| 1 | Supply, erection, testing of reputed make LED light 100 watts with fitting, wiring and accessories complete in respects. |
| 2 | Supplying, erection, testing and commissioning of Horizontal motor pumping set of raw water having head 12.00 m as requirements of discharge in 1500 LPM and power capacity in 10.00 BHP as ISI Marked |
| 3 | Supplying, erection, testing and commissioning of Horizontal submersible open well pumping set of raw water having head 12.00 m as requirements of discharge in 1600 LPM and power capacity in 10.00BHP as ISI Marked |
| 4 | Provision for construction of 1 No. Toilet at water works / boosting station including cost of material, labour etc.complete in all respect. |
| 5 | Provision for dismantling of RCC OHSR on RCC Shaft staging height 24 mtr. capacity 3.00 Lacs liter, with power hammer including all safety equipment and disposal of dismantled material as directed by Engineer in charge from site complete in all respect. |
| 6 | Construction of water purification plant of 1.00 MLD capacitycomprising of labour for DI pipe from existing raw aer main/pump, inlet box,inlet channel , Alum dozing, Flash mixing, Tapeard flocculator, Rectangularsetting tank, filter box, over head reservior for back wash including pump setsand and electric control panel, sluice valves, DI PIpes, Di specials , manholecovers, air scour equipment, Chemical house including chlorination equipmentand arrangeent of flow measurement and sand bed complete in all respect asper NIT. Labour rate for fixing DI, S/S class K9 ISI marked pipes including costof DI Specials/fitting, ISI marked PN 1.6 sluice valves including cost ofexacavation, laying, cutting , jointing , threading and jointing maerial inhorizontal length including connections complete in all respects. From existingraw water main pump to inlet box of filter unit to clear water tank. Note - DIpipe will be supplied by the department free of cost. (BASED ON SCADASYSTEM-1.00 MLD) |
| 7 | Operation and Maintenance of Independent Canal based water works for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT.Operation and maintenance during defect liability period after 3 month trial run period ( operation only) |
| 8 | 1st yearOperation and maintenance after defect liability period |
| 9 | 2nd yearOperation and maintenance |
| 10 | 3rd yearOperation and maintenance |
| 11 | 4th year Operation and maintenance |
| 12 | 5th yearOperation and maintenance |