Military Engineer Services-MES has published Tender For Maintenance & Repair Of Office Equipments For Hq Cwe (Af) Bikaner And Ge (Af) Nal.. Submission Date for this Tender is 19-12-2023. Office Equipments Tenders in Bikaner Rajasthan. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 12-Dec-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 19-12-2023 |
Sl. No. | Item Description |
1 | Maintenance of photocopy Machine Sharp MX-2010U (Colour) to run the machine smoothly for the period of 332 days complete all as specified and as directed by Engineer-in-Charge. Note. Any Parts if required to repair/maintenance to run the machine smoothly shall be measured & paid separately under repective items |
2 | Supply and fix Power Supply with mother board complete all as specified and as directed by Engineer-in-Charge. |
3 | Supply and fix Doveloper with colour complete all as specified and as directed by Engineer-in-Charge. |
4 | Supply and fix Rorter Motor with wire base complete all as specified and as directed by Engineer-in-Charge. |
5 | Supply and fix Duplex Sensor Card complete all as specified and as directed by Engineer-in-Charge. |
6 | Supply and fix Pickup Rubber complete all as specified and as directed by Engineer-in-Charge. |
7 | Supply and fix Drum unit complete all as specified and as directed by Engineer-in-Charge. |
8 | Supply and fix Duplex unit complete all as specified and as directed by Engineer-in-Charge. |
9 | Supply and fix Black Unit complete all as specified and as directed by Engineer-in-Charge. |
10 | Supply and fix three folour unit (Megenta, Yellow & Cyan) complete all as specified and as directed by Engineer-in-Charge. Note : The item against Ser No 02 to 10 is for maintenance & repairs of Photocopy Machine Sharp MX-2010U as mentioned in Ser No 1.00. |
11 | Maintenance of Photocopy Machine Sharp MX-M464N to run the machine smoothly for the period of 332 days complete all as specified and as directed by Engineer-in-Charge. Note : Any parts if required to repair/ maintenance to run the machine smoothly shall be measured & paid separetely under respecitive items. |
12 | Supply and fix Power Supply with mother board complete all as specified and as directed by Engineer-in-Charge. |
13 | Supply and fix Developer with colour complete all as specified and as directed by Engineer-in-Charge. |
14 | Supply and fix Roter Motor with wire base complete all as specified and as directed by Engineer-in-Charge. |
15 | Supply and fix Duplex Sensor Card complete all as specified and as directed by Engineer-in-Charge. |
16 | Supply and fix Pickup Rubber complete all as specified and as directed by Engineer-in-Charge. |
17 | Supply and fix Drum unit complete all as specified and as directed by Engineer-in-Charge. |
18 | Supply and fix Duplex Unit complete all as specified and as directed by Engineer-in-Charge. |
19 | Supply and fix Back Unit complete all as specified and as directed by engineer-in-Charge. |
20 | Supply anf fix original Toner Cartridge suitable for Photocopy Machine SHARP MX-M464N complete all as specified and as directed by Engineer-in-Charge. Note : The item against Ser No 12 to 20 is for maintenance & repairs of Photocopy Machine SHARP MX- M 464N as mentioned in Ser No 11. |
21 | Maintenance of any type of 23 Nos Computer (Monitor & CPU) with 11 Nos UPS compelete are to be maintained for fully functional for the period of 332 days complete all as specified and as directed by engineer-in-Charge. Note. Any Parts if required to repair/maintenance to run the machine smoothly shall be measured & paid separately under repective items. |
22 | Supply and fix Mother board complete all as specified and as directed by Engineer-in-Charge. |
23 | Supply and fix Power Supply Unit complete all as specified and as directed by Engineer-in-Charge. |
24 | Supply and fix Hard Disk complete all as specified and as directed by Engineer-in-Charge. |
25 | Supply and fix RAM (1GB) complete all as specified and as directed by Engineer-in-Charge. |
26 | Supply and fix RAM (2GB) complete all as specified and as directed by Engineer-in-Charge. |
27 | Supply and fix RAM (4GB) complete all as specified and as directed by Engineer-in-Charge. |
28 | Supply and fix UPS Battery 12 Volt 8 AH complete all as specified and as directed by Engineer-in-Charge. Make Exide/Amron/I ball/Luminous/Wipro. Note. The item against SI No 22 to 28 is for maintenance & repairs of any type computer with UPS as mentioned in SI No 21. |
29 | Maintenance of 18 Nos Laser Printer & All in one Printer complete are to be maintained for fully function for the period of 332 days complete all as specified and as directed by Engineer-in-Charge. |
30 | Supply and fix Drum complete all as specified and as directed by Engineer-in-Charge. |
31 | Supply and fix Pressure unit complete all as specified and as directed by Engineer-in-Charge. |
32 | Supply and fix Pickup Rubber complete all as specified and as directed by Engineer-in-Charge. |
33 | Supply and fix Power Supply Card complete all as specified and as directed by Engineer-in-Charge. |
34 | Supply and fix Cartridge Sensor complete all as specified and as directed by Engineer-in-Charge. |
35 | Supply and fix cleaning blade complete all as specified and as directed by Engineer-in-Charge. |
36 | Supply and fix Heat Roller complete all as specified and as directed by Engineer-in-Charge. Note. The item against SI No 30 to 36 is for maintenance & repairs of Laser Printer & All in one Printer as mentioned in SI No 29.00. |
37 | Maintenance of LAN from server to all section ie E-1 to E-8 section for 15 Computer to run the machine smoothly for the period of 332 dayscomplete all as specified and as directed by Engineer-in-Charge. Note. Any Parts if required to repair/maintenance to run the machine smoothly shall be measured & paid separately under repective items. |
38 | Supply and fix Cable Cat 6 UTP complete all as specified and as directed by Engineer-in-Charge. Make TP link/D-Link/I ball/Wipro/HP. |
39 | Supply and fix 8 Port Hub complete all as specified and as directed by Engineer-in-Charge. Make D-Link/I ball/Wipro/HP. |
40 | Supply and fix 24 Port Switcher complete all as specified and as directed by Engineer-in-Charge. Make D-Link/I ball/Wipro/HP. Note : The item against Ser No 38 to 40 is for maintenance of LAN as mentioned in Ser No 37.00 |
41 | Maintenance of intercom exchange system EPAEX Machine (16 Lines+ 04 Line) from Surver to all sections of CWE (AF) Bikaner, to run the machine smoothly for the period of 332 days complete all as specified and as directed by Engineer-in-Charge. Note. Any Parts if required to repair/maintenance to run the machine smoothly shall be measured & paid separately under repective items. |
42 | Supply and fix Power Supply Card for EPABX machine complete all as specified and as directed by Engineer-in-Charge. Note : The item against Ser No 42 is for maintenance of EPAEX Machine as mentioned in Ser No 41.00 |
43 | Miantenance of CCTV Camera 2 Mega Pixal Range (01 Nos) & CCTV Camera 1.3 Mega Pixal Range (15 Nos) installed in office complex of CWE (AF) Bikaner to run the machine smoothly for the periodof 332 days complete all as specified and as directed by Engineer-in-Charge. |
44 | Maintenance of Purifier RO+UV+TDS 25 Ltrs Make Neuro to run the machine smoothly for the period of 332 days complete all as specified and as directed by Engineer-in-Charge. |
45 | Maintenance for lawn mover machine (push by man) to run the machine smoothly for ther perod of 290 days complete all as specified and as directed by Engineer-in-Charge. |
46 | Maintenance of water motor mono pump 2 HP to run the machine smoothly for ther period of 290 days complete all as specified and as directed by Engineer-in-Charge. |
47 | Maintenance of agriculture spray pump to run the machine smoothly for the periof of 290 days complete all as specified and as directed by Engineer-in-Charge. |
48 | Maintenance of photocopy Machine Canon Duplex Type at the office of GE (AF) Nal to run the machine smoothly for the period of 332 days complete all as specified and as directed by Engineer-in-Charge. Note. Any Parts if required to repair/maintenance to run the machine smoothly shall be measured & paid separately under repective items |
49 | Supply and fix Power Supply with Mother board complete all as specified and as directed by Engineer-in-Charge. |
50 | Supply and fix Doveloper with colour, compelete all as specified and as directed by Engineer-in-Charge/GE |
51 | Supply and fix Rorter Motor with wire base complete all as specified and as directed by Engineer-in-Charge. |
52 | Supply and fix Duplex Sensor Cardcomplete all as specified and as directed by Engineer-in-Charge. |
53 | Supply and fix Pickup Rubber complete all as specified and as directed by Engineer-in-Charge. |
54 | Supply and fix Drum unit complete all as specified and as directed by Engineer-in-Charge. |
55 | Supply and fix Duplex Unit complete all as specified and as directed by Engineer-in-Charge. |
56 | Supply and fix Back Unit complete all as specified and as directed by Engineer-in-Charge. |
57 | Supply and fix original Toner Cartridge suitable for Photocopy Machine Canon Duplex Type complete all as specified and as directed by Engineer-in-Charge. Note. The item against Si No 49 to 57 if for maintenance & repairs of photocopy Machine Canon Duplex Type as mentioned in SI No 48 |
58 | Maintenance of any type of 22 Nos Computer (Nonitor & CPU) with 09 Nos UPS compelete are to be maintained at the office of GE (AF) Nal for fully functional for the period of 332 dayscomplete all as specified and as directed by Engineer-in-Charge. Note. Any Parts if required to repair/maintenance to run the machine smoothly shall be measured & paid separately under repective items. |
59 | Supply and fix Mother board complete all as specified and as directed by Engineer-in-Charge. |
60 | Supply and fix Power Supply Unit complete all as specified and as directed by Engineer-in-Charge. |
61 | Supply and fix Hard Disk, complete all as specified and as directed by Engineer-in-Charge/GE |
62 | Supply and fix RAM (1GB) complete all as specified and as directed by Engineer-in-Charge. |
63 | Supply and fix RAM (2GB) complete all as specified and as directed by Engineer-in-Charge. |
64 | Supply and fix RAM (4GB) complete all as specified and as directed by Engineer-in-Charge. |
65 | Supply and fix UPS Battery 12 Volt 8 AH complete all as specified and as directed by Engineer-in-Charge. Make Exide/Amron/I ball/Luminous/Wipro. Note. The item against SI No 59 to 65 is for maintenance & repairs of any type computer with UPS as mentioned in SI No 58. |
66 | Maintenance of 07 Nos Laser Printer & All in one Printer complete are to be maintained at the office of GE (AF) Nal for fully function for the period of 332 dayscomplete all as specified and as directed by Engineer-in-Charge. Note. Any Parts if required to repair/maintenance to run the machine smoothly shall be measured & paid separately under repective items. |
67 | Supply and fix Drum complete all as specified and as directed by Engineer-in-Charge. |
68 | Supply and fix Pressure unit complete all as specified and as directed by Engineer-in-Charge. |
69 | Supply and fix Pickup Rubber complete all as specified and as directed by Engineer-in-Charge. |
70 | Supply and fix Power Supply Card complete all as specified and as directed by Engineer-in-Charge. |
71 | Supply and fix Cartridge Sensor complete all as specified and as directed by Engineer-in-Charge. |
72 | Supply and fix cleaning blade complete all as specified and as directed by Engineer-in-Charge. |
73 | Supply and fix Heat Roller complete all as specified and as directed by Engineer-in-Charge. |
74 | Supply and fix original Toner Cartridge suitable for abovementioned Laser Printers complete all as specified and as directed by Engineer-in-Charge. |
75 | Refilling of existing Toner Cartridge with suitable ink powder and fixing complete all as specified and as directed by Engineer-in-Charge. Note. The item against SI No 67 to 75 is for maintenance & repairs of Laser Printer & All in one Printer as mentioned in SI No 66. |
76 | Provn ofLAN connectionto all sections i.e E-1 to E-8 Section for 15 Computers complete all as specified and directed by Engineer-in-Charge as per following items . |
77 | Supply and fix CableCat 6 UTP Complete all as specifiedand as directed by Engineer-in-Charge.Make : TP Link/D-Link/I Ball/Wipro/HP |
78 | Supply and fix Rack 4U (Iron) with Switch plate omplete all as specified and as directed by Engineer-in-Charge. Make : TP Link/D-Link/I Ball/Wipro/HP |
79 | Supply and fix RJ Connector ( Cat -6 ) Complete all as specified and as directed by Engineer-in-Charge. Make : TP Link/D-Link/I Ball/Wipro/HP |
80 | Supply and fix 24 port Switcher DGS complete all as specified and as directed by Engineer-in-Charge. Make : TP Link/D-Link/I Ball/Wipro/HP |
81 | Supply and fix I/O Box( Cat -6 ) Complete all as specified and as directed by Engineer-in-Charge.Make : TP Link/D-Link/I Ball/Wipro/HP |
82 | Supply and fix Patch Cord (3 Meter, Cat -6 )Complete all as specified and as directed by Engineer-in-Charge. Make : TP Link/D-Link/I Ball/Wipro/HP |
83 | Supply and fix fitting plastic pipe 1 inch dia Complete all as specified and as directed by Engineer-in-Charge. |
84 | Maintenance of photocopy Machine Sharp MX- 3051 (Colour) to run the machine smoothly for the period of 332 days complete all as specified and as directed by Engineer-in-Charge. Note. Any Parts if required to repair/maintenance to run the machine smoothly shall be measured & paid separately under repective items |
85 | Supply and fix Power Supply with mother board complete all as specified and as directed by Engineer-in-Charge. |
86 | Supply and fix Doveloper with colour complete all as specified and as directed by Engineer-in-Charge. |
87 | Supply and fix Rorter Motor with wire base complete all as specified and as directed by Engineer-in-Charge. |
88 | Supply and fix Duplex Sensor Card complete all as specified and as directed by Engineer-in-Charge. |
89 | Supply and fix Pickup Rubber complete all as specified and as directed by Engineer-in-Charge. |
90 | Supply and fix Drum unit complete all as specified and as directed by Engineer-in-Charge. |
91 | Supply and fix Duplex unit complete all as specified and as directed by Engineer-in-Charge. |
92 | Supply and fix Black Unit complete all as specified and as directed by Engineer-in-Charge. |
93 | Supply and fix three folour unit (Megenta, Yellow & Cyan) complete all as specified and as directed by Engineer-in-Charge. Note : The item against Ser No 78 to 86 is for maintenance & repairs of Photocopy Machine Sharp MX-3051 as mentioned in Ser No 77.00. |
94 | Maintenance of Photocopy Machine Sharp XEROX 6204 to run the machine smoothly for the period of 332 days complete all as specified and as directed by Engineer-in-Charge. Note : Any parts if required to repair/ maintenance to run the machine smoothly shall be measured & paid separetely under respecitive items. |
95 | Supply and fix Power Supply with mother board complete all as specified and as directed by Engineer-in-Charge. |
96 | Supply and fix Developer with colour complete all as specified and as directed by Engineer-in-Charge. |
97 | Supply and fix Roter Motor with wire base complete all as specified and as directed by Engineer-in-Charge. |
98 | Supply and fix Duplex Sensor Card complete all as specified and as directed by Engineer-in-Charge. |
99 | Supply and fix Pickup Rubber complete all as specified and as directed by Engineer-in-Charge. |
100 | Supply and fix Drum unit complete all as specified and as directed by Engineer-in-Charge. |
101 | Supply and fix Duplex Unit complete all as specified and as directed by Engineer-in-Charge. |
102 | Supply and fix Back Unit complete all as specified and as directed by engineer-in-Charge. |
103 | Supply anf fix original Toner Cartridge suitable for Photocopy Machine SHARP MX-M464N complete all as specified and as directed by Engineer-in-Charge. Note : The item against Ser No 88 to 96 is for maintenance & repairs of Photocopy Machine SHARP MX- M 464N as mentioned in Ser No 87. |
104 | Maintenance of LG 190 Ltr single door refrigerator complete all as specified and as directed by Engineer-in-Charge. Note. Any Parts if required to repair/maintenance to run the refrigerator smoothly shall be measured & paid separately under repective items |
105 | Upgradation of windows (Windows 10) with 8 GB RAM in 07 computers including taking backup & reinstalling all as per existing complete all as specified and directed by Engineer-in-Charge. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail