Clean Agent Systems Clean Agent Systems For Numaligarh Refinery Expansion Project , The Scope Of This Supply Requisition Shall Include (As Per Mr Tp-1Zzza-Sa-Rfq-0006_D2), But Not Limited To Design, Engineering, Manufacturing,Performance Guarantee, Fabrication, Painting And Coating, Supply Of Materials, Shop Testing, Inspection & Testing, Packing For Delivery, Documentation, Operating And Maintenance Manuals, Transportation, Supply,Installation, Erection And Commissioning Assembly Of Fk-5-1-12 And Ig 541 Fire Suppression System Including Start-Up / Commissioning Spare Parts , Special Tools Required For Installation, Operation, And Maintenance For Cr-2, Lcr, Mrss-Cr (Ss#21), Srr-9 & Srr-10 Buildings (Fk-5-1-12) & Cr-3 Building (Ig 541). A) Clean Agent System Stored Cylinder In Accordance With Section Viii Of Asme Boiler Pressure Vessel Code,100% Standby Cylinders, Cylinders Racks. This Includes Design, Engineering, Manufacturing, Performance Guarantee, Fabrication, Painting And Coating, Supply Of Materials, Shop Testing, Inspection & Testing, Packing For Delivery, Documentation, Operating And Maintenance Manuals, Transportation, Supply, Installation, Erection And Commissioning Assembly. B) Sets Of Cables Ladders And Trays, Power And Control Cables Within Each Skid, Cable Entries,Cable Glands, Junction Boxes, Bulk, And Accessories, Earthing And Bonding, Painting,Coating, Galvanizing, Insulation Materials And Erection Accessories. C) Discharge Nozzles, Discharge Mechanism And Distribution Network, Check Valve, Actuators,Pressure Switches/Gauge, Flexibles, Pipes,Manifold Bracket Supports, Hangers And Such Other Fittings As Necessary For Complete Installation Of The System Etc. D) Sets Of Selector Valve Assembly, Check Valves,Electric Actuator, Manifold Piping, Discharge Valves; Valves Actuators (Electric, Manual And Pneumatic), Actuation Check Valve, Actuation Hose, Discharge Pressure Switch, Pneumatic Siren, Discharge Nozzles Are Part Of Clean Agent Package. E) Push Button (Included Manual Release Push Button) At Emergency Exit Or Any Door Other Than The Main Entrances To Protected Rooms. F) Puff Test & Leak Test As Per Nfpa 2001 Latest Edition. G) Wall Mounted Central Control Panel Adjacent To Cylinders Bank / Outside The Protected Room H) Manual Abort Switch (At Each Protected Room) I) Pre-Discharge And Discharge Audible And Visual Alarms (At Each Protected Room) J) Warning And Instruction Signs (At Each Protected Room)