Bids Are Invited For Supply Of 420Kv, 3150A, 50Ka Isolator 3 Phase Double Break With One Earth Switch Including Support Insulators, Terminal Connectors And Support Structure Suitable For Existing Foundation , Supply Of 420Kv, 3150A, 50Ka Isolator 3 Phase Double Break With Two Earth Switch Including Support Insulators, Terminal Connectors And Support Structure Suitable For Existing Foundation , Supply Of 245Kv, 1600A, 40Ka Isolator 3 Phase Double Break With Two Earth Switch Including Support Insulators, Terminal Connectors And Support Structure Suitable For Existing Foundation , Supply Of 245Kv, 1600A, 40Ka Isolator 3 Phase Double Break With One Earth Switch Including Support Insulators, Terminal Connectors And Support Structure Suitable For Existing Foundation , Supply Of 40Mm Ms Rod, Mild Steel Rod As Per Is 2062 Sae1018 , Retrofitting, Installation And Commissioing Of 420Kv, 3150A, 50Ka Isolator 3 Phase Double Break With One Earth Switch As Per The Powergrid Scope Of Work Using Existing Civil Foundations , Retrofitting, Installation And Commissioing Of 420Kv, 3150A, 50Ka Isolator 3 Phase Double Break With Two Earth Switch As Per The Powergrid Scope Of Work Using Existing Civil Foundations , Retrofitting, Installation And Commissioing Of 245Kv, 1600A, 40Ka Isolator 3 Phase Double Break With Two Earth Switch As Per The Powergrid Scope Of Work Using Existing Civil Foundations , Retrofitting, Installation And Commissioing Of 245Kv, 1600A, 40Ka Isolator 3 Phase Double Break With One Earth Switch As Per The Powergrid Scope Of Work Using Existing Civil Foundations , Fabrication Of Auxilary Earth Mat As Per The Powergrid Drawing And Scope Of Work. Connecting Auxilary Earthmat To Isolator Mom Boxes And Main Earthgrid As Per Powergrid Drawing , Removing, Cleaning And Washing Of Existing Stones And Respreading Of Stones In Switchyard Excluding Pcc Inclduing Antiweed Treatment , Earthwork In Excavation By Mechanical Means Hydraulic Excavator Or Manual As Mentioned In Powergrid Scope Of Work , Filling Available Excavated Earth Excluding Earthwork In Trenches , Plinth, Sides Of Foundation Etc As Mentioned In Powergrid Scope Of Work Total Quantity : 280464