Public Health Engineering Department-PHED has published Tender For Estimate For Construction Of Aug. Water Works And Laying Of Rising Main Under Public Health Engg. Division Mohindergarh , Tehsil And Distt. Mohindergarh , Construction Of 1 Raw Water Pumping Station, 1 Water Works, Laying The Raw And Clear W. Submission Date for this Tender is 28-11-2023. Centrifugal Pump Tenders in Mahendragarh Haryana. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 23-Nov-2023 | Minimum Bids Not Received | Date | 28-11-2023 |
Sl. No. | Item Description |
1 | Providing, fixing and commissioning Vacuum Gas Chlorination system of rating 2000 grams per hour as designed having the control of gas 20th part of max. dose and which can startworking automatically on switching in the supply of water at the water works site consisting ofvacuum regulator E-10K (EVOQUA/ WandT USA Make) Supreme Technology including safetyequipments consisting of chlorine mask with canister, chlorine leak detector with hooter andsensor, 2 nos. filled of chlorine cylinders of capacity 100 kg duly certified and approved by BIS and explosive department Govt. of India, spanner with cylinder opening key, 2 setconnectors, iron cage guard the system including complete installation of the equipments and all other works contingent thereto as per satisfaction of Engineer-In-Charge |
2 | Crossing of nala repair the same if damage occur |
3 | DOMISTIC CONNECTION REPAIR |
4 | Providing and fixing flow meter as per site required complet in all respect |
5 | Providing and fixing pressure gauge as per site required complet in all respec |
6 | providing and fixing duck foot bend with jali as per requirment of site condition at bottom of pump set |
7 | Repair /Shifting of existing utility i.e HDPE pipe cable UPVC pipe connectingvarious farmer consumers damaged during excavtion for laying of rising main complete job |
8 | Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 40.00 m as per the indicated requirements of discharge in 900 LPM and power capacity in 15 BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect |
9 | PROVIDING AND FIXING CONCERTINA COIL FENCING WITH PUCHED TAPE CONCERTINA COIL 600 MM DIA 10 METER OPENABLE LENGTH FIXED ON EXISTING ANGLE IRO Y SHAPED PLACED 2.4 MTR OR 3 MTR APART WITH 5 HORIZONTAL R.B.T REINSFORCEMNT BARBED WIRE STUTIED WITH GI STAPLE AND GI CLIPING TO RETAIN HORIZONTAL INCLUDING NECESSARY BOLTS OR GIBARBED WIRE TIED TO ANGLE IRON ALL COPLETE AS PER DIRECTION OF ENGINEER IN CHARGE WITH REINSFORCED BARBED TAPE |
10 | PROVIDING AND FIXINGLED LIGHT OF 50 WATT( SYSKA PHILIPS HALELLS) |
11 | PROVIDING AND FIXING LED LIGHT OF 9 WATT ( SYSKA PHILIPS HALELLS) |
12 | WALL FAN OF SIZE SWEEP 40 CM (400MM SPEED 1280 RPM POWER INPUT 55W |
13 | SUPPLY ERECTION AND COMMISSIONING ELECTRIC OPERATED VACCUME PUMP OF 5 HP KIRLOSKER MAKE COMPLETR FROM PRIMING WITH WIRING STARTERS SWITCHES ETC ALSO THE REQUIRED GI PIPE B CLASS VALVES AND SIGHT GLASS ETC COMPLETE TEXMO |
14 | SUPPLY ERECTION AND COMMISSIONING ELECTRIC OPERATED DEWATERRING PUMP OF 2 HP KIRLOSKER MAKE COMPLETR FROM PRIMING WITH WIRING STARTERS SWITCHES ETC ALSO THE REQUIRED GI PIPE B CLASS VALVES AND SIGHT GLASS ETC COMPLETE MAKE TEXMO |
15 | Providing and fixing Meter, cable and other relevent material including approval from DHBVN and PHED as per norms for arrangment to transfer the solar power to DHBVN complete in all respect as per satisfection of engineer in charge |
16 | Providing and fixing Guide pipe of make SS as per requirement of motor |
17 | Providing and fixing SS Chain with D hook as per rquirement of motor |
18 | PROVIDING and FIXING SING BOARD OF SIZE 2.5 MTR 1.5 MTR MADE 75X25 MM SS TUBE WITH SHEET INCLUDING FOUNDATION MAKING |
19 | SUPPLY ERECTION TESTING COMMESSIONING OF LT PANEL WITH COPPER BUS BAR SN DSOLID CONNECTION OF SUITABLE RATING FOR RESPECTIVE MOTOR AS PER APPROVED NIT MCCB AMP - 1 NOCONTARCTOR OF AMP - 2 NO ELECTRONIC MOTOR PROTECTIVEPROTECTON OVER CURRENTUNDER CURRENTPHASE LOSS IMBLANCE OF REVERSALLOCK ROTTER TIMER ELECTRONIC 0.60 SEC - 1 NOSINGLE PHASE PREVENTER 415 VOLT AC 1 NOPUSH BOTTON AMP METER - 2NOAMP SELECTOR SWITCH - 1 NO CONTROL FUSE -2 NO STAR DELTA STARTER - 2 NO |
20 | Providing and fixing raw water horizental spilit casing motor of make kirlosker of (500 LPM 12 Mtr head 5 BHP) |
21 | Providing and fixing Bus bar as per requirement of site of make (LandT) |
22 | Supply and erection of LT copper cable for 100volts fitted in cable tray complet in all respect as per approved NIT 3.50 core x 10 sqmm |
23 | Supply and ere ction of LT copper armound cable for 100volts fitted in cable tray complet in all respect as per approved NIT... (3 core 6 sqmm) |
24 | Supply and ere ction of LT copper cable for 100volts fitted in cable tray complet in all respect as per approved NIT.. (3.00 core 4 sqmm) |
25 | Supply anderction of aluminum armound LT cable for 100volts fitted in cable tray complet in all respect as per approved NIT (3.50 core x 50 sqmm) |
26 | Operation and Maintenance for complete scope of work mentioned in the DNIT (Disinfection material supplied by PHED) as per schedule-IV for a period of 5 year after 12 months during defect liability period and 03 Months trial run will be charged to the A/Mtc. estimate complete in all respect as per approved NIT. Operation and Maintenance during defect liability period (Operation only) after 3 month trial run period |
27 | Operation and Maintenance during 1st year after defect liability period. |
28 | Operation and Maintenance during 2nd year. |
29 | Operation and Maintenance during 3rd year. |
30 | Operation and Maintenance during4thyear. |
31 | Operation and Maintenance during5thyear. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail