Irrigation Department has published Tender For Construction Of R.C.C. Lining Work On U/S And D/S Of Birma Aqueduct Of Arjun Feeder Canal (Lot-2). Submission Date for this Tender is 17-11-2023. Canal Construction Tenders in mahoba Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (Rates shall be quoted excluding GST) |
2 | Earth work in Making sub grade correcting section from 1:1.4 to 1:1.5 in side slopes etc. including soil mixed with Kanker, boulder etc., compaction and dressing, all complete of work. |
3 | Preparation of sub grade for lining work including all cost of material, labour, T&P etc. complete of work. |
4 | Providing and Laying cement concrete M20 grade cast-in-situ sleeper 200x200mm size including cost of all material, labour, T&P etc. complete of work. |
5 | Centering and Shuttering for concrete work including all cost of material,labour, T&P etc. complete of work. |
6 | Laying steel reinforcement including cutting, bending, binding in position including material, binding wire, labour, T&P etc. required for proper completion of work. |
7 | Providing and Laying 200 thick coarse sand in drain and in layers as per drawing including cost of all material, labour charges and T&P etc. complete of work. |
8 | Laying 100mm thick R.C.C. M20 lining in bed and slopes with copping on berm including cost of all material, labour, T&P etc. required for proper completion of work. |
9 | Supplying and Laying P.V.C. seal 150mm wide and 6mm thick at joints on sleeper including cost of all material, labour, T&P etc. required for proper completion of work. |
10 | Making construction joint painting with primer and filling with sealing compound including cost of all material, labour, T&P etc. requied for proper completion of work. |
11 | Painting on top of sleeper with bitumen including cost of all material, fuel for heating, labour, T&P etc. required for proper completion of work. |
12 | Providing and Fixing 50mm dia. PVC pipe in sleeper at 5m. c/c in panels including cost of all material, labour, T&P etc. requied for proper completion of work. |
13 | Providing and Laying 200 micron thick L.D.P.E. film to cover the surface area under the lining including cost of all material, labour, T&P etc. requied for proper completion of work. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail