Ministry Of Road Transport And Highways has published Tender For Consultancy Services For Preparation Of Detailed Project Report And Feasibility Study For Construction Of Animal Underpasses 6 Nos On Nilajphata - Pauni- Adyal- Bhandara Road On Nh-247 As A Wildlife Mitigation Plan In Km 109.790 To Km 163.. Submission Date for this Tender is 30-11-2023. Feasibility Studies Tenders in bhandara Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Professional Staff : |
2 | Team Leader Cum Senior Highway Engineer |
3 | Senior Bridge Engineer |
4 | Highway cum Pavement Engineer |
5 | Material-cum-Geotechnical Engineer-Geologist |
6 | Senior Survey Engineer |
7 | Traffic and Safety Expert |
8 | Environmental Specialist cum Forest Expert |
9 | Quantity Surveyor/Documentation Expert |
10 | Land Acquisition Expert |
11 | Utility Expert |
12 | Sub Professional Staff : |
13 | Design Engineer |
14 | Drafts Person |
15 | Surveyor |
16 | Support Staff (To be assessed by consultant as per requirment) |
17 | Office Manager |
18 | Typist |
19 | Office Boy |
20 | Transportation : Vehicle provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. |
21 | For Conusltant: Innova or Equivalent (Not more than 2 years old) |
22 | Duty Travel to Site (Fixed Costs) : |
23 | Office Rent : (The rent cost includes maintenance, cleaning, repairs, etc. ) |
24 | Office Supplies, Utilities and Communication : |
25 | Office Supplies Drafting |
26 | Supplies Computer |
27 | Running Costs |
28 | Domestic & International Communication |
29 | Office Furniture and Equipment (Rental) : |
30 | Reports and Document Printing |
31 | Monthly Report (3 Per Month) |
32 | Inception Report & QAP |
33 | Environment and Social Impact Screening Report |
34 | Draft Feasibility Report |
35 | Final Feasibility Report |
36 | Draft Environmental Assessment report & RAP |
37 | Final Environmental Assessment report & RAP |
38 | Draft Detailed Design Report& Drawings etc. (& Draft EMP) |
39 | Draft Bidding Documents(& Draft EMP) |
40 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.(& Final EMP) |
41 | Final Bidding Documents |
42 | Survey and Investigation : |
43 | A. Topographical Survey : |
44 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer etc. |
45 | B. Investigation (Fixed Cost) |
46 | Road and Bridge Inventory |
47 | Material Survey and Investigation |
48 | Sub-grade Investigation & Geotechnical Investigation for all strutures |
49 | Traffic Survey |
50 | Socio-economic & Census Survey / Studies |
51 | C. Net Work Survey and GPR : |
52 | Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. |
53 | GPR Survey for detection of underground utilities. |
54 | Detailed Project Report preparation for Flyover in Nagpur City Portion if found feasible. |
55 | *Sub-Soil Investigation (Boring) for all structures if found feasible. a) Boring in all type of soils (other than hard rock): 500 mtr |
56 | b) Boring in Hard Rock : 100 Mtr |
57 | Cost of supply and fixing Boundary Pillars : |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail