| 1 | Dismantling brick work or stone work, c.c. kerb stone in lime or cement mortar and including stacking of materials as directed by Engineer-in-charge within a distance of 60 meters (200 feet). PWDSOR 692/2020-21 |
| 2 | Dismantling of grids, trusses and other steel work including stacking of dismantled materials as directed by Engineer-in-charge with a distance of 60 meters (200 feet). PWDSOR 702/2020-21 |
| 3 | Dismantling cement concrete or brick or granolithic floors including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60 meters (200 feet). PWDSOR 697/2020-21 |
| 4 | Earth work in excavation for Structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material. PWD SOR S.I.No. 251/2022-23 |
| 5 | Construction of embankment with approved material obtained from available land as permitted and approved by Engineer-in-Charge and as per Technical Specification Clause 301.3.3.4.1, with all lifts and and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification clause 301.5 including carting of earth beyond 5 Km distance including royalty of earth PWD SOR S.I.No. 253/2022-23 |
| 6 | P/L cement concrete1 :6 :12 (1 cement: 6 F sand: 12 graded brick ballast 40 mm nominal size) including supply of all materials, labour & T&P etc. required. for proper completion of work as per direction of E/I. (PWD SI No.273/ 2022-23 |
| 7 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Analysis Rate) |
| 8 | First Class brick work in 1:4 cement & and coarse sand Mortar in foundation and plinth including supply of all materials, labour and tools & plants etc required for proper completion of the work. (PWD SI No.305b/ 2022-23 |
| 9 | Providing and laying in cement concrete 4:2:1 of not less than strength of M150 (Stone ballast 20 mm. nominal size :2 approved coarse sand:1 cement) and curing complete, including cost of formwork in foundation and floors.UPPWD S.O.R. S.I. No.279(b)/2022-23 |
| 10 | P/L of PCC kerb blocks 300 mm x150 mm x 385 mm size with 1:3 Cement and c/Sand mortar including supply of all mat., Lab. And T&P etc. all complete as per direction of E/I |
| 11 | Painting or varnishing on iron works in small areas or new wood work with one coat of ready mixed priming paint & Two coats of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T & P etc. required for proper completion of work, paint to be used should confirm to the I.S.I. No. 103 1950 PWD SOR S I No 641+642/2022-23 |
| 12 | Providing and laying Rubber moulded Zig zag 80 mm thick tiles of precast compressed C.C. passing minimum 30 megapixel compressive strength. ISI Marked (gray/Red) laid in required over 40mm thick compacted bed of local sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer, filling the joints with local sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as perdirection of Engineer-in-Charge(Analysis Rate) |
| 13 | S/F of 3\"\" dia G.I. pipe with necessary G.I. fittings such as 80 mm dia Tee, Elbow,White lead, hemp, oil etc. and also including for fixing the above pipe in Ground with E/W in excavationand PCC 1 :2 : 4 (1 cement :2 C/ sand : 4 Stone ballast 20 mm nominalsize ) including Supply of all materials labour and T&P all requiered as per completion of the work all complete.(Analysis Rate) |
| 14 | R.C.C. Work with cement approved coarse sand and 2 cm. (3/4\") guage approved stone grit in the proportion of 1:1.5:3 in slab excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc. required for proper completion of the work. Binding wire cost being included in this Item.P.W.D SOR SI-284 /2022-23)+Diff, of cememt. |
| 15 | Mild steel or Iron work in plain work such as reinforced concrete or reinforced brick work (When notincluded in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured upto floor two level.UPPWD S.O.R. S.I. No.504/2022-23) |