Department Of Housing And Urban Development has published Tender For Annual Maintenance Rate Contract For Repairs /Replacement Of Damaged Spare Parts Including Scheduled Servicing (As And When Required) Of Various Departmental Vehicles) Of Ashok Leyland Make. Submission Date for this Tender is 30-11-2023. Prime Mover Tenders in Srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Departmental weed Dumpers |
2 | Schedule Servicing:- The job shall include providing and filling of POL"s and spares as and when required |
3 | Providing and Filling Engine oil grade 20 w 40 |
4 | Providing and Fitting Oil filter |
5 | Providing and Fitting Fuel filter (water separator) |
6 | Providing and Fitting Air cleaner element. Primary |
7 | Providing and Fitting Air cleaner element. Secondary |
8 | Providing and Fitting Water body Assembly |
9 | Providing and Fitting Gear oil Change 80 W 90 |
10 | Providing and Filling Hydraulic oil 68 Grade |
11 | Providing and Filling steering oil |
12 | Providing and Fitting steering oil filter |
13 | Repair/ replacement of turbo repair kit |
14 | Wheel balancing and alignment |
15 | Four wheel checking including lubes and necessary seals |
16 | Self starter servicing in all respects including servicing |
17 | Battery recharging including carriage |
18 | Gravity checking and topping up of battery water |
19 | Tyre Puncture including carriage |
20 | Providing, fabrication and fitting of protection guard to the Weed dumper Ashok Leyland 1920 shall be made of ISMC 100 at front and rear side shall be fitted with necessary nuts and bolts / welding with existing chassis. The job also includes carriage, welding ,cutting and painting as per requirement |
21 | Diesel exaust fulid |
22 | Departmental weed Tippers |
23 | Schedule Servicing:- The job shall include providing and filling of POL"s and spares as and when required |
24 | Providing and Filling Engine oil grade 20 w 40 |
25 | Providing and Fitting Oil filter |
26 | Providing and Fitting Fuel filter (water separator) |
27 | Providing and Fitting Air cleaner element. Primary |
28 | Providing and Fitting Air cleaner element. Secondary |
29 | Providing and Fitting Water body Assembly |
30 | Providing and Fitting Gear oil Change 80 W 90 |
31 | Providing and Filling Hydraulic oil 68 Grade |
32 | Providing and Filling steering oil |
33 | Providing and Fitting steering oil filter |
34 | Repair/ replacement of turbo repair kit |
35 | Brake booster kitProviding and Fitting:The job shall include dismantling of the brake boosters form the Truck and taking the same to the workplace of the contractor. Thereafter, the job shall include further dismantling the brake boosters ascertaining of the faults. Further the chambers of the booster be taken over the machineandthe chambers be finished to the required size .Further therequisite new brake booster kitsbe fitted if required. Assembling back the chambers to the booster assembly and bring the same to the workshop for further fitment to the machine to check for the proper functioning ( Front Wheel) |
36 | Brake booster kitProviding and Fitting:The job shall include dismantling of the brake boosters form the Truck and taking the same to the workplace of the contractor. Thereafter, the job shall include further dismantling the brake boosters ascertaining of the faults. Further the chambers of the booster be taken over the machineandthe chambers be finished to the required size .Further therequisite new brake booster kitsbe fitted if required. Assembling back the chambers to the booster assembly and bring the same to the workshop for further fitment to the machine to check for the proper functioning (Rear Wheel) |
37 | Propeller Shaft:- Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
38 | Machining job of the Propeller shaft along withproviding and fitting of Universal Joint and clampsThe jobincludes dismantling of propeller shaft from the Vehicle at site and the propeller shaft be taken to the contractor’s workplace for further execution of job over the Lathe machine. During machining, torsions needs to be checked thoroughly and rectified. Both the ends of the propeller shaft may need cutting. A new half yoke be fitted by way of welding along with a new universal joint and cross holder .The alignment of the assembly be finished and checked over the lathe machine once again. The spares once fitted and assembled need to be checked over Lathe machine to ensure the zero error before proceeding further .After the job is complete the same needs to be carried back to the site for further fitment to the machine,. The tipper needs to be tested thoroughly after fitment for ascertaining the quality of the job. |
39 | U-J Cross |
40 | Cross Holder |
41 | Coupling |
42 | HalfYoke |
43 | Central Bearing with rubber Assembly Complete |
44 | Shaft Bolts with Nuts and Washer. |
45 | Main brake booster pipe |
46 | Clutch Plate |
47 | Pressure plate |
48 | Clutch Release Bearing. With Hub |
49 | Fly Wheel Ring |
50 | Fly Wheels Bolts |
51 | Turbo charger repair |
52 | Suspension System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
53 | Augmentation of Leaf Springs(Rear):The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. |
54 | Re-Arching of the existing for rearsuspension :The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. |
55 | Augmentation of Leaf Springs (Front):The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. |
56 | Re-Arching of the existing for rearsuspension :The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. |
57 | Providing and fitting of leaf springs and allied spares as per requirement |
58 | Auxillary Rear Leaf |
59 | Leaf Spring Clamps 8" |
60 | Leaf Spring Clamps 5" |
61 | Leaf Spring rivets |
62 | Leaf Spring Bush |
63 | Centre Bolt |
64 | Gear Box Bolt |
65 | Tappet Cover Gasket |
66 | Leaf Spring Bolt |
67 | Leaf Spring Cotter |
68 | U-Bolt 18"" |
69 | Wheel System :-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
70 | Front Wheel oil seal |
71 | Tie Rod Ball Set |
72 | F/WBearings. Inner |
73 | F/W Bearings. Outer |
74 | Front brake lining sets |
75 | Rear brake lining sets |
76 | Slack Adjuster Automatic |
77 | Real wheel oil seal |
78 | R/w Bearings. Inner |
79 | R/w Bearings. Outer |
80 | Wheel Cam bush |
81 | Wheel Cam oil Seal |
82 | FuelInjection Pump:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
83 | Complete overhauling of the Fuel Injection Pump .The job shall comprise taking of the dismantled fuel pump assembly alongwith nozzlesfrom the workshop and examining the same for further job to be executed. It shall further checked for the damaged/worn outspares forreplacements, comprising,Element Set(01 Set of 04 Nos),Delivery Valve(01 Set of 04 Nos),Complete Nozzle set replacement(06 Nos),Taper Roller bearing(01 Set),Nozzle Cups(06 Nos),Cross Disc(01 No),T quadrant(02 Nos) and Camplate(01 No).Upon replacement of the mentioned spares the Fuel Pump shall be assembled and tested for the proper atomisation in order to have the correct fuel to thefuel injector in correct timing andthe accurate metered amount of fuel with sufficient pressure from the nozzles over the Diesel Pump testingmachine.Once the job gets completed,the Fuel Pump shall be brought back to workshop for further fitment to the Truck.The job shall get executed by a highly skilled proffesional only. |
84 | Nozzle |
85 | FuelInjection Pump:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
86 | Steering System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
87 | Steering. Cross |
88 | Self starter :-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
89 | Armature Assembly |
90 | Self Carbon bush set |
91 | Self bearing |
92 | Bendex Drive |
93 | SolenoidSwitch |
94 | Field Coil Set |
95 | Battery Lead 8 AWG gaugemultistrendwith copper Thimbles and terminals etc. Both negative and positive |
96 | Re-building ofbattery poles. |
97 | Ignition switch |
98 | Battery 88Ah |
99 | Alternator Assembly:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
100 | Rectifier plate |
101 | Carbon Bush Set |
102 | Cut out |
103 | Armature Assembly |
104 | Armature Bearing |
105 | Silencer:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
106 | Joint & Bolts |
107 | Silencer Gas Welding and Patching |
108 | Radiator Assembly;-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
109 | Radiator Cup |
110 | Hose pipe Sets upper & lower with Clamps |
111 | Radiator Leakage Arrest by way of soldering, carbon leakage testing, cleaning of radiator cooling fins & servicing. Besides the job shall include dismounting & remounting of radiator by way of engaging of skilled machanic on the job. |
112 | Electrical Works:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
113 | New T-Horn Assembly |
114 | Head Light Assy. |
115 | Head Light bulb |
116 | Tail light bulb |
117 | Indicator bulb |
118 | Tail light Assy |
119 | Cab. Light |
120 | Side Indicator Assy. |
121 | Combination Switch. |
122 | Ignition switch |
123 | Brake System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
124 | Brake Front & Rear Cylinder Assy. |
125 | Master Cylinder |
126 | Front & Rear Brake Cam |
127 | Air Pressure Pipes |
128 | Brake pipe |
129 | Diaphagram Washer of Brakes |
130 | Window Glasses and Front wind shield:-Scope of work shall include Providing and fitting of damagedwind screen along with beading with new oneas per details below (triplex laminated) |
131 | Front Glass/Wind Shield Triplex laminated with rubber beeding and other allied fittings |
132 | window Glass Right |
133 | Window Glass Left |
134 | Fan Belt set |
135 | Departmental Vehicle bearing No. JK01AQ-3185 |
136 | Providing & filling of M-Oil grade 20w40 |
137 | Providing & fitting of oil filters |
138 | Providing & fitting of Fuel filter (Water Seperator) |
139 | Providing & fitting of Air Cleaner Element Primary |
140 | Providing & fitting of Air Cleaner Element Secondary |
141 | Providing & fitting of coolant /antifreeze(03 ltrs each service) |
142 | Providing & filling of Gear oil grade 80w90 |
143 | Providing and filling steering oil |
144 | Providing and filling steering oil filter |
145 | Tyre puncture including carriage |
146 | Diesel Exaust Fluid under BS VI standards |
147 | Universal cross |
148 | Central bearing with bracket |
149 | Wheel balancing and alignment |
150 | Four Wheel checking (including lubes and necessary seals) |
151 | Self starter servicing |
152 | Battery charging including cariage |
153 | Gravity checking and topping of battery water |
154 | Rebuilding of battery poles including providing and fitting of battery cable terminals (both positive and negative) |
155 | Repair/ replacement of Thermal printer of dispenser unit of fuel bowser including necessary software upgrades/calibration if required. The job is inclusive of necessary carriages/transportation |
156 | Providing and fitting of Hose pipe 2 meter Long, 25 mm dia, 250 Ps with allied fittings and adaptors with necessary crimping of pipe. The job includes carriage and handling taking the fuel dispenser unit to the workshop and checking for any leakage etc.after fixing the hose |
157 | DepartmentalSewer Cleaning Machine |
158 | Schedule servicing |
159 | M.Oilchange grade 20w4010 liters |
160 | Gear oil grade EP 9020 litres |
161 | Filter (M.oil) Bush-6D |
162 | Fuel cum water separator Filter |
163 | Fuel setraiiner |
164 | Air Filter Primary & Secondary |
165 | Complete Greasing |
166 | Propeller Shaft:- Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below |
167 | U-J Cross |
168 | Cross Holder |
169 | HalfYoke |
170 | Yoke and Teeth |
171 | Central Bearing. Assembly Complete |
172 | Shaft Bolts with Nuts and Washer. |
173 | Clutch System |
174 | Clutch Plate |
175 | Pressure plate |
176 | Clutch Release Bearing. With Hub |
177 | Fly Wheel Assembly with Ring |
178 | Wheel and Suspension System |
179 | Front Wheel oil seal |
180 | Tie Rod Ball Set |
181 | Tie Rod End Set |
182 | F/WBearings. Inner |
183 | F/W Bearings. Outer |
184 | Front and Rear brake lining sets |
185 | F/R Brake Shoe Spring |
186 | Slack Adjuster |
187 | Real wheel oil seal |
188 | R/w Bearings. Inner |
189 | R/w Bearings. Outer |
190 | Came bush |
191 | Cam oil Seal |
192 | Front leaf springMain |
193 | Front leaf Spring 2nd |
194 | Rear leaf Spring main |
195 | Rear leaf Spring 2nd |
196 | FuelInjection Pump |
197 | Complete Overhauling / calibration including replacement of folowwing items .Nozzles,Came Plate,Lever Shaft,Guide Bushing,Oil Seal,T.D Piston,V.E Pump Repair Kit,D.P Head,Acc Bush,Cross Disc,Roller |
198 | Rotary Pump Unit |
199 | Primary fuel Pump |
200 | Nozzle |
201 | Nozzle Pipes |
202 | Steering System |
203 | Power Stg. Repair kit |
204 | Hydraulic Pipes |
205 | Steering. Cross |
206 | Steering. O/H Kit |
207 | Steering. Oil |
208 | Turbo charger kit |
209 | Self |
210 | Armature Assembly |
211 | Self Carbon bush set |
212 | Self bearing |
213 | SolenoidSwitch |
214 | bendex drive |
215 | Field Coil Set |
216 | Battery terminals /Lead sets |
217 | Battery 12 volts 180 Ah |
218 | Alternator Assembly |
219 | Rectifier plate |
220 | Carbon Bush Set |
221 | Cut out |
222 | Armature Assembly |
223 | Oil Seal |
224 | Bearing |
225 | Silencer |
226 | Silencer Clamps set |
227 | Silencer Gas Welding and Patching |
228 | Silencer Main Body (Dholkhi) |
229 | Radiator Assembly |
230 | Radiator Cup |
231 | Hose pipe Sets with Clamps |
232 | Radiator Fan |
233 | Water body |
234 | Water body pully |
235 | Servicing of Radiator |
236 | Electrical Works |
237 | New Horn Assembly Double |
238 | Head Light Assy. |
239 | Head Light bulb |
240 | Tail light bulb |
241 | Indicator bulb |
242 | Tail light Assy |
243 | Roof Light |
244 | Side Indicator Assy |
245 | Ignition switch |
246 | Brake System |
247 | F/W Brake Leather Set with Rivets |
248 | Rear/W Brake Leather Set with Rivets |
249 | Front & Rear Cylinder Assy. |
250 | Master Cylinder kit |
251 | Air Pressure Pipes |
252 | Brake pipe |
253 | Window Glasses and Front wind shield |
254 | Front Glass/Wind Shield with rubber beeding |
255 | Door Glass Right |
256 | Door Glass Left |
257 | Bonding Tube |
258 | Wiper blade with arm assembly |
259 | Engine Work |
260 | Piston with Pin |
261 | Piston Ring Set |
262 | Cylinder Liner(Sleeve) |
263 | Main & Big End Bearings. |
264 | Connecting Rod Assy. |
265 | Connecting Rod Bush |
266 | Temperature Plug |
267 | Diesel Pipe set |
268 | Accelerator cable |
269 | Engine Valve |
270 | Crank oil Seal |
271 | Timing Oil Seal |
272 | Engine Gasket Kit Complete |
273 | Head Valve Seal Set |
274 | Cam Bush |
275 | Head Valve and guide set |
276 | Air Compressor Piston with ring and Gasket set complete |
277 | Labour charges for cylinder Sleeve fitting Main & Big end Bearings. Crank Polishing &grinding to Exact Size, Cam Bush Fitting and connecting rod Fitting. |
278 | Labour Charges for Cylinder Head. New Seat Fitting Grinding the head Valve guide Fitting and Head Testing |
279 | Sludge Water Tank Body and Chassis |
280 | Supply of steel maerial of asorted size, specifications viz MS Plates, ISF, ISMB, ISA as per site requiremnt (FOR) |
281 | Welding repair jobto the vehicle viz body, chassis & bumpers front & rear , WatertankBody & in side buffer wall of water tank by way of providing of skilled labour including tools & tackles & welding electrodes as per site requirement(per day) |
282 | Overhauling, repairs & replacement of spares ofjetting reciprocating pumps of sewer cleaning machinesof serial no D35913/08, The job shall included dismounting & remounting of complete pump from the machine dismantalling there of, replacement of all damaged/worn out spares to keep the pump operational complete. |
283 | SUCKING SYSTEM |
284 | Repairs to Sucking pump make jurop made in Italy Modal No PNR 92D Serial no H90015 YEAR 2009. Max PRESSURE IN bars 2ABS & SPEED 1350 RPM The job shall include dismounting of complete suction pump from the machine, |
285 | Shifting to work shop of contracting agency dismantalling thereof. The job shall included replacement of all damaged spares viz, bearing 02no, fiber blades, o-rings, copper pipe with adopter, oil seal & gasket kit complete job.Besides the job shall further includefinshing of uneven bore suface of suction pump by way |
286 | of grinding, honing & polishing finishing of rottor bearing seats by way of machineing job.Re-assembling & remounting of of sucker pump on machine after caried out necessary repairs, checking the performance of pump unit on full load. |
287 | Denting by Hammer Beating /heat treatment as required and repairing rear Mud guard with Patching |
288 | Door Handle outside |
289 | Door handle inside |
290 | Door trim |
291 | Door Lock |
292 | Replacement of side Mirror |
293 | Replacement of front tyresize 8.25/16 LTof required size of make MRF/Goodyear/ Bridge Stone/Coat/JK. |
294 | Replacement of rear tyre size 8.25/16 LTrequired size of make MRF/Goodyear/ Bridge Stone/Coat/JK. |
295 | Providing and fiting of Jetting hose 1/2"" 276 bar2500- 4000 psi (the job includes all necessary fittings) 60m length |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail