|
| 1 | Renovationof Westfacing , Two Class Room Building in PUES Puduppattinam CampusINPuduppattinam Panchayat |
| 2 | Roof top repair works |
| 3 | Cleaning and removing the roof top WT floor finish damages with steel wire brush and open the joints including all labour charges ect complete |
| 4 | Pointing with CM 1:4 to full depth of tiles using with WPC including cost and conveyance etc, |
| 5 | Pointing with CM 1:4 to full depth of tiles using with WPC including cost and conveyance etc, |
| 6 | Wall crack repair works |
| 7 | Provision for repiring ceilingpatches,including cost and conveyance etc, |
| 8 | Provision for repiring wall crack ,including cost and conveyance etc, |
| 9 | Brick work in CM 1:5 Using country Bricks including cost and conveyance etc, |
| 10 | Plastering in CM 1:4 20mm tk using with WPC including cost and conveyance etc, |
| 11 | Flooring repair works |
| 12 | Provision for repairing flooring patches including cost and conveyance etc, |
| 13 | Door and Window repairworks |
| 14 | Doorrepairworks |
| 15 | Windowreplace |
| 16 | provision for Electrifician appliance inciuding cost and conveyance etc |
| 17 | 4\" LED tube fitting |
| 18 | HD PP |
| 19 | Ceilling Fan |
| 20 | Wiring SD 25 |
| 21 | RWH Structure works |
| 22 | Painting works |
| 23 | Distempering two coats over the prime coatincluding cost and conveyance etc, |
| 24 | Emulsion painting two coats over the prime coatincluding cost and conveyance etc, |
| 25 | Enamel painting two coats over the prime coatincluding cost and conveyance etc, Steel door old |
| 26 | Enamel painting two coats over the prime coatincluding cost and conveyance etc, Steel window new |
| 27 | Black boardpainting two coats over the prime coatincluding cost and conveyance etc, |
| 28 | provision for Teachar Cup board arrangements |
| 29 | Provision for Teachar Cup boarddoor and lock 2 unit |
| 30 | Provision for Students lunch BoxCup board 2 unit |
| 31 | provision for Shoe Rack |
| 32 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |