Military Engineer Services-MES has published Tender For Repair Maint Of Ups, Fire Alarm,Fire Fighting System,Laundry Plants,Servo Stabilizer, Isolation Transformer, Air Curtains, Electrial Manual Gantries Cranes At Air Force Station Gorakhpur. Submission Date for this Tender is 26-12-2023. Air Fittings and Connectors Tenders in gorakhpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 19-Dec-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 26-12-2023 |
Sl. No. | Item Description |
1 | Repair/Maintenance of laundry plant and overhauling complete all as specified and directed by Eng-In -Charge. Note:- All spare parts to be paid separately during repair work.. |
2 | Supply only heating strip industrial type 3 KW |
3 | Supply only Butterfly valve 2" |
4 | Supply only Butterfly valve 5" |
5 | Supply only contactor |
6 | Supply only Indicating lamp(R,Y,B) |
7 | Supply only Push button |
8 | Supply only Belt(B-72) |
9 | Supply only Timer |
10 | Supply only MCB 63A |
11 | Supply only Rewinding of Motor 2 HP 3 phase |
12 | Annual maintenanceof Fire Alarm System complete all as specified and directed with all minor repair/servicing carried out with replacement of following components:- (i) Fire Alarm detector - 25 Nos (ii) Fire alarm Hooter / Sprinkler - 30 Nos (iii) Fire Alarm indicator light - 25 Nos (iv) Fire Alarm activation panel - 6 Nos (v) Main control panel - 2 Nos(vi) Addressible Panel-2 Nos. Location of Fire Alarm System :DWR , SRE, GCA, Derin III Station armoury, 274 SU, 12 AFH CT Scan, Jaguaar Simulator, NGCCM and MPU buildings |
13 | Repair,maintenance and overhaulingof Isolation transformer of cap 25 KVA three phase 415 volts 50 Hz ONAN type cooled oil immersed copper wound indoor type complete changing of gasket,top up T/Roll as required at site,repackaging same,testing,tightening of loose connector of stud,gasket etc,painting of T/R as existing colour,marking MES Nos complete all as specified and directed by Engr-in-charge. |
14 | Repair,maintenance and overhaulingof Isolation transformer of cap 50 KVA three phase 415 volts 50 Hz ONAN type cooled oil immersed copper wound indoor type complete with first filling of IS; 335 ISI marked filtered & Dehydratad Transformer oil electrostatic shield between primary 415 V in Delta connected & secondray 415V Star connected complete & other standard fitting / accessories with vector group symbol Dyn-11 , cable box on in comming and out going with cable gland complete all as specified and directed by Engr-in-charge. |
15 | Supply & erection in replacement of Internal Hydrant Valve stainless steel coupling 63mm dia with cost iron wheel complete all as specified and directed by Engr-in-charge. |
16 | Supply & erection in replacement of 63 MM DIA 15 MTR Long RRL hose pipe with 63 mm dia male / female coupling complete all as specified and directed by Engr-in-charge. |
17 | Supply & erection in replacement of Hose Box (600*300*200) size made 16/18 SWG thick having 04mm thickness glass double door complete all as specified and directed by Engr-in-charge. |
18 | Supply & erection in replacement of NRV 100mm Dia complete all as specified and directed by Engr-in-charge. |
19 | Supply & Erection in replacement of Air release valve complete all as specified and directed by Engr-in-charge. |
20 | Supply & Erection in replacement of Butterfly valve 100mm dia complete all as specified and directed by Engr-in-charge. |
21 | Pump room(all pump) maintenance and all hydrant line testing & Commissioning complete all as specified and directed by Engr-in-charge. |
22 | Supply & fixing of Diesel engine Battery 150 AH, 12/24 volt complete all as specified and directed by Engr-in-charge. |
23 | M&L for spray Paint of All Hydrant & Pump,pipeline as per IS code complete all as specified and directed by Engr-in-charge. |
24 | Taking out and disconnecting of UPS (digital/analog type), 3 phase, 415 volts, AC, 50 Hz, 3 to 20 KVA and detecting the internal faults of following parts/assembly etc of any make and type and repair / replace the same defective parts of same type / capacity as per OEM design/authorized including testing on load as reqd complete all as specified and as directed :- (Note :- Spare parts/assembly will be measured and paid seperately) (a) Intelligent slot (b) SNMP card (c) Transformer (d) Auxillary circuit (e) Communication port/EPO port (f)Support time (g) Suitable operating software package (h) LCD/LED display information (j)Buzzer alarm status (k) Bypass switch (l)Identification menu |
25 | Supply only Intelligent slot of UPS 3 to 20 KVA 3 phase as required at site. |
26 | Supply only SNMP card of UPS 3 to 20 KVA 3 phase as reqd at site. |
27 | Supply only Transformer of UPS 3 to 20 KVA 3 phase as required at site. |
28 | Supply only Auxillary circuit of UPS 3 to 20 KVA 3 phase as required at site. |
29 | Supply only Communication port / EPO port of UPS 3 to 20 KVA 3 phase as reqd at site. |
30 | Support time of UPS 3 to 20 KVA 3 phase as required at site. |
31 | Supply only Suitable operating software package of UPS 3 to 20 KVA 3 phase as reqd at site. |
32 | Supply only LCD/LED display system of UPS 3 to 20 KVA 3 phase as required at site. |
33 | Supply only Buzzer alarm system of UPS 3 to 20 KVA 3 phase as required at site. |
34 | Supply only Bypass switch of UPS 3 to 20 KVA 3 phase as required at site. |
35 | M&L for taking out and disconnecting of UPS (digital/analog type), 3 phase, 415 volts, AC, 50 Hz, 200 KVA and detecting the internal faults of following parts/assembly etc of any make and type and repair / replace the same defective parts of same type / capacity as per OEM design/authorized including testing on load as reqd complete all as specified and as directed :- (Note :- spare parts/assembly will be measured and paid seperately) (a) Intelligent slot (b) SNMP card (c) Transformer (d) Auxillary circuit (e) Communication port/EPO port (f)Support time (g) Suitable operating software package (h) LCD/LED display information (j)Buzzer alarm status (k) Bypass switch (l)Identification menu |
36 | Supply only Intelligent slot of UPS 200 KVA 3 phase as required at site. |
37 | Supply only SNMP card of UPS 200 KVA 3 phase as reqd at site. |
38 | Supply only Transformer of UPS 200 KVA 3 phase as required at site. |
39 | Supply only Auxillary circuit of UPS 200 KVA 3 phase as required at site. |
40 | Supply only Communication port / EPO port of UPS 200 KVA 3 phase as reqd at site. |
41 | Support time of UPS 200 KVA 3 phase as required at site. |
42 | Supply only Suitable operating software package of UPS 200 KVA 3 phase as reqd at site. |
43 | Supply only LCD/LED display system of UPS 200 KVA 3 phase as required at site. |
44 | Supply only Buzzer alarm system of UPS 200 KVA 3 phase as required at site. |
45 | Supply only Bypass switch of UPS 200 KVA 3 phase as required at site. |
46 | Supply only Electrolytic surge capacitor 3300 Mfd, 500 Volt DC for UPS 20 KVA 3 phase as required at site |
47 | Disconnecting / taking out old unserviceable batteries of capacity 12 volts, upto 50 AH from existing UPS (digital/analog type) of capacity 3 phase, 415 volts 3 to 200 KVAand Supply / install / connecting of maintenance free, dry cell battery of capacity 12 volts up to 50 AH as reqd at site all as directed. |
48 | Disconnecting / taking out old unserviceable batteries of capacity 12 volts, upto 50 AH from existing UPS (digital/analog type) of capacity 3 phase, 415 volts 3 to 200 KVAand Supply / install / connecting of maintenance free, dry cell battery of capacity 12 volts up to 100 AH as reqd at site all as directed. |
49 | Disconnecting / taking out old unserviceable batteries of capacity 12 volts, upto 50 AH from existing UPS (digital/analog type) of capacity 3 phase, 415 volts 3 to 200 KVAand Supply / install / connecting of maintenance free, dry cell battery of capacity 12 volts up to 150 AH as reqd at site all as directed. |
50 | Disconnection of all electrical connection and opening of Automatic Servo voltage stabilizer , Three phase, balanced load 300-480 volts and derive volts 400-440 volts, + 1.5 Volts, air/oil cooled of capacity upto 40 KVA/75 KVA of any make/design, opening and cleaning of transformer and repairing the faults, re-assembling after replacement of unserviceable/defective, worn out parts with new parts of same make/type/capacityreassembling, commissioning and testing in satisfactory manner and testing on load complete (Note :- Spare parts/assembly will be measured and paid seperately) |
51 | Disconnection of all electrical connection and opening of Automatic Servo voltage stabilizer, Three phase, balanced load 300-480 volts and derive volts 400-440 volts, + 1.5 Volts, air/oil cooled of capacity 150 KVA / 200 KVA of any make/design, opening and cleaning of transformer and repairing the faults, re-assembling after replacement of unserviceable/defective, worn out parts with new parts of same make/type/capacityreassembling, commissioning and testing in satisfactory manner and testing on load complete (Note :- Spare parts/assembly will be measured and paid seperately) |
52 | Supply only Control relay suitable for upto 40 KVA voltage stablizer |
53 | Supply only Control relay suitable for 75 KVA voltage stablizer |
54 | Supply only Control relay suitable for 150 to 200 KVA voltage stablizer/Isolation Transformer. |
55 | Supply only Voltmeter 0-500 volts suitable for 75 to 200 KVA voltage stabilizer / Isolation Transformer. |
56 | Supply only Automatic printed circuit board (electronic control circuit) suitable forupto 40 KVA servo voltage stabilizer |
57 | Supply only Automatic printed circuit board (electronic control circuit) suitable for75 KVA servo voltage stabilizer |
58 | Supply only Automatic printed circuit board (electronic control circuit) suitable for 150 & 200 KVA servo voltage stabilizer / Isolation Transformer. |
59 | Supply only Time relay circuit upto 200 KVA with all accessories |
60 | Supply only Transformer main copper wound upto 5 Kg suitable for 5 to 20 KVA, 3 phase voltage stabilizer with copper winding. |
61 | Supply only Transformer main copper wound upto 15 Kg suitable for 40 & 75 KVA, 3 phase voltage stabilizer with copper winding. |
62 | Supply only Dimmer Circuit of Servo voltage stabilizer of capacity 10 to 75 KVA, suitable for Stabilizers / Isolation Transformers all directed. |
63 | Supply only Dimmer Circuit of Servo voltage stabilizer of capacity 150 & 200 KVA, suitable for Stabilizers/Isolation Transformers all directed. |
64 | M&L for repair of Servo Motor (synchronous) of Servo type voltage stabilizer, three phase 415 volt, AC of capacity 40/75 KVA. |
65 | M&L for toping up of new transformer oil conforming to IS grade with suitable di-electric strength for isolation transformer/servo voltage stabilizer of capacity upto 200 KVA complete all as specified and as directed. Make : Gulf Castrol / HP / IOC / BP/ Servo / Power Oil. |
66 | Material and labour for servicing and cleaning of Hand Operated (Mechanical) crane of capacity upto 5 TON complete cleaning and scrapping of silted old grease and dust of both side of running channel and cross channel regreasing and oiling properly with super synthetic grease and oil on about 5 mtr height complete all as specified and directed. |
67 | Material an labour for load testing of Hand Operated Crane of capacity 2/3/5 TON with artificial load including cost of arrangement of artificial load properly complete all as specified and directed. |
68 | Material and labour for oiling and greasing of the main chain pulley block rolling wheels and steel rope complete all as specified and directed. |
69 | M&L for taking down existing chain pulley of capacity upto 3 TON with 3 mtr long chain complete from existing channel of height not exceeding 4.5 mtr transporting to workshop for complete repair/welding etc and after servicing refixing at the same location and testing complete all as required at site and as directed. |
70 | Material and labour for servicing and cleaning of Electrical Operated crane of capacity upto 2 TON complete cleaning and scrapping of silted old grease and dust of both side of running channel and cross channel regreasing and oiling properly with super synthetic grease and oil on about 5 mtr height complete all as specified and directed. |
71 | Material an labour for load testing of Electrical Operated crane of capacity upto 2 TON with artificial load including cost of arrangement of artificial load properly complete all as specified and directed. |
72 | M&L for repairing of controller operating remote with required spares (Hanging type) complete all as specified and directed. |
73 | M&L for removing unserviceable control cable and supply and fixing new 6 core copper cable complete all as directed. |
74 | M&L for removing unserviceable load stay wire steel rope (approx 20mm size) and supply and fixing new steel wire rope with lock complete all as directed. |
75 | M&L for oiling and greasing of the main gear box rolling wheels and steel rope complete all as specified and directed. |
76 | M&L for repairing of break liner,replacement of failed bearing, checking and repairing/servicing of working of chain links, grooves of chain link, repair /servicing of Engine axel etc for hand operated crane of capacity 5 Ton complete all as specified and directed. |
77 | M&L for repairing of break liner,replacement of failed bearing, checking and repairing/servicing of working of chain links, grooves of chain link, repair /servicing of Engine axel etc for hand operated crane of capacity 3 Ton complete all as specified and directed. |
78 | M&L for repairing of break liner,replacement of failed bearing, checking and repairing/servicing of working of chain links, grooves of chain link, repair /servicing of Engine axel etc for hand operated crane of capacity 2 Ton complete all as specified and directed. |
79 | M&L for repairing of break liner,gear box,rewinding of motor,replacement of failed bearing, checking and repairing/servicing of working of chain links, grooves of chain link, repair /service etc for EOT crane of capacity 2 Ton complete all as specified and directed. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail