Design, Engineering, Supply, Installation And Commissioning Of 400 Kw Solar Power Plant With Battery Energy Storage System With 8 Years O&M At Village Dharwas, Pangi Valley In District Chamba
Tender Overview
Project Description
Design, Engineering, Supply, Installation And Commissioning Of 400 Kw Solar Power Plant With Battery Energy Storage System With 8 Years O&M At Village Dharwas, Pangi Valley In District Chamba
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 18-Nov-2023 | corrigendum | Date | 12-Dec-2023 |
| 2 | 22-Nov-2023 | Corrigendum | Technical Bid | 12-Dec-2023 |
| 3 | 05-Dec-2023 | corrigendum | Technical Bid | 12-Dec-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Part A DESIGN, ENGINEERING, SUPPLY, INSTALLATION AND COMMISSIONING OF 400 KW SOLAR POWER PLANT WITH BATTERY ENERGY STORAGE SYSTEM WITH 8 YEARS O&M AT VILLAGE Dharwas, Pangi VALLEY IN DISTRICT Chamba Rates for the Solar Part (Must be quoted FOR site, freight, insurance, including loading, unloading, storage, handling at site) |
| 2 | Supply of SPV Modules as specified in the Tender documents |
| 3 | Supply of Inverters as specified in the Tender documents |
| 4 | Supply of Inverter transformer as specified in the Tender documents |
| 5 | Supply of Panels & Switchgears as specified in the Tender documents |
| 6 | Supply of Module mounting structure as specified in the Tender documents |
| 7 | Spare Modules ( 0.50% of total supply of solar modules) |
| 8 | Mandatory spares excluding modules |
| 9 | Cables ( all DC, LT & HT) |
| 10 | Supply of Balance of Systems for the Solar Part for commissioning of the Plant as specified in tender documents |
| 11 | Part BRates for the BESS Part (Must be quoted FOR site, freight, insurance, including loading, unloading, storage, handling at site) |
| 12 | Supply of Battery alongwith the Battery Management System (BMS) as specified in the Tender documents |
| 13 | Supply of Bi-directional inverter (PCS) as specified in the Tender documents |
| 14 | Supply of Inverter transformer as specified in the Tender documents |
| 15 | Supply of Step-up Transformer as specified in the Tender documents |
| 16 | Supply of MV switchgear/RMU as specified in the Tender documents |
| 17 | Supply of Balance of Systems including all the equipments, spares, accessories, earthing, safety & fire fighting system etc excluding BESS part supply above and any other suppliesas specified in tender documents |
| 18 | Part C Rates for installation of Solar Part, Battery Part and other allied activities for successful completion of the400 KW Solar Power Plant With Battery Energy Storage System |
| 19 | Design, Engineering, Supply, Installation & Commissioning and performance testing of the equipments supplied and other services specified in the tender document. |
| 20 | Civil and allied works for construction of Module mounting structure, foundations etc for all the equipment supplied |
| 21 | Freight, Insurance, Loading unloading, storage at site, handling at site for allied works |
| 22 | Part D RATES FOR OPERATION & MAINTENENACE FOR EIGHT YEARS |
| 23 | Operation and Maintenance of the Solar PV Project with BESS for first year |
| 24 | Operation and Maintenance of the Solar PV Project with BESS for second year |
| 25 | Operation and Maintenance of the Solar PV Project with BESS for third year |
| 26 | Operation and Maintenance of the Solar PV Project with BESS for fourth year |
| 27 | Operation and Maintenance of the Solar PV Project with BESS for fifthyear |
| 28 | Operation and Maintenance of the Solar PV Project with BESS for sixthyear |
| 29 | Operation and Maintenance of the Solar PV Project with BESS for seventhyear |
| 30 | Operation and Maintenance of the Solar PV Project with BESS for eigthyear |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender