| 1 | Rehabilitation of the cornice portionafter dismantling of the damaged cornice of Unnati Bhawan building, OWSSB, Bhubaneswar |
| 2 | Supplying and providing steel scaffolding , TPT designing, erecting safe platforms to execute the work safely and dismantlingthe same after completion of the work inclusive of labour cess,etc. all complete as per the direction of Engineer-in-charge. |
| 3 | Dismantling & removing R.C.C chajja, shelves, fins & parapet includingstacking the useful materials for re-use & removing the debris within 50 mtr lead as per the direction of Engineer-in-charge. |
| 4 | Disposal of debris within 10 km lead including conveyance of materials including loading unloading,etc. as per direction of Engineer-in-charge. |
| 5 | Supplying, fitting & placing uncoated HYSD barreinforcementcompleteincludingcost, conveyance of all materials etc all complete as per direction of Engineer-in-charge. (8 mm dia @ 150mm C/C reinforcement shall be placed in main and longitudinal layer ) |
| 6 | Rigid&smoothcentering&shuttering on three sides of cornice at 3rd floor for holding microconcrete including labour, material, etc all complete as per direction of Engineer-in-charge. |
| 7 | Drilling of 12mm dia hole from a depth of 80mm and inserting a RE Bar 8 mm dia with epoxy bonding agent/chemicals including labour, material, etc all complete as per direction of Engineer-in-charge. |
| 8 | Supply of epoxy bonding agent two parts (hardener & base) solvent free bonding agent for old and new concrete & mortar to attain excellent adhesive strength and allowing comfortable open time to work , including transportation , loading & unloading the same inclusive of royalties , labour cess, etc complete as per direction of Engineer-in-charge. Application of epoxy bonding agent before pouring microconcrete.Specific gravity: 1.01 +/- 0.02Pot life one hour at 30 degree Celsiusapplication temp 14 to 35 degree celsius |
| 9 | Providing and applyingpolymer modified micro-concrete supplied in 25 kg moisture resistant bag should possess following properties when mixed with clean water at w:p ratio 0:6, such as compressive strength (ASTM C 109)- 24MPa at 1 day, 45Mpa at 3 days, 55 MPa atdays and minimum 60MPa at 28days, Tensile strength- 3.5 Mpa @ 28 Days, Flexural Strength(BS 4551-80)- 10 Mpa at 28 Days, Young’s modulus-28 kN/mm2, Co-efficient of Thermal Expansion - 11X10-6/°C, Fresh wet density (Mixed density @27°C)- 2100 - 2200 kg/m3. Item rate is inclusive of materials all labour, tools and tackles, formwork and transportation etc. complete as per specification and as directed by Engg.-in-charge. |
| 10 | Repair, rehabilitation and re-fixing of solar panels including water proofing treatment at top floor (4th) sloped roof of Unnati Bhawan, OWSSB, Bhubaneswar after dismantling of slate tiles and concrete surface. |
| 11 | Dismantling & removing old tiled flooring including removing the base course & stacking the useful materials for use and removing the debris within 50mtr lead inclusive of labour, etc all complete as per direction of Engineer-in- charge. |
| 12 | Dismantling & removing cement concrete including stacking the useful materials for re-use and removing the debris within 50m lead inclusive of labour, etc all complete as per direction of Engineer-in- charge. |
| 13 | Cement concrite (1.1.5.3) with 12mm size crusher broken hand granite chips for RCC work including hoisting & laying etc all complete as per directin of Engineer-in-charge |
| 14 | Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in theratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surfaceto remove loose particles with wire brushes, complete in all respect as per the direction of Engineer-in-Charge. |
| 15 | Grove cutting on the screed: Labour charges to make 6 mm X 25 mm grove in five mtr distance on the new grading surface and the groves are to be filled with a poly urethene sealant of reputed make for expansion and contraction to stop the cracks on the mother concrete surface as per the direction of Engineer-In charge. |
| 16 | Solar panel fixing : Solar panels are to be shifted 2 inches from the present position to make fresh holes 12mm dia and 75 mm depth, cleaning charges of the holes and re-fixing charges of the solar panel with new nuts and bolts with chemicals/sealant of reputed make as per the direction of Engineer-In charge.Total solar panels - 368 nos X anchors 4 nos = 1472 nos) |
| 17 | Supplying and providing steel scaffolding , TPT designing, erecting safe platforms to execute the work safely and dismantlingthe same after completion of the work inclusive of labour cess,etc. all complete as per the direction of Engineer-in-charge. |
| 18 | Disposal of debris within 10 km lead including conveyance of materials including loading unloading,etc. as per direction of Engineer-in-charge. |
| 19 | Exterior painting of Unnati Bhawan building, OWSSB, Bhubaneswarincluding compound wall, basement area and other petty surfaces. |
| 20 | Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M heightetc. all complete as per direction of Engineer-in-charge. |
| 21 | Scraping old paint with scrapers, Sand papering and washing with soap water or soda including scaffolding charges upto 5M height and upto 8M height all complete as per direction of Engineer-in-charge. |
| 22 | Priming one coat with Asian Paint primer including cost of all labour, materials T & P with taxes, transportation etc all complete as per direction of Engineer-in-charge. |
| 23 | 3.03.01Ground floor |
| 24 | 3.03.02First floor |
| 25 | 3.03.03Second floor |
| 26 | 3.03.04Third floor |
| 27 | 3.03.054th floor terrace |
| 28 | Wall painting 2 coats with Weather Coat (Asian paints apex ultima with 7 years warranty) of approved shade on new work to give an even shade including cost of all labour, materials T & P with taxes, transportation etc all complete as per direction of Engineer-in-charge. |
| 29 | 3.09.01Ground floor |
| 30 | 3.09.02First floor |
| 31 | 3.09.03Second floor |
| 32 | 3.09.04Third floor |
| 33 | 3.09.054th floor terrace |
| 34 | Priming1coatwithprimer (zinc chromate of asian paint make)includingcostofalllaboursandmaterials etc all complete.(for steel works) as per direction of Engineer-in charge. |
| 35 | Painting 2 coats with asian paint plastic emulsion paint on newironwork includingcostofalllabours and materials etc all complete as per direction of Engineer-in charge. |
| 36 | Finishing wall surface of walls with Acrylic wall putty (Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T&P etc complete (cracked and damaged plaster surface of building) as per direction of Engineer-in charge. |