}

Tender For 2000142137-Mod1-4 Lr-Kr Pump Valve, Bellow, Nrv Overhauling, Hazira-Gujarat

Arcelor Mittal Nippon Steel India Limited has published Tender For 2000142137-Mod1-4 Lr-Kr Pump Valve, Bellow, Nrv Overhauling. Submission Date for this Tender is 11-11-2023. Soldering and Welding Machinery Tenders in Hazira Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

40523071
Tender For 2000142137-Mod1-4 Lr-Kr Pump Valve, Bellow, Nrv Overhauling
Tender
Indian
Gujarat
Hazira
11-11-2023

Tender Details

Tender For 2000142137-Mod1-4 Lr-Kr Pump Valve, Bellow, Nrv Overhauling 1 2000142137 10 10 10 LR-KR PUMP VALVE, BELLOW, NRV OVERHAULIN 15 NO Email : niraj.patel1@amns.in Contact : Name : Niraj Patel Item Details : SOW FOR PUMP HOUSE PUMPS VALVES REFURBISHING Quantum of the job: Items Size Qty. (Nos) Gate valve 6 1 Butterfly Valve 14 02nos 16 18 24 28 NRV ( Single Flap Type) 14 01no 18 24 Bellow 10 02 nos 12 14 Height of the job: Ground Floor CONTRACTOR’S SCOPE: 1. As per instruction of AMNS engineer pumps jobs to be started after getting the work permit. 2. Suction valve and bellow, discharge valve, Non return valve, and bellows removal, care to be taken for the valves and Bellows while removal that no damage of the spares. 3. After cleaning valves, suction and discharge spools / reducers, removal of scaling operation to be checked out side only, if operation is ok, in-charge AMNS will give the clearance for fixing back. If operation is not smooth valve / NRV to be replaced. 4. Bellows inspection by AMNS engineer and clearance for re-fixing, if damaged replacement to be done. 5. after re fixing, valves operation to be checked by AMNS engineer and final tightening clearance will be given, if operation is not proper valve to be removed and proper position of the valve to be done and again operation to be checked and confirmed by AMNS engineer. 6. As per clearance or instruction from AMNS engineer. All valves, bellows to be boxed up and final tightening to be done. 7. Any damage of spools / reducers to be fabricated and replaced as per AMNS Engineer instruction. 8. After all pump house related jobs over leak test to be done, if any leak the contractors have to do as per call. 9. Tools, tackles, consumables and scaffolding are in Contractor scope. GENERAL SCOPE: • All tools, tackles, consumables like cutting gas, welding electrod • Cutting set, welding machines is in the scope of contractor, cutting set should be with back fire arrester and welding machine should be with 4 core power cable to be certified by department electrical engineer. • Scaffolding require in the job is in the scope of contractor. • All the scrape to be shifted to scrape yard and balance unused items to be shifted to workshop as per the in charge instruction hydra to be arranged to shift the scrape and new pipes from the stores. • Contractor to arrange competent man power only including supervisor for carrying out the job. • Agency has to comply all safety and security rules as and when persist. • Agency has to arrange valid gate pass through SCRUM only. AMNS’S SCOPE: • Consumables like bolts <(>&<)> nuts, packing, RTV sealant, gaskets sheets, • Special welding electrodes will be the free issue from the AMNS. • Air, power, water will be made available at source by AMNS. For AMNS steel - HBI plant Movement of Manpower / Associates at our Hazira Site. 1. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 2. Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate has to undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. Item Note : 2 2000142137 20 20 10 LR-KR PUMP VALVE, BELLOW, NRV OVERHAULIN 15 NO Email : niraj.patel1@amns.in Contact : Name : Niraj Patel Item Details : SOW FOR PUMP HOUSE PUMPS VALVES REFURBISHING Quantum of the job: Items Size Qty. (Nos) Gate valve 6 1 Butterfly Valve 14 02nos 16 18 24 28 NRV ( Single Flap Type) 14 01no 18 24 Bellow 10 02 nos 12 14 Height of the job: Ground Floor CONTRACTOR’S SCOPE 1. As per instruction of AMNS engineer pumps jobs to be started after getting the work permit. 2. Suction valve and bellow, discharge valve, Non return valve, and bellows removal, care to be taken for the valves and Bellows while removal that no damage of the spares. 3. After cleaning valves, suction and discharge spools / reducers, removal of scaling operation to be checked out side only, if operation is ok, in-charge AMNS will give the clearance for fixing back. If operation is not smooth valve / NRV to be replaced. 4. Bellows inspection by AMNS engineer and clearance for re-fixing, if damaged replacement to be done. 5. after re fixing, valves operation to be checked by AMNS engineer and final tightening clearance will be given, if operation is not proper valve to be removed and proper position of the valve to be done and again operation to be checked and confirmed by AMNS engineer. 6. As per clearance or instruction from AMNS engineer. All valves, bellows to be boxed up and final tightening to be done. 7. Any damage of spools / reducers to be fabricated and replaced as per AMNS Engineer instruction. 8. After all pump house related jobs over leak test to be done, if any leak the contractors have to do as per call. 9. Tools, tackles, consumables and scaffolding are in Contractor scope. GENERAL SCOPE: • All tools, tackles, consumables like cutting gas, welding electrodes including DP test kit if required is in the scope of the contractor. • Cutting set, welding machines is in the scope of contractor, cutting set should be with back fire arrester and welding machine should be with 4 core power cable to be certified by department electrical engineer. • Scaffolding require in the job is in the scope of contractor. • All the scrape to be shifted to scrape yard and balance unused items to be shifted to workshop as per the in charge instruction hydra to be arranged to shift the scrape and new pipes from the stores. • Contractor to arrange competent man power only including supervisor for carrying out the job. • Agency has to comply all safety and security rules as and when persist. • Agency has to arrange valid gate pass through SCRUM only. AMNS’S SCOPE: • Consumables like bolts <(>&<)> nuts, packing, RTV sealant, gaskets sheets, • Special welding electrodes will be the free issue from the AMNS. • Air, power, water will be made available at source by AMNS. For AMNS steel - HBI plant Movement of Manpower / Associates at our Hazira Site. 1. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 2. Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate has to undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. 3 2000142137 30 30 10 LR-KR PUMP VALVE, BELLOW, NRV OVERHAULIN 15 NO Email : niraj.patel1@amns.in Contact : Name : Niraj Patel Item Details : SOW FOR PUMP HOUSE PUMPS VALVES REFURBISHING Quantum of the job: Items Size Qty. (Nos) Gate valve 6 1 Butterfly Valve 14 02nos 16 18 24 28 NRV ( Single Flap Type) 14 01no 18 24 Bellow 10 02 nos 12 14 Height of the job: Ground Floor CONTRACTOR’S SCOPE: 1. As per instruction of AMNS engineer pumps jobs to be started after getting the work permit. 2. Suction valve and bellow, discharge valve, Non return valve, and bellows removal, care to be taken for the valves and Bellows while removal that no damage of the spares. 3. After cleaning valves, suction and discharge spools / reducers, removal of scaling operation to be checked out side only, if operation is ok, in-charge AMNS will give the clearance for fixing back. If operation is not smooth valve / NRV to be replaced. 4. Bellows inspection by AMNS engineer and clearance for re-fixing, if damaged replacement to be done. 5. after re fixing, valves operation to be checked by AMNS engineer and final tightening clearance will be given, if operation is not proper valve to be removed and proper position of the valve to be done and again operation to be checked and confirmed by AMNS engineer. 6. As per clearance or instruction from AMNS engineer. All valves, bellows to be boxed up and final tightening to be done. 7. Any damage of spools / reducers to be fabricated and replaced as per AMNS Engineer instruction. 8. After all pump house related jobs over leak test to be done, if any leak the contractors have to do as per call. 9. Tools, tackles, consumables and scaffolding are in Contractor scope. GENERAL SCOPE: • All tools, tackles, consumables like cutting gas, welding electrodes including DP test kit if required is in the scope of the contractor. • Cutting set, welding machines is in the scope of contractor, cutting set should be with back fire arrester and welding machine should be with 4 core power cable to be certified by department electrical engineer. • Scaffolding require in the job is in the scope of contractor. • All the scrape to be shifted to scrape yard and balance unused items to be shifted to workshop as per the in charge instruction hydra to be arranged to shift the scrape and new pipes from the stores. • Contractor to arrange competent man power only including supervisor for carrying out the job. • Agency has to comply all safety and security rules as and when persist. • Agency has to arrange valid gate pass through SCRUM only. AMNS’S SCOPE: • Consumables like bolts <(>&<)> nuts, packing, RTV sealant, gaskets sheets, • Special welding electrodes will be the free issue from the AMNS. • Air, power, water will be made available at source by AMNS. For AMNS steel - HBI plant Movement of Manpower / Associates at our Hazira Site. 1. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 2. Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate has to undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. Item Note : 4 2000142137 40 40 10 LR-KR PUMP VALVE, BELLOW, NRV OVERHAULIN 15 NO Email : niraj.patel1@amns.in Contact : Name : Niraj Patel Item Details : SOW FOR PUMP HOUSE PUMPS VALVES REFURBISHING Quantum of the job: Items Size Qty. (Nos) Gate valve 6 1 Butterfly Valve 14 02nos 16 18 24 28 NRV ( Single Flap Type) 14 01no 18 24 Bellow 10 02 nos 12 14 Height of the job: Ground Floor CONTRACTOR’S SCOPE: 1. As per instruction of AMNS engineer pumps jobs to be started after getting the work permit. 2. Suction valve and bellow, discharge valve, Non return valve, and bellows removal, care to be taken for the valves and Bellows while removal that no damage of the spares. 3. After cleaning valves, suction and discharge spools / reducers, removal of scaling operation to be checked out side only, if operation is ok, in-charge AMNS will give the clearance for fixing back. If operation is not smooth valve / NRV to be replaced. 4. Bellows inspection by AMNS engineer and clearance for re-fixing, if damaged replacement to be done. 5. after re fixing, valves operation to be checked by AMNS engineer and final tightening clearance will be given, if operation is not proper valve to be removed and proper position of the valve to be done and again operation to be checked and confirmed by AMNS engineer. 6. As per clearance or instruction from AMNS engineer. All valves, bellows to be boxed up and final tightening to be done. 7. Any damage of spools / reducers to be fabricated and replaced as per AMNS Engineer instruction. 8. After all pump house related jobs over leak test to be done, if any leak the contractors have to do as per call. 9. Tools, tackles, consumables and scaffolding are in Contractor scope. GENERAL SCOPE: • All tools, tackles, consumables like cutting gas, welding electrodes including DP test kit if required is in the scope of the contractor. • Cutting set, welding machines is in the scope of contractor, cutting set should be with back fire arrester and welding machine should be with 4 core power cable to be certified by department electrical engineer. • Scaffolding require in the job is in the scope of contractor. • All the scrape to be shifted to scrape yard and balance unused items to be shifted to workshop as per the in charge instruction hydra to be arranged to shift the scrape and new pipes from the stores. • Contractor to arrange competent man power only including supervisor for carrying out the job. • Agency has to comply all safety and security rules as and when persist. • Agency has to arrange valid gate pass through SCRUM only. AMNS’S SCOPE: • Consumables like bolts <(>&<)> nuts, packing, RTV sealant, gaskets sheets, • Special welding electrodes will be the free issue from the AMNS. • Air, power, water will be made available at source by AMNS. For AMNS steel - HBI plant Movement of Manpower / Associates at our Hazira Site. 1. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 2. Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate has to undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. Item Note :

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail