Annual Maintenance Of Water Supply Scheme In Cue-I Hisar ( 2023-24 ) . `Removal Of Weeds, Cleaning Of Silt From Clear Water Tanks, Surface Dressing By Jungle Clearance And Providing And Fixing Of Kerbs And Channels Along Road At Boosting Stations, Sec, Hisar-Haryana
TDR : 40569395
Tender Notice
BOQ
Expired
Hisar
Haryana
Annual Maintenance Of Water Supply Scheme In Cue-I Hisar ( 2023-24 ) . `Removal Of Weeds, Cleaning Of Silt From Clear Water Tanks, Surface Dressing By Jungle Clearance And Providing And Fixing Of Kerbs And Channels Along Road At Boosting Stations, Sec
AANNUAL MAINTENANCE OF WATER SUPPLY SCHEME IN CUE-I HISAR (2023-24). `REMOVAL OF WEEDS, CLEANING OF SILT FROM CLEAR WATER TANKS, SURFACE DRESSING BY JUNGLE CLEARANCE AND PROVIDING AND FIXING OF KERBS AND CHANNELS ALONG ROAD AT BOOSTING STATIONS, SECTOR-15A, CUE-I, POLICE LINE AREA HISAR AND ALL OTHER WORKS CONTINGENT THERETO`.A/C Rs. 1.84 Lacs
Sl. No.
Item Description
1
[30.92]Cleaning of under ground sump, Over Head R.C.C. Tank ( independent staging) including disposal of silt and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consistfollowing operations:- (i)Tank shall be emptied of water by pumping and bottom shall be cleaned of silt and otherdeposits. (ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge.
2
[34.2.1]Cast in Situ Cement Concrete M 20 Kerb with ChannelConstruction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 1. Using Concrete Mixer
3
[4.4.1]Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 1. All kinds of soil
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.