Department Of Industries And Commerce has published Engagement Of Engineering, Procurement& Construction Management Consultant (Epcm) For Implementation Of Cgd Project In Ga 11.03.In The District Ofdarrang, Udalguri, Sonitpur, Bishwanath, Lakhimpur And Dhemajiin Assam. Submission Date for this Tender is 05-12-2023. Consultancy Service Tenders in guwahati Assam. Bidders can get complete Tender details and download the document.




Tender Notice

40497990
Corrigendum : Engagement Of Engineering, Procurement& Construction Management Consultant (Epcm) For Implementation Of Cgd Project In Ga 11.03.In The District Ofdarrang, Udalguri, Sonitpur, Bishwanath, Lakhimpur And Dhemajiin Assam
Open Tender
Indian
Assam
guwahati
05-12-2023

Tender Details

Engagement Of Engineering, Procurement& Construction Management Consultant ( Epcm ) For Implementation Of Cgd Project In Ga 11.03.In The District Ofdarrang, Udalguri, Sonitpur, Bishwanath, Lakhimpur And Dhemajiin Assam

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 10-Nov-2023 Date corrigendum Date 28-11-2023
2 16-Nov-2023 BOQ corrigendum BOQ 28-11-2023
3 23-Nov-2023 Date Extension Date 05-12-2023
4 01-Dec-2023 Technical Bid Corrigendum Technical Bid 05-12-2023

Key Value

Document Fees
INR 16000 /-
EMD
INR 1600000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Engagement of Engineering, Procurement& Construction Management Consultant (EPCM) for implementation of CGD Project in GA 11.03.in the district ofDarrang, Udalguri, Sonitpur, Bishwanath, Lakhimpur and Dhemajiin Assam
Sl. No. Item Description
1Development of Steel Pipeline Network
2Development of CGD Steel Network: ToConnect all demand centres with CGS through steel pipes, design, engineering and hydraulics for development of steel network for CGD including underground pipeline, above ground piping, city gate stations, SV stations, CP systems, branch/spur pipeline connections to CGS/ DRS/ MRS/ CNG stations/ consumer terminals including instrumentation/ electrical/ civil works for completion of the steel pipeline network in all respect to achieve 25 years demand potential of the GA.
3Completion of Detailed Engineering/Drawing
4Preparation of Detailed Engineering Drawings for Steel Pipeline Network (Schematic Drawings of Pipeline Route, SV Stations)
5Development of CGD MDPE & GI Network
6Evaluation of Route Survey, Design & Engineering, Planning and Scheduling etc. for Development of MDPE Network, Last Mile Connectivity (LMC) & GI n/w to supply PNG to Domestic/ Commercial / Industrial consumers. Job includes sizing, interconnection among DRS, MRS, Regulators, Meters, valves, as per PNGRB regulations/ guidelines. Site Survey, Design & Engineering, Planning and Scheduling etc. of GI pipeline network till last mile connectivity of all type of PNG customers.
7Design of DRS/ MRS/ DCU
8Preliminary Design
9Design, Preliminary Engineering, Drawing, BOM, Documentation, Specifications, Scheduling/Planning etc for DRS/ MRS/ DCU etc. and its allied facilities. It includes Site Visit, preparation of General Arrangement for DRS/MRS/DCU Layout for seeking permissions from Building Planner, District Magistrate/District Collector, PESO and any other statutory body as applicable etc and also for Tendering purposes.
10Detail Engineering
11Detail Engineering from the approved preliminary Engineering for DRS/ MRS/ DCU along with sizing and including dispensing from DRS or MRS to pipeline network, piping arrangements, Storage, Electrical/ CP/ Civil/ Mechanical/ Instrumentation/ firefighting system etc. conforming to applicable codes and standards. Any residual engineering required for completion/ commissioning of the work in all respect. Job to include for releasing good for construction drawings/ specifications/ datasheets, approving vendor documents and till final as-built drawings/ document approvals. It also includes providing BOM, SOR and Specifications for preparation of PR and Tendering purpose. Job also includes Scheduling and Planning of the complete construction activity till start up and commissioning stage.
12Design of City Gate Station
13Preliminary Design
14Design, Preliminary Engineering, Drawing, BOM, Documentation, Specifications, Scheduling/Planning etc for City Gate Station and its allied facilities etc. It includes Site Visit, preparation of General Arrangement for City Gate Station and its allied facilities, Layout for seeking permissions from Building Planner, District Magistrate/District Collector, PESO and any other statutory body as applicable etc and also for Tendering purposes.
15Detail Engineering
16Detail Engineering from the approved preliminary Engineering for City Gate Station (CGS) facility including sizing along with Metering Skids, Odourising Unit, Piping arrangements, Electrical/ CP/ Civil/ Instrumentation Systems/ firefighting system etc. conforming to applicable codes and standards. Any residual engineering required for completion/ commissioning of the work in all respect. Job to include for releasing good for construction drawings/ specifications/ datasheets, approving vendor documents and till final as-built drawings/ document approvals. It also includes providing BOM, SOR and Specifications for preparation of PR and Tendering purpose. Job also includes Scheduling and Planning of the complete construction activity till start up and commissioning stage.
17Design of Mother Station
18Preliminary Design
19Design, Preliminary Engineering, Drawing, BOM, Documentation, Specifications, Scheduling/Planning etc for Mother Station and its allied facilities etc. It includes Site Visit, preparation of General Arrangement for Mother Station and its allied facilities, Layout for seeking permissions from Building Planner, District Magistrate/District Collector, PESO and any other statutory body as applicable etc and also for Tendering purposes.
20Detail Engineering
21Detail Engineering from the approved preliminary Engineering for Mother Station (MS) along with sizing and including Compressor, Cascades, Dispensers, SS Tubing, Piping arrangements, Electrical/ CP/ Civil/ Mechanical/ Instrumentation/ firefighting system etc. conforming to applicable codes and standards. Any residual engineering required for completion/ commissioning of the work in all respect. Job to include for releasing good for construction drawings/ specifications/ data sheets, approving vendor documents and till final as-built drawings/ document approvals. It also includes providing BOM, SOR and Specifications for preparation of PR and Tendering purpose. Job also includes Scheduling and Planning of the complete construction activity till start up and commissioning stage.
22Design of CNG Station
23Preliminary Design CNG Station at OMC/ CNG DBS Station
24Design, Preliminary Engineering, Drawing, BOM, Documentation, Specifications, Scheduling/Planning etc for CNG stations at existing / DODO Outlets and its allied facilities etc. It includes Site Visit, preparation of General Arrangement for CNG stations at existing / DODO Outlets and its allied facilities, Layout for seeking permissions from Building Planner, District Magistrate/District Collector, PESO and any other statutory body as applicable etc and also for Tendering purposes.
25Detail Engineering
26Detail Engineering from the approved preliminary Engineering for Online CNG Station (OLS) along with sizing and including Compressor, Cascades, Dispensers, SS Tubing, Piping arrangements, Electrical/ CP/ Civil/ Mechanical/ Instrumentation/ firefighting system etc. conforming to applicable codes and standards. Any residual engineering required for completion/ commissioning of the work in all respect. Job to include for releasing good for construction drawings/ specifications/ data sheets, approving vendor documents and till final as-built drawings/ document approvals. It also includes providing BOM, SOR and Specifications for preparation of PR and Tendering purpose. Job also includes Scheduling and Planning of the complete construction activity till start up and commissioning stage.
27Detail Engg for CNG DBS Station
28Detail Engineering from the approved preliminary Engineering for Daughter/ Daughter Booster Stations (DS/DBS) along with sizing and including Compressor, Cascades, Dispensers, SS Tubing, Piping arrangements, Electrical/ CP/ Civil/ Mechanical/ Instrumentation/ firefighting system etc. conforming to applicable codes and standards. Any residual engineering required for completion/ commissioning of the work in all respect. Job to include for releasing good for construction drawings/ specifications/ data sheets, approving vendor documents and till final as-built drawings/ document approvals. It also includes providing BOM, SOR and Specifications for preparation of PR and Tendering purpose. Job also includes Scheduling and Planning of the complete construction activity till start up and commissioning stage.
29Design of SCADA System
30Design of SCADA System/ Telecom/Telemetry System for CGD Network of particular GA
31Tendering for Works and Service Contract
32Tendering for work and services Contract including architectural (interior design etc), Preparation of Tender, floating and evaluation of tender, receipt of services and closure inclusive of the following activities: Preparation of tender, hosting of NIT/Recommendation for list of bidders ,floating of tender, receipt of bids and opening of bids, Evaluation of tender, preparation of techno-commercial evaluation, recommendation of price bid opening, price evaluation and recommendation for Placement of order, expediting the delivery up to receipt of material and closure of contract. Job also includes Change PO, whenever and wherever required.
33Tendering for Supply Contract
34Tendering for Supply Contract, Preparation of Tender, floating and evaluation of tender, receipt of services and closure inclusive of the following activities: Preparation of tender, hosting of NIT/Recommendation for list of bidders, floating of tender, receipt of bids and opening of bids, Evaluation of tender, preparation of techno-commercial evaluation, recommendation of price bid opening ,price evaluation and recommendation for Placement of order, Inspection, expediting the delivery up to receipt of material and closure of contract. Job also includes Change PO, whenever and wherever required.
35STORESManagement
36Management of stores such as receiving & issuing of the materials, Physical verification as per policy, entry on NEGDCL data management software, Preparation of Goods Receipt Note/ Material Inspection Note, preparation of Material Transfer Order (MTO), Purchase Requisition, PO and Modification of PO etc.
37INSPECTION of Material
38For inspection of material supplied by the manufacturers, attending Factory Acceptance Test (FAT) / Site Acceptance Test (SAT) etc as per the instruction of NEGDCL for which the representative has to travel out of GA boundary inclusive of all expenditure viz. Travelling, Lodging, Boarding, Local Conveyance, communication expenses etc.as per the tender.
39Carrying out the HAZOP Study
40Carrying out the HAZOP Study/QRA/ Risk Assessment Study/ ERDMP/ Operations Manual/ Integrity Management System (IMS) (ERDMP and IMS certification thru PNGRB approved Agency shall be in NEGDCL"s scope) for section of the pipeline/ stations/ terminals to be commissioned/ modified in the CGD Network as per the requirement of the project. ERDMP should be done within 3 months of commissioning of respective CGS or MS or CGS cum MS.
41CONSTRUCTION SUPERVISION AT SITE
42Construction Manager : Deployment of a construction manager , who will be responsible for overall project / construction managementincluding survey , preparation of drawing / sketch etc. required by different authorities , assistance & review in preparation of PE laying drawings on google map , selection of dia for PE laying in an area , PE laying planning with contractor, review and approval PE construction plan/ drawings , submission of GIS report covering all the asstss as per the format approved by the owner etc with the help of GA team ( Auto cad engineer will be deployed by owner in GA through Third party), planning and monitoring of construction activities at site including Steel pie laying , Composite work for CNG, DCU, DRS, MRS, CGS and PE/GI laying work , etc. as per direction of EIC/WIC in coordination with GA incharge and liasioning with local administration & other utilities for complete construction activity in totality along with HSE management - Joint route survey, construction strategyand schedule including any other jobs, as and when assigned by EIC/WIC . Reviewing and approval of all site specific documents / drawings such as ( but not limited to) WPS?EQT/HDD profile/ allignment sheet/ Job procedures/CP design documents etc as submitted by contractorwith the help of their team at Project/ Design office. Certification of contractors bill in accordance with the contract documents ( Supevision, inspection and quality surveillance will be done by the third party , only contractual comliance will be ensured by EPMC)input in closure of contracts ( Service/ Supply) to their head office team , etc . Methodology & Preparation of documents for commisioning & Gas in of Steel Network , MDPE networkand CNG/CGS/DCU/DRS/MRU. Health and safety guidelines required to be follwed in construction , commissing & startup activities . Responsible for complete planning , monitoring, scheduling, progress reporting , overall management, billing compliance etc for the GA. This SOR is inclusive of transportation charges ( car/four wheeler with each construction manager/ district office) , Lodging & Boarding charges ( if any) , office stationary , computer and peripherals for attending meetings at offices . Overall coordination with their head/ project office, Project mamanger at NEGDCL CGD office, GA incharge etc for successful execution of works. Only sitting arrange with furniture will be provided by NEGDCL.
43Project Management at NEGDCL CGD Head Office
44Project Manager : For overall project / Construction Management / monitoring as per the direction of EIC/WIC, Deploying Project Manager at NEGDCL office at Guwahati having experience as per the SCC / Scope of Work / Tender Terms & Conditions , by taking their support form their head / design office , sites/GAs / NEGDCL , for overall Planning, Preparation/ Review of construction schedulefor each GA and monitoring of the same by using appropriate software , daily monitoring of project activities , Preapartion of consolidated Weekly/Monthly Progress report for each GAs and submission of same to NEGDCL office , Guwahati including interactions/ briefing with NEGDCL management as and when required. Attending progress/CGDreview meetings at NEGDCL office on regular basis , virtual meeting for GA with all stakeholders as per direction of EIC and attending physical / virtual meeting with sites ( each GA) , submission of MoM/ record notes within next 3 working days to NEGDCL , submission of various reports to NEGDCL /sites . Preparation of Presentation for NEGDCL management in respect of CGD projects . ATR ( Action taken report) , Catch up plan to meet the slippages if any , etc including any other jobs , as and when assigned by EIC/WIC. Assisting on instruction of EIC in preparation of standard/specific drawings for SV location /LMC/DRS/DCU/MRS/Service Regulator/Commercial Connections/CNG station etc. This SOR is inclusive of transportaion charges,lodging & boarding charges ( if any) , office stationery, computer and peripherals for attending meetings at Guwahati/Sites/GAs . Overall coordination with their head office for successful execution of works . only sitting arrangement with furniture will be provided ny NEGDCL. Overall experience : At least 15 years experience in executing projects in in Hydrocarbon Industry ie CGD projects, Hydrocarbon Process Plants , Pipelines( Hydrocarbon/Crude) Petrochemical Plant, LPG plant, Refinery Etc. Mandatory Experience : Out of the 15 years experience , at least 8 years experience must be in senior position in the excution of CGD projects. Profile having previous work experience related to heading Engineering Procurement MAnagement consultant for multiple GAs will be given preference
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail