Indian Oil Corporation Limited-IOCL has published Providing Comprehensive Operation And Maintenance (O&M) Services For City Gas Distribution Network For: Group A - Bokaro Ga, Group B - Sasaram Ga, Group C - Madurai Ga, Group D - Thoothukudi Ga Group E - Koderma Ga. Submission Date for this Tender is 19-12-2023. Gas Pipe Line Tenders in noida Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | WORKS IN THE STATE OF BIHAR |
2 | Establishing Area Emergency Office (AEO) , Local Customer Care Office (LCO) , Hiring of ERV, Hiring of Motor Cycle for Patrolling and Meter Reading Charges |
3 | Hiring of space for Area Emergency Office(AEO)with necessary facilities viz.; Office space for O&M team, Pantry, toilet, ERV parking, Stores for spares/ fittings (including free issue material), Tools & tackle, Telephones, Computers, air conditioners, Printers, Furnitures, visitor waiting chairs (metal perforated bench chairs), etc.Detailed in line with Technical specification of Tender. Minimum area of 1500 Square Feet in a single floor with sufficient space for stores and parking facilities |
4 | Providing ER Vehicle with driver (Mahindra Pick-up/ TATAPick-up/ Equivalent) 24x7 for Routine and Break down maintenance works at site. Vehicle should be latest model fitted with GPS Tracking device and adequate space to carry consumables tools & tackles for various O&M activities, Fire and Safety apparatus, PPEs, first aid box & shall also be equiped with 5Kva generator set with Emergency Light. Minimum ERV run of 2000km per month with start and terminationpoint will be AEO office or as decided by EIC. Note: Escalation of price as per increase or decrease of fuel price above 10% as per escalation clause of Tender. |
5 | Extra running km of ERV over and above 2000 Km per month |
6 | Hiring of Motor Cycle for pipe line patrolling with GPS enabled mobile devices for monitoring and surveillance & safety of IOCL’s Pipelines/ Installations etc. Minimum motor cycle run of 3000km per month with start and terminationpoint will be AEO office or as decided by EIC. (Zone wise Bike for patroller /LCO is considered). Latest Model or later having capacity at least100/125 CCNote: No proice Escalation for Motor Cycle is being envaisaged in the tender. |
7 | Extra running km of Motor Cycle over and above 3000 Km per month |
8 | Charges for Meter Reading for Domestic, Commercial & Industrial Connections Note: Surprise visit of metering as and when required shall be in contractor scope. |
9 | Hiring of Machine/ equipments for Maintenance work. The period ofhiring will start after the equipment reaches at site and ends when equipment leaves the site. Break down period of equipment will not be paid. Normal working time per day will be 8 Hrs. Hiring rates is inclusive of diesel, operators cost, Maintenance cost etc. |
10 | Hiring of JCB |
11 | Hiring of Hydra - 5 MT capacity |
12 | Hiring of Hydra - 10 MT capacity |
13 | Hiring of Crane - 20 MT capacity |
14 | Hiring of Ladder up to 25 Feets |
15 | Hiring of Diesel Generator set - 15 KVA |
16 | Hiring of Dewatering Pump - 5 KL/ Hr. Capacity |
17 | Hiring of Concrete / Rock Breaker |
18 | Hiring of Compressor for Flushing & testing up to 100 CFM |
19 | Hiring of Tractor |
20 | Supply of Materials under Contractor"s scope |
21 | Supply of PE Electrofusion fittings as per tender documents |
22 | Supply of Reducer 125 x 90 mm |
23 | Supply of Reducer 125 x 63 mm |
24 | Supply of Reducer 90 X 63 mm |
25 | Supply of Reducer 63 X 32 mm |
26 | Supply of Reducer 32 X 20 mm |
27 | Supply of Coupler 125 mm |
28 | Supply of Coupler 90 mm |
29 | Supply of Coupler 63 mm |
30 | Supply of Coupler 32 mm |
31 | Supply of Coupler 20 mm |
32 | Supply of Equal Tee 125 mm |
33 | Supply of Equal Tee 90 mm |
34 | Supply of Equal Tee 63 mm |
35 | Supply of Equal Tee 32 mm |
36 | Supply of Equal Tee 20 mm |
37 | Supply of End Cap 125 mm |
38 | Supply of End Cap 90 mm |
39 | Supply of End Cap 63 mm |
40 | Supply of End Cap 32 mm |
41 | Supply of End Cap 20 mm |
42 | Supply of Saddle 125 x 63 mm |
43 | Supply of Saddle 125 x 32 mm |
44 | Supply of Saddle 90 x 63 mm |
45 | Supply of Saddle 90 x 32 mm |
46 | Supply of Saddle 90 x 20 mm |
47 | Supply of Saddle 63 x 32 mm |
48 | Supply of Saddle 32 x 20 mm |
49 | Supply of Saddle 63 X 20 mm |
50 | Supply of Elbow (90°) 125 mm |
51 | Supply of Elbow (90°) 90 mm |
52 | Supply of Elbow (90°) 63 mm |
53 | Supply of Elbow (90°) 32 mm |
54 | Supply of Elbow (45°) 125 mm |
55 | Supply of Elbow (45°) 90 mm |
56 | Supply of Elbow (45°) 63 mm |
57 | Supply of Elbow (45°) 32 mm |
58 | TF 32mm x 1" |
59 | TF 32mm x 3/4" |
60 | TF 20mm x 1/2" |
61 | Supply of PE Valves - 125mm |
62 | Supply of PE Valves - 90mm |
63 | Supply of PE Valves - 63mm |
64 | Supply of PE Valves - 32mm |
65 | Supply of Powder coated GI pipes ( C-Class), GI Fitting (IS 1879) and others as per tender documents |
66 | Supply of1/2" GI Pipe |
67 | Supply of3/4" GI Pipe |
68 | Supply of1" GI Pipe |
69 | Supply of1.5" GI Pipe |
70 | Supply of Copper Tube 12mm |
71 | GI Fitings of 1" Elbow |
72 | GI Fitings of 3/4" Elbow |
73 | GI Fitings of 1/2" Elbow |
74 | GI Fitings of 1" Hex Nipple |
75 | GI Fitings of 1/2" Hex Nipple |
76 | GI Fitings of 3/4" Hex Nipple |
77 | GI Fitings of 1" NB Barrel Nipple |
78 | GI Fitings of 1/2" NB Barrel Nipple |
79 | GI Fitings of 3/4" NB Barrel Nipple |
80 | GI Fitings of 1" Coupling-M |
81 | GI Fitings of 3/4" Coupling-M |
82 | GI Fitings of 1/2" Coupling-M |
83 | GI Fitings of 1" Plug-M |
84 | GI Fitings of 3/4" Plug-M |
85 | GI Fitings of 1/2" Plug-M |
86 | GI Fitings of 1/2" hex Plug |
87 | GI Fitings of 3/4" hex Plug |
88 | GI Fitings of 1" hex Plug |
89 | GI fittings 1" Union |
90 | GI fittings 3/4" Union |
91 | GI fittings 1/2" Union |
92 | GI Fitings of 1 " x 1/2" Reducer-M |
93 | GI Fitings of 3/4 " x 1/2" Tee-M |
94 | GI Fitings of 1 " x 1/2" Tee-M |
95 | GI Fitings of 1" Tee-M |
96 | Supply of 3/4" x 1/2" Bush-M |
97 | Supply of 3/4" x 1" Bush-M |
98 | Supply of Blind Meter Adaptor- GI ( Temporary Disconnetion of Dom. Customers) |
99 | Supply of Meter Adaptor- Brass for G-1.6 Meter(Domestic Meter) |
100 | Supply of Meter Adaptor- Brass for G-6 Meter |
101 | Supply of Meter Adaptor- Brass for G-10 Meter |
102 | Supply of Meter Adaptor- Brass for G-16 Meter |
103 | Supply of Meter Adaptor- Brass for G-25 Meter |
104 | Supply of 1"GI Powder Coated Clamp with screw |
105 | Supply of Fine Sand |
106 | Supply of Soft Soil/Sand (preferably) for backfilling |
107 | Replacement of SS 316 Anaconda |
108 | Supply of Isolation & Appliance Valve |
109 | Isolation Ball valve (1/2") |
110 | Isolation Ball valve (3/4") |
111 | Isolation Ball valve (1") |
112 | Isolation Ball valve (1.5") |
113 | Appliance valve (1/4") |
114 | Appliance valve (1/2") |
115 | Supply of SS Tubes,SS Fittings,& SS valves |
116 | ¾”OD X 0.095” min Wall thk., SS Material Grade TP316 / TP316L Seamless Tube as per ASTM A269 |
117 | ½”OD X 0.083”min Wall thk., SS Material Grade TP316 / TP316L Seamless Tube as per ASTM A269 |
118 | End connection:½" Tube OD, for stem & ½”NPT (F) for body SS Material Grade TP316 / TP316L as per ASTM A269; Rated pressure : 5000 PSI @ 70°F Temperature: 0°F to 400°F |
119 | Plug: ¾" OD, SS Material Grade TP316 / TP316L as per ASTM A269 (Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
120 | Plug: ½" OD, SS Material Grade TP316 / TP316L as per ASTM A269 (Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
121 | Cap: ¾" OD,SS Material Grade TP316 / TP316L as per ASTM A269 (Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
122 | Cap : ½" OD,SS Material Grade TP316 / TP316L as per ASTM A269 (Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
123 | Union : ¾” OD, SS Material Grade TP316 / TP316L as per ASTM A269 (Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
124 | Union : ½" OD,SS Material Grade TP316 / TP316L as per ASTM A269 (Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
125 | Reducing Union: Tube OD 3/4" x Tube OD 1/2", SS Material Grade TP316 / TP316L as per ASTM A269 (Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
126 | Equal Tee: Size 3/4" OD x ¾" OD x ¾" OD,SS Material Grade TP316 / TP316L as per ASTM A269 ( Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
127 | Equal Tee: Size 1/2" OD x ¾" OD x ¾" OD,SS Material Grade TP316 / TP316L as per ASTM A269 ( Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
128 | Reducing Union Tee: ¾" OD x ½" OD x ¾" OD, SS Material Grade TP316 / TP316L as per ASTM A269(Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
129 | Tube End Connection: ¾" OD x ½" OD x ¾" OD, SS Material Grade TP316 / TP316L as per ASTM A269(Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
130 | Front Ferrule: 3/4" OD,SS Material Grade TP316 / TP316L as per ASTM A269(Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
131 | Front Ferrule: 1/2" OD,SS Material Grade TP316 / TP316L as per ASTM A269(Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
132 | Back Ferrule: 3/4" OD,SS Material Grade TP316 / TP316L as per ASTM A269(Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
133 | Back Ferrule: 1/2" OD,SS Material Grade TP316 / TP316L as per ASTM A269(Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
134 | Male Connector: Size ¼” NPT (M) x 3/8” OD,SS Material Grade TP316 / TP316L as per ASTM A269(Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
135 | Male Connector: Size 1/2” NPT (M) x 3/8” OD,SS Material Grade TP316 / TP316L as per ASTM A269(Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
136 | SS Ball Valves: 2-Way Trunnion Mounted Normal Bore Ball Valve ¾"(Rated pressure : 6000 PSI @ 70°F Temperature : 0°F to 400°F) with additional 1 set of Nuts, Backs & Front Ferrule etc. |
137 | SS Ball Valves: 2-Way Trunnion/ Floating Normal Bore Ball Valve ½"(Rated pressure : 6000 PSI @ 70°F Temperature : 0°F to 400°F) with additional 1 set of Nuts, Backs & Front Ferrule etc. |
138 | SS Ball Valves: 3-Way Trunnion Mounted, Reducer BoreBall Valve ½" OD end Connection and ¼” NPT (F) bottom end connection(Rated pressure : 6000 PSI @ 70°F Temperature : 0°F to 400°F) with additional 1 set of Nuts, Backs & Front Ferrule etc. |
139 | Conductive Core Thermoplastic Hose: 3/8” ID Conductive Core Thermoplastic Hose for CNG Service with break away coupling |
140 | Cross: 3/4" OD X 3/4”X 3/4" OD X3/4" OD SS Material Grade TP316 / TP316L as per ASTM A269(Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
141 | Supply of Steel Pipeline Leak Clamp (nominal dia 12 / 10 / 8 / 6 / 4 -inch) at designated location/ sites including transportation of leak clamp, (Standard leak clamp oflength of 60 Cm has been assumed) (As per detailed Scope of Work) |
142 | 12" |
143 | 8" |
144 | 6" |
145 | 4" |
146 | Supply ofLiquid Epoxy Paint POWERCRETE R95 along with APPLICATOR PAD KIT |
147 | Supply of Gasket |
148 | Supply of Spiral Wound Metallic Gaskets (12" x 300#) |
149 | Supply of Spiral Wound Metallic Gaskets (10" x 300#) |
150 | Supply of Spiral Wound Metallic Gaskets (8" x 300#) |
151 | Supply of Spiral Wound Metallic Gaskets (6" x 300#) |
152 | Supply of Spiral Wound Metallic Gaskets (4" x 300#) |
153 | Supply of Spiral Wound Metallic Gaskets (2" x 300#) |
154 | Supply of Grease Gun ( Capacity-5kg) as per technical Specifications approved by EIC |
155 | Supply of IOCL SERVO Grease as per technical Specifications approved by EIC |
156 | Supply of Valve SEALANT INJECTION KIT(High pressure sealant injection kit with 3 packs of sealant per kit as per technical Specifications approved by EIC) |
157 | Supply of Sealent Cartridges Audco 733 or equivalent for Valves (As per technical Specifications approved by EIC) |
158 | O&M SERVICES - The cost include all expenses towards manpower, tools, tackles, consumables etc. required to perform the activities to the satisfaction of EIC. |
159 | Fitting and Welding of sleeve:Fabrication, fitment, and welding for Full encirclement sleeves (up to 1 m) from owner supplied pipes over pitted sections of the exposed pipeline including testing / inspection (DP test), supply of all equipment, consumables, labour etc. required to complete the work in all respects as per the specifications and directions of the Site Engineer/E-I-C. Pipes will be supplied by theOwner from Owner"s nearest Store Yards and shall be transported to site at the Contractor"s risk & cost for sleeving |
160 | 12"" |
161 | 8"" |
162 | 6"" |
163 | 4"" |
164 | WELDING AND FITTING OF LEAK CLAMP Fitting and Welding of leak clamp over mainline pipe of with the help of welding machine and qualified welder under the direction and supervision of site engineer.Welding charges include fuel charges for the DG Machine, charges of the welder and helpers, cost of welding rods etc. complete in all respect.Welding of leak clamp includes welding circumferentially and longitudinally including welding of fasteners (nuts & bolts), Testing of welding with Dye Penetration Test complete in all respect as per direction of EIC/ Site Engineer/ Site Representative. |
165 | 12" |
166 | 8" |
167 | 6" |
168 | 4" |
169 | Welding in existing structure, pipe etc including mobilization of welder, machine for grinding, chipping etc., welding rod as approved by EIC and all other consumables required to complete the work in all respects as per instruction of EIC/site Engineer. Structural steel/pipe etc will be supplied by owner. |
170 | MDPE pipe Line Repairing including excavation, leakage arrest, jointing and restoration of any dia up-to 63 mm including supply and installation of all fittings required. MDPE Pipe required shall be issued by Owner as free issue material. All other fittings/consumables shall be supplied by Contractor, payment of which shall be admissible as per items list in section "D". Rate of Items or Consumables which are not mentioned in section D, shall be supplied by Contractor |
171 | MDPE pipe Line Repairing including excavation, leakage arrest, jointing and restoration of any dia above 63 mm including supply and installation of all fittings required. MDPE Pipe required shall be issued by Owner as free issue material. All other fittings/consumables shall be supplied by Contractor, payment of which shall be admissible as per items list in section "D". Rate of Items or Consumables which are not mentioned in section D, shall be supplied by Contractor |
172 | Ultrasonic Thickness Testing at designated locations as informed by Engineer In Charge |
173 | Noise Level Survey at designated locations as informed by Engineer In Charge |
174 | Drilling of hole for NG Conversion |
175 | In RCC |
176 | In Brick |
177 | Painting of Piping and Structure / Electrical Pole / Crash Barrier/ Manhole Cover (Paints and other consumables to be supplied by contractor) |
178 | Painting of Wire mesh /Fencing(Paints and other consumables to be supplied by contractor) |
179 | Supply & InstallationRoute Marker, Pole Marker and Plate Marker |
180 | RCC Route Marker |
181 | Pole Marker with Foundation |
182 | Plate Marker |
183 | Installation of SS tubing/GI Pipes including Bending, testing & Commissioing with consumable such as teflon tap etc for 1/4", 1/2", 3/4", 3/8", 7/8". |
184 | Supply & Installation of Warning Tape / Anti- Rodent Tape as per Owner Specification |
185 | Supply and Installation of Type A/Type A1/Type B/Type C/ Type D Test Lead Point (TLPs) |
186 | Repair ofType A/Type A1/Type B/Type C/ Type D Test Lead Point (TLPs) |
187 | Electrical & T & I Services |
188 | "SUPPLY OF LAMPS Supply ofbelow given M/s Philips or equivalent make lamps for installation in lighting fittings / fixtures as per directions of EIC.LED tubelight 18W |
189 | Electricalwiring(comprisingofsingleortwincorePVC wires upto 6 Sq mm and single earth wire upto 6 SWG) along with its connected accessories like junction boxes, surface conduits, battons, switch boards etc. |
190 | SUPPLY & INSTLN. OF FUSEPARTS (KNIFE TYPE HRC FUSE LINK) 80 - 100 AMP Size 000 |
191 | "SUPPLYANDINSTALLATIONOFFLPJUNCTION BOXES"4-way Ex-e, WP Junction box with threded cover |
192 | Measuring & Testing Caliberation of Instruments at respective stations such as CNG, CGS & SV Stations |
193 | Supply & Installation of Pressure Gauge |
194 | Supply & Installation of Temperature Gauge |
195 | Supply laying & installation of GI Earthing strip 40X5 mm |
196 | GI Earthing- 65 Dia Pipe - 3.5 Mtr depth |
197 | Supply & installation of FLP lights at CNG stations. |
198 | SupplyandinstallationofshockhazardchartasperIE Rules1956(Clause-44)completewithframeandglass including necessary clamps, bolts, rawl plugs, etc. breachkingandmakinggoodthewallifrequired.All complete with labour and materials as per |
199 | Supply and installation of "Caution Boards" at sub-stations asperIS2551/uptodateincludingsupplyofnecessary clamps, nuts, bolts and other hardware. All complete with labour and materials as per the direction of the Engineer- in-Charge |
200 | "PROVIDE FIRST-AID BOXES Supply and fixing of First-Aid boxes as per IE Rules, 1956 Clause 43(2), including necessary clamps, bolts, rawl plugs, etc. breachking and making good the walls if required. All complete with labour and materials as per the direction of Engineer-in-Charg |
201 | Supplying and fixing of following MCBs with necessary interconnections on existing DB, Panel Board etc. Cost includes |
202 | Upto 6-32A SP MCB |
203 | Upto 6-32 A DP MCB |
204 | Upto 32A FP MCB |
205 | Upto 32A TP MCB |
206 | Upto 40A FP MCB |
207 | Upto 63A Fp MCB |
208 | 25 / 32 / 40 / 63amps, 4-pole, 30mA ELCB |
209 | 25/32/40/63 amps, 4-pole, 100 mA ELCB |
210 | Illumination Survey at Designated Locations |
211 | Operation and Maintenace of SCADA |
212 | Blowing of Optical Fiber Cable : - All activities pertaining to blowing of optical fiber cable in self lubricated HDPE Telecom duct (after testing of drum at site),through CS/ HDPE conduits at crossing, cable sealing, padding, backfilling etc. using all materials required, etc. all complete as per specifications and drawing provided in the bid document & as per direction of consultant. |
213 | Supply and installation of jointing pits, including sand, etc. all complete as per spec., drawing provided in the bid document and the direction of client / consultant. |
214 | Jointing / splicing of optical fiber cable ( 24 Fibers ) including supply and installation of Joint Kit, joint markers (RF id Disk type), etc., testing all completed as per specifications &drawingprovided in the bid document and direction of consultant. |
215 | Supply & installation of optical splice closer as per specifications & drawingprovided in the bid document and direction of client / consultant |
216 | Supply & installation of Fiber termination cabinet as per specifications & drawingprovided in the bid document and direction of client / consultant |
217 | Excavation, Backfilling and Coat & Wrap work |
218 | COAT AND WRAP WORK Coat and Wrap work of welded leak clamp / over pipe length including cleaning of leak clamp and adjacent pipe section, application of primer, application of outer and inner layer of cold applied tapes. Coating Material willl be provided by IOCL |
219 | Excavation in all types of Rock (hard / Ordinary) :Excavation Work in Rock (all types : hard / Ordinary) by mechanical means (Hydraulic / Pneumatic Excavator & Hand Operated ) and Manual means for all ty pes of Rock (Hard / Ordinary) including disposal of excavated Rock as per instruction of EIC and neaty dressed - for all type of Rock (Blasting Prohibited).This job shall also may include of depth 1meter beneath bottom surface of the pipe.Site supervision & resource to be eployed as per direction of EIC |
220 | Backfilling of Excavated Pit / Trecnch:Backfilling of the excavated pit/trench by Hydraulic means (JCB)/Manual Means, soil (excluding rock) removed during excavation of trench (stored within 50 m radius of the excavated trench) |
221 | Coating Removal & Peel off Test: Surface Preparation of Pipe : Removal of Three Layer Polyehylene Coating (3 LPE): Coating of the pipe surface is to be removed by mechanical means i.e. by chiesel and onward surface preparation by Grinder for cleaning the coating bond material with portable power grinder driven emery paper (duty approved by IOCL).This shall be inclusive of pipe fitter, Grinder, helper required for cleaning of the pipe surface. |
222 | Application of Primer & Cold Tape: Supply & application of Cold Tape along with primer : The coating material should be of make Denso / RAYCHEM equivalent make of Disired Length with 67% overlapping ,, with prior application of primer on pipe surface as per manufacturer specification.This shall be inclusive of applicator along with all requisite tools, with 67% overlapping.Installation shall be acceptable only after acceptance in holiday test.Also Match stick wherever is required for minor defects |
223 | ADDITIONAL O&M SERVICES |
224 | Annual Maintenance of PNG Connections |
225 | AMC of Dom Connection- - Leakage testing (LDT) - Leakage testing (LPT with digital manometer) - Clamping, Paint Touch up - Check Meter working in gas flow condition - Leakage identification & rectification - Checking of RCC gaurd, sand filling and cementing - Checking & reporting of un-authorised extension of gas pipeline & Rubber Tube / other anomalies - Checking of Service line, Meter or Regulator "O" ring or Adaptor - Repalcement of Surakaha hose in case of damaged, expired for all Points etc. with clamp. - Replacement of o-ring for arresting the leakage from adaptor - Collect and Update customer contact details (Updation of mobile numbers (primary and secondary) and email id. |
226 | AMC of Com / Non Com / NDEC Connection - Leakage testing (LDT) - Leakage testing (LPT with digital manometer) - Clamping, Paint Touch up - Check Meter working in gas flow condition - Leakage identification & rectification (alteration charges will be paid as per Alteration Line item) - Checking of RCC gaurd, sand filling and cementing - Checking and reporting of un-authorised extension of gas pipeline and Rubber Tube - Checking of Service line,Meter or Regulator "O" ring or Adaptor - Repalcement of Surakaha hose in case of damaged, expired for all Points etc. with clamp & o-ring for arresting the leakage from adaptor - Collect & Update customer contact details – mobile numbers (primary and secondary) and email id (Material will be supplied as per Section C- expect sand,cement, paint and consumables) |
227 | Attending customer service requests and resolving the complaints in all respects as detailed in scope of work and special conditions of contract and as per directions/ instructions of EIC/ Authorized representative including but not limited to following: Venting, Flushing, Modifications, Meter/ Regulator Change, Testing, Painting, etc. in gas charged area. Installation of clamps, fittings and hardware is in scope of contractor. Any additional GI Pipe (if required) in case dismantled pipe are not healthy or short, item shall be paid as per relevant SOR item. Dismantled pipe/ fittings to be returned at Owner Store or site office as instructed by EIC. |
228 | GI Riser Testing (Transition Fitting to Meter Isolation Valve) all sizes |
229 | Internal Testing (Meter Isolation Valve to Appliance Valve) |
230 | Conversion of LPG to PNG/ PNG to LPG burner |
231 | Supply of Steel Reinforced Rubber Hose with Clamps |
232 | Flame Problem |
233 | Meter checking by check meter in series |
234 | Replace Brass Connector/ Adapter |
235 | Dismantling of GI Pipe in case modification, leakage or site requirements 3/4" |
236 | Dismantling of GI Pipe in case modification, leakage or site requirements 1/2" |
237 | Dismantling of Copper Pipe in case modification, leakage or site requirements |
238 | Reinstallation and painting of GI Pipe using Old dismantled pipe 3/4" |
239 | Reinstallation and painting of GI Pipe using Old dismantled pipe 1/2" |
240 | Reinstallation of Copper Pipe using Old dismantled pipe |
241 | Replacement of SS 316 Anaconda |
242 | Replacement of meter / Regulator |
243 | FIRE FIGHTING AND SAFETY |
244 | Supply of Fire Fighting Equipmets- The cost include all expenses towards manpower, tools, tackles, consumables etc. required to perform the activities to the satisfaction of EIC. These activities shall be performed ON NEED BASIS AS PER EIC INSTRUCTIONS. - These activities have to be performed by additional manpower OTHER than manpower of Section A. (Note: if these activities are performed by MANPOWER of Section A, no separate payment as per below rates shall be paid). However, in certain circumstances, as and when required and instructed by EIC, these activities will be performed by ADDITIONAL manpower (other than Section A) and the payment against items in Section G shall be paid. - The cost include all expenses towards manpower, tools, tackles, consumables etc. required to perform the activities to the satisfaction of EIC. |
245 | 25 kg DCP Extinguisher |
246 | 9 kg DCP Extinguisher |
247 | 4.5 kg CO2 Extinguisher |
248 | 2.0 kg CO2 Extinguisher |
249 | 2 kg clean agent extinguishers IS 15683 Marked |
250 | Type B Delivery Hoses of 15 M length bearing IS-636 mark |
251 | Pair of Rubber hand gloves for Electrical work bearing IS mark |
252 | Fire Bucket |
253 | Safety Helmet |
254 | Explosimeter (LEL Meter) |
255 | Positive Pressure type self containing Breathing Apparatus |
256 | Safety Torch |
257 | Fire Proximity suit |
258 | Taking delivery and refilling the extinguishers of various sizes/ capabilities including supply of dry chemical powder, CO2 gas etcupdating the data & identification tags, recording the status ofchecking in history register etc as per ISI standard and replacing thesame as directed by Engineer-in-Charge (The rates are inclusive of allTaxers). (The CO2 cylinder may to be taken out and delivered back within10 days after re-filling /repairing. However Fire extinguishers CO2 areto be supplied /Kept temporary in place of each fire extinguisher forwhich taking out for re-filling/ repairing is required). |
259 | Dry Chemical Powder |
260 | 0.2 kg DCP Cartridge |
261 | 2 kg CO2 Cylinder |
262 | 3.2 kg CO2 Cylinder |
263 | 4.5 kg CO2 Cylinder |
264 | 6.8 kg CO2 Cylinder |
265 | 10 Kg DCP Cylinder |
266 | 75 Kg DCP Cylinder |
267 | Supply and replacing the spares /assembles etc of the Fire Fighting equipments system for all sizes/ Capacities as per ISI standard and approved make with all labours, materials, carriages, inclusive of alltaxes etc. complete |
268 | Rubber washer for Extinguisher |
269 | CO2 Safety valves 155kgf/cm2 |
270 | CO2 Safety pins |
271 | ISI marked Discharge Pipe with horn for 6.5 Kg and 6.8Kg CO2Exitinguishers. |
272 | Rubber Gasket OF DCP Main Cap |
273 | DCP main Cap (gun metal) CP |
274 | DCP Plunger Pin with Spring |
275 | DCP Plunger top |
276 | Squeezing grip (Plastic) nozzle |
277 | DCP cylinder discharge pipe of sufficient length for 10 Kg capacity Fire Extinguisher |
278 | DCP cylinder discharge pipe of sufficient length for 75 Kg capacity Fire Extinguisher |
279 | Hydrostatic testing, and inspection of high pressure CO2 extinguishers through PESO approved party andchargingupto required pressure(Refilling) includingtakingdelivery of the cylinder from the station and returning the same to station inclusive of all labour material, transportation and all the other incidental expenses). The cylinder is to be returned back to the station within 15 days from the date of receiving from the station. (For 2Kg /4.5 kg /6.8/ 45 kg CO2 cyl. and DCP cartridges) |
280 | "Supply and painting with two coats synthetic enamel paint (Asian/Burger) fire paint including scrapping, cleaning, applying onecoat of red oxide primer cost of all labours, materials, carriage,taxes, letter/number writing, identification marks etc. complete in allrespect." |
281 | Spray/Brush painting of fire bucket stand with its bucket (4-6 Bucket)including letter/number writing. |
282 | Spray painiting of Fire extinguishers of all sizes includingletter/number writing. |
283 | Fire Siren including letter/ number writing. |
284 | Air filling in cylinders of Breathing Apparatus inclusive of all taxes with transportation |
285 | Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 2 to 4.5Kg/Cm2) |
286 | Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 6.8Kg/Cm2) |
287 | Hydraulic testing of DCP Cylinders of all sizes inclusive of all taxes |
288 | Hydraulic testing of Breathing Appratus Set |
289 | Supply and fixing of wind socks on the position including all labour,tools and tackels as per direction of Engineer-in-Charge inclusive of all taxes. |
290 | CIVIL ARC WORKS |
291 | PAINTING WORKS |
292 | Scrapping of moss,blister etc.thoroughly from surface of walls with scrapper/ wire brush complete in all respects as per specifications and directions of Engineer-in-Charge/ Site Engineer. |
293 | Removing loose scales,blisters etc from old painted steel or wooden surface by scrapping with wire brush thoroughly and smoothening the surface to make it suit- able for receiving fresh coat of paint complete with all labour and materials as per specifications |
294 | Painting any shade as directed with best quality Synthetic Enamel /Aluminium paints of ASIAN, BERGER or other equivalent approved make and brand on steel/timber/plastic/metal including smoothening the surface by sand papering etc complete with all labour and materials complete in all respects as directed |
295 | (a) Two coats including priming coat |
296 | EARTH WORK |
297 | Surface dressing and grading of the ground including removing vegetation and Leveling the undulations up to the depth of 15 cms (cutting andfilling up to 15cm), removing the pebbles, stones, brick bats, woodenbattens/logs and tree leaves and including disposal at no extra costoutside the IOCL premises. |
298 | HORTICULTURE WORKS |
299 | Maintenance of lawn grass including watering at least thrice in a month,cutting, trimming, removing grass, vegetation including labour and all materials, tools and tackles etc. complete as directed by Engineer in Charge. |
300 | SANITARY & TOILET FITTINGS WORKS |
301 | Repairing the old urinal including removing the old one and making good same including all labour and materials complete. |
302 | Repairing the bibcock, stop cock, pillar cocks,flush cocks,push cock,ball cock etc by replacing necessary washer valve seat gland packing andany other working part etc as required complete. |
303 | Cleaning the tiles, lavatory flooring, urinals by using any of the following materials with required proportion including all labour and materials complete. |
304 | Vim powder/ cleaning powder |
305 | ISI grade black phynyle/ white |
306 | Acid/ Nepthas ball |
307 | Coir brushes/wire brushes |
308 | Finit |
309 | Washing and cleaning complete toilet block and maintaining the same in good hygienic condition by supplying and providing air fresheners such as Odonil napthaline balls, Phenole, vim powder etc. using good approved quality of washing materials including cleaning of all accessories and phenol within the bathroom.The rate is on per day basis. |
310 | Having two/ three urinals, one/ two WC,two/ three Wash basins,including floor and floor traps etc. |
311 | Having one/two urinals, one WC, one/ two Wash basins, including floor and floor traps etc. |
312 | Mopping of floors of offices ,toilets, control rooms, electrical substations etc. with soap solution or ordinary water with wet clothafter sweeping the floor with phooll broom removing cob-webs with all tools ,tackles, labour & materials etc. complete as per directions ofengineer -in-charge. |
313 | Cleaning of overhead water tanks byremoving sludge, moss by scrapping & disposing them out at the dumping place within the lead of 500 m.Tank to be bleached with chlorinated water/ bleaching powder in proportion to disinfect properly with all labour,material complete and as per direction.(Litre= per lit of tank capacity) |
314 | Repairing damaged plastered wall or flooring by rendering necessary patch work including removing the existing damaged plaster or IPS,raking out the joints of brick work, cleaning the surface and filling the depressions with reinforcement mortar & neat cement punning,levelling the surface curing etc. complete with all labour, materials &scaffolding etc.including removing the debris as directed. |
315 | Repairing and servicing the existing aluminium door or window by realigning the door, repairing, servicing, oiling, greasing etc complete and making it in perfect working condition with all labour and materialsetc, complete up to any size. |
316 | Providing & painting with acrylic distemper of make ASIAN,BERGERor NEROLAC or equivalent two coats for the old surfaces after scrapping andcleaning the existing surface and applying a coat of primer and one coat of putty where required etc. including necessary scraping ,scaffolding etc. complete. |
317 | Surface preparation ,supplying and painting two or more coats of weather proof acrylic smooth exterior emulsion paint of make ASIAN(APEX) , BERGER or NEROLAC or equivalent on exterior wallsover one coat of cement primer and wall putty where required as per specifications and of approved color and make including all scraping ,removing unwanted material and scaffolding all complete. |
318 | Painting lines,dashes,arrows,letters etc. on roads,field and like up to 10 cm in width in two coats with road marking paint,brushing including cleaning the surface of all dirt,dust and other foreign matter. |
319 | Letter writing with Synthetic Enamel Paint of approved brandand manufacture Note : Unit of measurement is considered EACH which is equal to per cm height per letter. |
320 | Supplying and spreading insecticides as per the direction. |
321 | Roger( litre= 100ml) |
322 | Malathon( litre= 100ml) |
323 | Novan( litre= 100ml) |
324 | BHC(50%) |
325 | BHC(10%) |
326 | Andrex ( litre= 100ml) |
327 | PLAIN/ REINFORCED CEMENT CONCRETE WORKS Providing & laying Plain Cement Concrete (PCC of different grades) infoundation, floor or at other places by using crushed stone aggregatesas directed where necessary and curing with water excluding cost ofcentering and shuttering. |
328 | 1:3:6 (1 cement:3 sand: 6 stone aggregate 20 mm nominal size.) |
329 | 1:2:4 (1 cement:2 sand:4 stone aggregate 20 mm nominal size.) |
330 | Providing and laying Reinforced Cement Concrete in foundation,footingetc. all work up to plinth level as directed where necessary andcuring with water. complete in all respects including the cost of all materials.(excluding cost of reinforcement,centering and shuttering and finishing) |
331 | 1:1.5:3 (1 cement:2 sand: 4 stone aggregate 20 mm nom.) in foundation and plinth excluding form work and the cost of Reinforcement bars. |
332 | 1:2:4 (1 cement:2 sand: 4 stone aggregate 20 mm nom.) in foundation and plinth excluding form work and the cost reinforcement bars. |
333 | REINFORCED CEMENT CONCRETE: CEMENT CONCRETE TMT Bars (Fe-500D grade or more) Thermo-Mechanically Treated bars of grade Fe-500 D or more |
334 | Providing brickwork with best quality locally available brick of class designation 75 in foundation and plinth with cement mortar , curing all labour and materials complete |
335 | In 1:4 cement sand mortar (1 cement : 4 medium coarse sand ) |
336 | For brick work of class designation 75 in Super Structure up to any height & at any floor including scaffolding,curing and labour and materials complete. |
337 | In 1:4 cement sand mortar (1 cement : 4 medium coarse sand ) |
338 | FLOORING |
339 | Providing brick on edge flooring with 2nd class brick in CM 1:4 ( 1 cement : 4 sand ) including preparation of base including filling the joints with cement mortar of 1:4, finishing the top surface with Plaster and neat cement punning complete in all respect |
340 | FINISHING Providing 15 mm thick cement plaster on walls or floor in cement mortar including raking out the joints over the brick work, stone masonry orconcrete surface in one or more coat as directed,curing, scaffolding,finishing smooth with cement punning etc all complete |
341 | C.M. 1:4 ( 1 cement : 4 sand) |
342 | Pipe Support & Structures Supply, fabrication and erection of all types of pipe supports of MS material like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade / trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms,crossover, cable tray supports etc. including painting suitable for highly corrosive area as per specification labor and supervision & complete work as per specifications and instruction of Engineer in charge (Bolts, nuts, washers, U - clamps etc. for supporting shall be supplied by the contractor within the rates quoted. These items will not be measured and paid separately) this work is to be complete in all respect as per scope of work. |
343 | Printing of safety posters as directed by EIC.(Monthly safety theme,MSDS,Safety Policy,BTCP,ERDMP,Safety week themes,special posters for audits etc). |
344 | Sandwich fittings boards made of Acrylic sheets |
345 | Preparation of Display Board of following size including stainless steel angles, Pipes etc. alongwith pasting of flex as per direction of EIC/site Engineer :- Size:- 8 feet x 4 feet |
346 | Preparation of Display Board of following size including stainless steel angles, Pipes etc. alongwith pasting of flex as per direction of EIC/site Engineer :- Size:- 6 feet x 4 feet |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail