West Bengal Power Development Corporation Limited has published Tender For Ahpmm Area Overhauling Job During U 5 Overhauling Period. Submission Date for this Tender is 02-12-2023. Rough Finishing Tools Tenders in hooghly West Bengal. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 18-Nov-2023 | Date extension corrigendum | Date | 25-11-2023 |
2 | 25-Nov-2023 | Second time date extension | Date | 02-12-2023 |
Sl. No. | Item Description |
1 | Overhauling Job of U#5 |
2 | Bottom Ash Hopper jet pump nozzle-Checking & servicing/replacement |
3 | Feed Gate servicing with Feed Sump new making & refractory cement lapping with clinker wire mesh & anker in |
4 | Bottom ash hopper refractory (excluding materials)replacement. |
5 | Bottom ash hopper JETTING NOZZLE checking/servicing/replacement |
6 | Clinker Grinder with gear box overhauling |
7 | Coarse Ash Hopper O/L valve Replacement |
8 | DOME VALVE (100/150/200/300 NB)checking/servicing/replacement |
9 | GLOBE/GATE VALVE 150/200 NB replacement |
10 | Knife gate valve 300 NB servicing/replacement |
11 | Material Handling Valve servicing /replacement |
12 | Silo Target box checking & need to base servicing work with ss liner plate |
13 | 200 NB FLY ASH LINE CHECKING & NEED BASED REPLACEMENT & DE-METERING |
14 | 200 NB CI BENDS / Y PIECE CHECKING AND REPLACEMENT (BEND-90 & 45 DEGREE) |
15 | ESP PAD CHANGE,SURGE HOPPER PAD CHANGE |
16 | TOTAL FLY ASH SYSTEM LINE (200 NB) GASKET REPLACEMENT (HOPPER TO ISH, HOPPER TO AIR SEPERATOR TANK). |
17 | CONVEYING COMPRESSOR TOTAL OVERHAULING JOB |
18 | ESP ,APH ALL PAD & VALVE TOOL PICE DISMANTLING WITH PLASTIC COVERING & ASSEMBLING JOB FOR ESP WASHING PURPOSE |
19 | SILO DOME VALVE 150 NB CHECKING |
20 | 300/350 NB SLURRY ASH LINE CHECKING, ROTATION & NEED BASED REPLACEMENT & DE-METERING |
21 | PD pump T Fabrication |
22 | BAG FILTER REPLACED (144 no.) AT SILO-2 |
23 | Clinker Grinder bearing supprot machining |
24 | ASH SLURRY LINE PIPE LINE NEW LEG SUPORT FEBRICATION WITH U CLAMPING PREPARATION |
25 | COOLING TOWER PVC FILLS REPLACEMENT |
26 | New ERW pipe installation with flange fabrication work. |
27 | Lock hopper & surge hopper vent line bend fabrication |
28 | Hydro-vector body repairing and fabrication |
29 | ESP Fluidised Air Line NRV checking |
30 | Coarse Ash Hopper body repairing & refractory lapping (excluding materials) |
31 | ESP Fluidised Air Line checking (insullation with material ) from blower common header to ESP -A pass Header & individiual hopper to be check |
32 | Bottom Ash Hopper all column support repairing , strengthening with proper painting(including tough seal). |
33 | Coarse Ash Hopper inspection door fabrication |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail