}

Tender For Consultancy Services As Authority’S Engineer For Supervision Of Development Of Inland Water Transport (Iwt) Terminal At Mmlp Jogighopa, Assam, Bongaigaon-Assam

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Tender For Consultancy Services As Authority’S Engineer For Supervision Of Development Of Inland Water Transport (Iwt) Terminal At Mmlp Jogighopa, Assam. Submission Date for this Tender is 13-12-2023. Binding and Lamination Machine Tenders in Bongaigaon Assam. Bidders can get complete Tender details and download the document.




Tender Notice

40836064
Corrigendum : Tender For Consultancy Services As Authority’S Engineer For Supervision Of Development Of Inland Water Transport (Iwt) Terminal At Mmlp Jogighopa, Assam
Open Tender
Indian
Assam
Bongaigaon
13-12-2023

Tender Details

Consultancy Services As Authority’S Engineer For Supervision Of Development Of Inland Water Transport ( Iwt ) Terminal At Mmlp Jogighopa, Assam; 1 Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) 2 Team Leader Cum Senior Structural Engineer 1No. *10 + 1No. *60=70 3 Senior Geotechnical Engineer 1No. *8=8 4 Senior Hydrological Engineer 1No. *10=10 5 Sub-Professional Staff 6 Quality Cum Material Engineer 1Nos. *10 + 1No. *60 = 70 7 Quantity Surveyor1no. *10=10 8 Lab Technician1no. *10 + 1No. *60 = 70 9 Support Staff ( Inclusive Of Per Diem Allowance ) 10 Office Manager Cum Accountant ( 1Nos.*10+ 1No.*60 ) =70 11 Steno Cum Computer Operator ( 2Nos.*10+ 1No.*60 ) =80 12 Office Boy ( 2Nos.*10+ 1No.*60 ) =80 13 Transportation ( Fixed Costs ) 14 Innova / Scorpio Or Equivalent ( Not More Than 3 Years Old ) ( 1 No During Construction Period + 1 No During Maintenance Period / Dlp ) , ( 1*10 + 1*60 ) =70Rate Per Month 15 Duty Travel To Site ( Fixed Costs ) : Professional And Sub-Professional Staff. The Employer May Require The Key Personnel To Visit The EmployerS Site Offices / Regional Office. The Quoted Amount Against Remuneration Should Include Travel Fare ( Including Hotel Charges, Travel Costs Etc. Complete 16 For 12 Round Trip To EmployerS Head Office 17 For 12 Round Trip To EmployerS Regional Office. 18 Office Rent ( Fixed Costs ) The Rent Cost Includes Electricity And Water Charges, Maintenance, Cleaning, Repairs, Etc. ( Rate Per Month ) 19 Main Office Of Min. Area 200 Sqm ( 1 No During Construction Period + 1 No During Maintenance Period / Dlp ) , ( 1*10 + 1*60 ) =70 20 Office Supplies, Utilities And Communication ( Fixed Costs ) , Rate Per Month 21 Office Supplies During Construction Period And Maintenance Period1*10 + 1*60 = 70 22 Drafting Supplies During Construction Period And Maintenance Period1*10 + 1*60 = 70 23 Computer Running Costs During Construction Period And Maintenance Period1*10 + 1*60 = 70 24 Domestic And International Communication During Construction Period And Maintenance Period1*10 + 1*60 = 70 25 Office Furniture And Equipment ( Rental ) Office Furniture Shall Include Executive Tables, Chairs, Visitor Chairs, Steel Almirahs, Computer Furniture, Conference Table Etc. Office Equipment Shall Include As A Minimum Of Telephone ( 2 External & 10 Internal Lines ) , Photocopier ( 15Ppm, 12000 Copies Per Month With A3 & A4 Input ) Fax Machine, Pcs ( 15 No., Intel Core I5, 19’’ Colour Tft, Cache-6Mb, Ram-4 Gb, Hdd-250 Gb, Dvd Writer, Key Board, Optical Scroll Mouse, Ms- Windows 11, Pre-Loaded Anti-Virus Etc. ) , Laser Printers ( 5 Nos., 14 Ppm, 266 Mhz, 5000 Pages Per Month, 600X600 Dpi Or Better Etc., Engineering Plan Printer ( 1 No. ) , Binding Machine ( 1 No. ) , Plotter A0 Size, Overhead Projector, Ac ( 5 Nos., 1.5 Ton ) , Water Coolers ( As Required ) Etc., 26 During Construction Period For 1 No Of Office1*10=10 27 During Maintenance / Dlp Periodfor 1 No Of Office1*60=60 28 Reports And Document Printing ( Rate As Per Copy ) 29 Monthly Reports ( Design And Construction ) 30 Half Yearly Reports 31 Various Others Reports As Provided In The Concession Agreement Such As Completion Report 32 Cost Towards Equipments Required To Carry Out The Consultancy Assignmentt 33 All Necessary Equipments, Vehicles And Materials Required To Carry Out The Consultancy Assignment Shall Be Consultant’S Responsibility And Cost Of Such Equipment’S, Vehicles And Materials Shall Be Included In The Quote Submitted By The Consultant. No Additional Payments Shall Be Made To The Consultant. 34 Contigenciesa Fixed Amount Of Indian Rupees One Million Shall Be Included In The Financial Proposal. ( Fixed As Rs. 10, 00, 000 )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 08-Dec-2023 Corrigendum no 1 Other 13-12-2023

Key Value

Document Fees
INR 5900 /-
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam
Sl. No. Item Description
1Remuneration for Local Staff (inclusive of per Diem allowance)
2Team Leader Cum Senior Structural Engineer 1no. *10 + 1no. *60=70
3Senior Geotechnical Engineer 1no. *8=8
4Senior Hydrological Engineer 1no. *10=10
5Sub-Professional Staff
6Quality cum Material Engineer 1nos. *10 + 1no. *60 = 70
7Quantity Surveyor 1no. *10=10
8Lab Technician 1no. *10 + 1no. *60 = 70
9Support Staff (inclusive of per diem allowance)
10Office Manager cum Accountant (1nos.*10+ 1no.*60)=70
11Steno cum Computer Operator (2nos.*10+ 1no.*60)=80
12Office Boy (2nos.*10+ 1no.*60)=80
13Transportation (Fixed Costs)
14Innova/scorpio or equivalent (not more than 3 years old) (1 no during Construction Period + 1 no during Maintenance period/DLP), (1*10 + 1*60)=70 Rate per month
15Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer"s Site Offices/Regional Office. The quoted amount against remuneration should include travel fare(including Hotel Charges,travel costs etc. complete
16For 12 round trip to Employer"s Head Office
17For 12 round trip to Employer"s regional office.
18Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
19Main Office of min. area 200 sqm (1 no during Construction Period + 1 no during Maintenance period/DLP), (1*10 + 1*60)=70
20Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
21Office Supplies during construction period and maintenance period 1*10 + 1*60 = 70
22Drafting Supplies during construction period and maintenance period 1*10 + 1*60 = 70
23Computer Running Costs during construction period and maintenance period 1*10 + 1*60 = 70
24Domestic and International Communication during construction period and maintenance period 1*10 + 1*60 = 70
25Office Furniture and Equipment (Rental) Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(15 No., Intel Core i5, 19’’ colour TFT, Cache-6MB, RAM-4 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 11, pre-loaded anti-virus etc.), laser printers (5 nos., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (5 nos., 1.5 Ton), Water Coolers (as required)etc.,
26During Construction period for 1 no of office 1*10=10
27During Maintenance /DLP periodfor 1 no of office 1*60=60
28Reports and Document Printing ( rate as per copy)
29Monthly reports (Design and Construction)
30Half yearly Reports
31Various others reports as provided in the Concession Agreement such as Completion Report
32Cost towards Equipments required to carry out the consultancy assignmentt
33All necessary equipments, vehicles and materials required to carry out the consultancy assignment shall be consultant’s responsibility and cost of such equipment’s, vehicles and materials shall be included in the quote submitted by the consultant. No additional payments shall be made to the consultant.
34Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail