|
| 1 | Supply, installation, testing and commissioning of Industrial grade central control system with the following specifications:Processor12th Gen Intel® Core™ i7-12700 (25 MB cache, 2.10 GHz to 4.90 GHz Turbo, 65 W) Windows 11 Pro English, Intel® Integrated Graphics, Network Adapter memory 8 GB, 1 x 16 GB, DDR5, Harddrive 3.5 inch 1TB (SSD) and Monitor and 2 numbers of 80” display Monitor or better |
| 2 | Supply, installation, testing and commissioning of Industrial grade central control system with the following specifications:Processor 10th / 12th Gen Intel® Core™ i9 (20 MB cache) Operating System (windows 10 or higher), ram size: 32 GB DDR5 or better, ram expandability: 128 GB, 1TB SSD or better, Monitor Resolution (PIXELS): 1920x1080 (23’’ or higher) or better |
| 3 | Supply, laying and termination of 4 fiber FO cable with armoured in HDP conduit |
| 4 | Supply, installation, testing & commissioning of Industrial Ethernet Switch 4 Port or better, Boxes for Ethernet Switch 2 Rack, Ethernet Cables and Accessories shall be supported standard communication protocol for this work as per IEC 61850. |
| 5 | Supply installation, testing & commissioning 24 I/P FRTUcontrol panel |
| 6 | Supply installation, testing & commissioning 48 I/P FRTU control panel |
| 7 | Supply, installation, testing & commissioning of Line interface unit |
| 8 | Supply, installation & configuration of HMI SUBSTATION AUTOMATION User Software and minimum of 10000tags or better for all requirements of this work & along with sufficient spare for future expansion with all necessary controls and monitoring of the system 2 user SUBSTATION AUTOMATION, SCADA HMI Development and Programming Charges |
| 9 | Supply installation, testing & commissioning of MFM |
| 10 | Supply installation, testing & commissioning of GPS CLOCK |
| 11 | Supply installation, testing & commissioning of rack comprising aux. power supply unit with backup and arrangement for installation of FRTU, MFM Ethernet switch& LIU |
| 12 | Supply, installation, testing & commissioning of Industrial grade Ethernet switch 8 port at each Control Room location |
| 13 | Providing of working platform for installation of all equipment in control room as per drawing attached |