Water Resources Department-WRD has published Tender For Supply Of Materials And Errection For Drawal 11 K.V. O.H. Line With 3 Phase (Ap No.2004475471) Connection For Energisation Of 1 No. New Ldtw Scheme Under Godardihi Cluster Under Barjora Ccc At Mouza Godardihi, J.L. No. - 141, Plot No. -. Submission Date for this Tender is 01-12-2023. Electrification Work Tenders in barjora West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | PCC POLE8 MTR |
2 | MS CHANNEL 75X40X6 |
3 | MS ANGLE 65X65X6 |
4 | MS ANGLE 50X50X6 |
5 | MS FLAT 65X6 |
6 | GI HT STAY SET |
7 | GI EARTH SPIKE |
8 | NEW DIST. TRANSFORMER 25 KVA |
9 | ACSR 50 sqmm |
10 | ACSR 30 sqmm |
11 | GI STAY WIRE 7/10 SWG |
12 | GI WIRE(6 SWG) |
13 | GI WIRE(8 SWG) |
14 | PVC CABLE 25 SQ MM-4 core |
15 | Cut Out |
16 | PIN INSULATOR 11KV(Polymer) |
17 | Disc Insulator 11 KV Polymer |
18 | Hardware fitting 30/50 sq mm |
19 | GUY INSULATOR |
20 | SHACKLE INSULATOR 75x90 mm |
21 | 11 KV V bracket 8 mtr |
22 | TOP ADOPTER 11 KV |
23 | Lighting Arrestor |
24 | GI TURN BUCKLE |
25 | TPGO Isolator |
26 | DI CLAMP |
27 | Sundries @5% of Item no-1 to 26 |
28 | Check and final Survey of 11 KV OH line |
29 | Erection of SP 8 mtr comp with all fittings w/o Insulator (Painted) |
30 | Erection of3 mtr long on pcc pole with painted |
31 | Erection of DP 8 mtr comp with all fittings w/o Insulator (Painted) |
32 | Erection of HT Stay set complete |
33 | Erection of Earthing Complete |
34 | Fixing of 11 KV Pin Insulator |
35 | Fixing of 11 KV Disc Insulator |
36 | Fixing of Cradle guard bracket Single pole |
37 | Lead wire above 30 mtr upto 60 mtr (2 wire) |
38 | Making & Fixing of Cross lacing |
39 | Fixing of Solid T-off Bracket on PCC Pole- Single |
40 | Stringing & sagging with 50 sqmm ACSR |
41 | Erection of S/Stn Structure (DP) on 8 mtr PCC Pole comp with all fittings |
42 | Erection of Distribution Transformer comp with all fittings 25 KVA |
43 | Fixing of 11 KV Pin Insulator |
44 | Fixing of 11 KV Disc Insulator |
45 | Erection of HT Stay set complete |
46 | Erection of Earthing Complete |
47 | Supply & Earthing of LA and other Accessories is to be done by driving three numbers of GI spike (1830x20) mm into earth & connecting them with GI wire 4 mm (8SWG) |
48 | Fixing of Lighting Arrester |
49 | Fixing of TPGO Isolator set on sub-station |
50 | Supply & Earthing of neutral point of DTR by using 3 mtr 50 mm dia of medium duty (ISI make) GI pipe with perforation of 12 mm dia each at 300 mm intervals spirally to be driven to each so that the top of the above GI pipe to be driven 0.5 mtr below ground level. The neutral point of DTR and the above GI pipe is to be linked up by GI srip 50x6 mm. The said strip is to be connected by using galvanised bolt, double nuts, double washer at pipe end and at DTR neutral stud point only with galvanised nuts and washers at both side of GI strip. |
51 | Service Connection 3 Phase |
52 | Add GST @ 18 % Value of Item No 28 to 51 |
53 | Add L. W. CESS @ 1 % Value of Item No 1 to 52 |