| 1 | SCHEDULE‘A’ PART-I (AMC-AC) |
| 2 | Annual maintenance Contract for split/ Window Air conditioner installed at HQ 28 Sector Assam Rifles Kakching alongwith its connected works with qtrly visting with following works -(a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the AC shall be maintained.(b) Quarterly Preventive maintainance shall include at least the fwg services: (c) Replacement of filter if found damaged./ unusable.(d) Check selector switch , thermostat, relays, remote controle etc(e) Checking motor bushing (f) Cleaning of blower and condenser fan.(g) cleaning the evaporatorCondensor coils (h) Checking and tightening of nuts & bolts (j) Oiling the motors (k) Checking of the drivemotors and fans (l) Overhauling lf the AC with chemical washing process (m) Checking cooling efficiency (n) Checking firmness of the suppportng arraneent for the compressor, blower motor, air conditioners casing and fixing of the air conditioners etc. (o) Replacement of any component of air conditioners (Outdoor and indoor uits, inlet and outlet pipelines, electrical connections etc) found defective after the abvoe checks and tests.(p) Charging of refgrigerant gas during the perid of contract if need arises a maintenance schedule mutually agreed upon will be prepared before commencement of the AMC Any delay beyond the agreed schedule will attract penaly of 1%of Rate cntract value per day of delay or part there of subject to maximum deduction of 10% of the Rate contract value. |
| 3 | The spares replaced under comprehensive maintenance shall be measured and paidOEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Compressor (b) Running Capacitor (c) Fan Capacitor (d) Fan Motor (e) Grill (F) Chasis (G) Remote (h) Brass Pipe (j) PCB Board (k) Thermostate (l) Drain Pipe (m) Pipe insulation (m) Power Cord (m) Air Filer (n) Wall Bracket (o) Condensor of out door Unit. |
| 4 | Installation of New split Air conditinerstand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation |
| 5 | Dismantle of AC stand from wall, Dismantly/FixedFront air grill, disconnect electricity supply to Air conditioner and re-installtion split Air conditinerstand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation |
| 6 | Re-filling the AC Gas, first check the compressor, connect valve on the compressor process tube, fil Gas according to air conditioner check leakage after refill gas |
| 7 | SCHEDULE‘A’ PART-II (AMC-RO) |
| 8 | Annual maintenance Contract for RO installed at HQ 28 Sector Assam Rifles Kakching alongwith its connected works with qtrly visting with following works -(a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the RO shall be maintained.(b) Replacement of Filter Bag like paper filter bag & etc. (c) Replacement of RO Candle(d) Back wash & forward wash existing RO mainbran with chemicals(e) Replacement of RO Fitting as per requirements(f) Replacement of switch, socket & wiring as per requirements |
| 9 | The spares replaced under comprehensive maintenance shall be measured and paidOEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Compressor (b) Existing RO Mainbran (c) Existing RO Motor (d) Existing RO Fan Motor (e) Grill (f) Chassis(g) PCB Board |
| 10 | Installation of New RO with complete assessors with CPVC 50 mtr assorted size |
| 11 | Refitting of exiting RO with complete assessors with CPVC 50 mtr assorted size |
| 12 | SCHEDULE‘A’ PART-III (AMC-Geyser) |
| 13 | Annual maintenance Contract for Geyserinstalled at HQ 28 Sector Assam Rifles Kakching alongwith its connected works with qtrly visting with following works -(a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the Geyser shall be maintained.(b) Replacement of heating Element . (c) Replacement of indicator.(d) Replacement of Geyser fitting as per requirements.(e) Replacement of switch, socket & wiring as per requirements. |
| 14 | The spares replaced under comprehensive maintenance shall be measured and paidOEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Geyser with existing |
| 15 | Installation of New Geyser with complete assessors (SS Combine board 15 Ampr/5 Ampr , Connection pipe & plug 15 ampr/5 ampr with hot and cold pipe 6 mtr assorted size, chipping and plaster/ putty work with existing paint |
| 16 | Refittingof exiting geysers with complete assessors with hot and cold pipe 10 mtr assorted size (SS Combine board 15 Ampr/5 Ampr , Connection pipe & plug 15 ampr/5 ampr with hot and cold pipe 6 mtr assorted size, chipping and plaster/ putty work with existing paint |
| 17 | SCHEDULE‘A’ PART-IV (AMC-Desert Coolers) |
| 18 | Annual maintenance Contract for Desert Coolers installed at HQ 28 Sector Assam Rifles Kakching alongwith its connected works with qtrly visting with following works -(a) Every Machine shall be serviced at least once every quarter. A record of such services duly acknowledged by the person using the machine or in his absence, in charge location of the Geyser shall be maintained.(b) Replacement of existing fan . (c) Replacement of indicator.(d) Replacement of Desert Coolers fitting as per requirements. (e) Replacement ofdrain pipe switch, socket & wiring as per requirements. (f)Replacement /repair of fan motor/ pump with connection pipe |
| 19 | The spares replaced under comprehensive maintenance shall be measured and paidOEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Desert Coolers body with existing fitting |
| 20 | Installation of New Desert Coolerswith complete assessors (SS Combine board 15 Ampr/5 Ampr , Connection pipe & plug 15 ampr/5 ampr with drain pipe 6 mtr assorted size, chipping and plaster/ putty work with existing paint |
| 21 | Refitting of exiting Desert Coolerswith complete assessors with hot and cold pipe 10 mtr assorted size (SS Combine board 15 Ampr/5 Ampr , Connection pipe & plug 15 ampr/5 ampr with drainpipe 6 mtr assorted size, chipping and plaster/ putty work with existing paint |