Sofa set for green room cum Office & for VVIP
17BIO TOILET (for 8 days):
18BIO TOILET (for 8 days):
19VENUE BRANDING: Gates, Publicity etc. at Madhusudan Prangan premises with creativebranding ideas andcreative awareness (for 8 days):
20STANDY8X4 IRON
21HOARDING 8’X6’ WOODEN
223-D customizedGate with decoration:Decoration of the gates will be made by flex painting (design CD will be supplied by I&CA Deptt
23Walkway Pillar : Flex with iron frame (3’ X 8’) for inside the venue
24Pole Pillar : Flex on wooden frame (3’ X 6’) for inside the venue
25Help Desk : Table with frills (10’ x 10’  )
26Programme schedule : Flex on wooden frame(10’ x 20’  )
27Name Tags- Help desk : Acrylic with prints(6"x2.5")
28Directional Signages : VOS (2"x1.5)
29Walkway Pillar : Flex with iron frame (3’ X 8’) for outside the venue
30Pole Pillar : Flex on wooden frame (3’ X 6’) for outside the venue
318"X8" flex in wooden frame
32CUTOUT (6"x12")
33SURROUNDING BRANDING (for 8 days)
3416X4X30 (3d customized overhead gate)
35HOARDING 8’X6’ WOODEN
36COLOURFULL FLAGS ON ROPE
37COLOURFULL FLAGS ON POLE
38F&B :
39Arrangement of 200 food packets per day for Artists, Officials & Others for 8 days per packets @ INR 160
40Arrangement of 200 tea / coffee per day for Artists, Officials & Others for 8 days @INR 12 per cup
41Manpower (for 8 days)
42Supervisor
43Boys
44Security (8hrs-3shifts)
45SOUND (for 8 days):
46Speaker Stand
47Stage Monitor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
48Out Box Speaker(Low & Top).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
49Amplifier.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
50Audio Mixing Console (48 channels) with Effect Processor.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
51Microphones (with stands) & Gooseneck Microphone
52Cordless microphones
53DVD player
54Voltage Stabilizer (10 kw)
55Clearcom
56Power board for Stage.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
57Technician
58Installation/Operation
59Goal Post (3side "C" Shape) Truss as per Stage measurement
60T-Truss
61Installation of Stage Lighting (for 8 days):
62S&F Thousand watt halogen Lamp (1000watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
63S&F Metal hailed lamp fitting (400watt).Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
64Par 65.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
65LED Par.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
66Light engineer
67Surphee.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
68Moving Head.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
69Haze.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
70Installation Of Venue Lighting (for 8 days):
71Metal 400 watt.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
72Led rice lamp.Proper wiring for entire connection and should be in FRLS (ISI marks) in rigid PVC conduit and proper earthling.
73Electricity charges (on actual basis)
74125KVA Genset for Power (for 8 days):
75S&F Generator, 125 KVA, sound proof, for electricity supply and power backup (Fuel cost will be provided separately on the basis of actual consumption including one skilled manpower charge as per Labour Department"s Order)
76S&F Generator, 62.5 KVA, sound proof, for electricity supply and power backup (Fuel cost will be provided separately on the basis of actual consumption including one skilled manpower charge as per Labour Department"s Order)
77DOCUMENTATION: (for 8 days)
78Still Photography
79Video Photography
80Govt. taxes
81Including all Govt. taxes
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail