| 1 | Earth work in excavation of foundation trenches and column pits in all kinds soil and depositing excavated materials within 50m initial lead and 1.5m initial lif twith rough dressing inclusive cost of all labour, sundries, Tools & plants etc. complete and as per direction of theEngineer-in-charge . |
| 2 | Filling in foundation trenches and plinth with sweet river sand, well watered and compacted in layers of 0.225 mtr,top surface dressed and leveled to proper gradientincluding cost of all materials, conveyance, taxes and royalties, including cost of all labour, T&P, sundries etc. complete as per direction of the Engineer-in-charge. |
| 3 | Providing and laying plain cement concrete (1:4:8) in foundation and bottom layers of flooring etc. using 40mm size hard crusher broken granite metal of approved quality from approved quarry including mixing, lowering, laying concrete and compacting to proper thickness, watering and curing for the required period , including cost of all materials, taxes and royalities, loading and unloading conveyance, all labour, sundries, T&P etc. complete and as per directions of the Engineer-in-charge |
| 4 | Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strengtth not less than 75Kg/ Cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in superstructureto the requiredlevelwatering and curing etc., complete including cost and conveyance of all materials all taxes and royalities and alllabour with T&P required for the work etc., completein all respect as per the direction of Engineer-in-charge.- Ground Floor |
| 5 | Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strengtth not less than 75Kg/ Cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in superstructureto the requiredlevelwatering and curing etc., complete including cost and conveyance of all materials all taxes and royalities and alllabour with T&P required for the work etc., completein all respect as per the direction of Engineer-in-charge.- FirstFloor |
| 6 | R.C.C. M 20 GRADE& 20MM d.g. c.b hard black granaite chips including all cost and Centering, Shuttrering etc., complete-Ground floor Base of footing |
| 7 | ( b) Plinth beam |
| 8 | (c) Column upto Roof level |
| 9 | (d) Lintel |
| 10 | (e) Chajja |
| 11 | (f) Roof Slab |
| 12 | (i) Stair Case |
| 13 | Providing HYSD bar reinforcement for R.C.C. work including Straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding wire cost and conveyance of HYSD bars complete in all respect as per specification for road & Bridge and direction of Eng -in Charge.- Ground Floor |
| 14 | Supplying , fitting and fixing in position steel cutting edge as per approved design using GI anglesm bolts, and nuts complete incluidng cutting angels to required size bending to shape, drilling holes and reverting and welding etc. complete in all respect as per the direction of Engineer in Charges. -First Floor |
| 15 | 12mm (1/2\") thick cement plaster (1:6) finished smooth to outside/inside surface of metal concrete walls after racking out joints including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc., complete in all respect in all floors as per the direction of Engineer in charge- Ground Floor |
| 16 | 16mm (5/8\") thick cement plaster (1:6) in finished smooth to inside rough surface of 10\" thick brick walls after racking out the joints including watering and curing with cost, conveyance, royalty, all tax of all materials and cost of all labour with T&P required for the work etc. complete. as per the direction of Engineer-in-charge-Ground Floor |
| 17 | Providing 6mm thick cement plaster with cement mortar (1:4) to ceilings of roof slabs, stairs, landings, chajja, shelves, columns, beams and lofts etc. including, scraping, cleaning and finishing the plastered surface smooth to proper plumbs as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing ,sundries, T&P etc. complete as per direction of the Engineer-in-charge-Ground Floor |
| 18 | Fixing Vetrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:4 (1cement : 4sand) jointed with neat cement slury mixed with pigment o match the shades of the tiles including rubbing and polishing complete including cost of precast tiles. -Ground Floor |
| 19 | Fixing vertified tiles in floors,treads (600mm x 600mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 20 | Fixing floor tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 21 | Fixing glazzed tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 22 | Providing and fixing Granite tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 23 | Painting two coats in all floors (Two coats with paints of approved shade and base coat with primer) to new wood andiron work including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paints and primer complete in all respect as per the direction of Engineer in Charge.-First Floor |
| 24 | Distempering 2 coats to walls with any approved shed incluidng cost of priming one coat with water bound cement primer with cost of all materials labour etc. complete as per the direction of Engineer in Charge- Ground Floor |
| 25 | Weather coat two coat over one coat of primerincluding cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paints and primer complete in all respect as per the direction of Engineer in Charge.-First Floor |
| 26 | Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strengtth not less than 75Kg/ Cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in superstructureto the requiredlevelwatering and curing etc., complete including cost and conveyance of all materials all taxes and royalities and alllabour with T&P required for the work etc., completein all respect as per the direction of Engineer-in-charge.- FirstFloor |
| 27 | R.C.C. M 20 GRADE& 20MM d.g. c.b hard black granaite chips including all cost and Centering, Shuttrering etc., complete -First Floor - Column & Beam |
| 28 | (b) Firt Floor - Lintel |
| 29 | (c) First Floor - Chajja |
| 30 | (d) Firt Floor - Roof Slab |
| 31 | (i) First Floor - Stair Case |
| 32 | Providing HYSD bar reinforcement for R.C.C. work including Straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding wire cost and conveyance of HYSD bars complete in all respect as per specification for road & Bridge and direction of Eng -in Charge.- Ground Floor |
| 33 | Supplying , fitting and fixing in position steel cutting edge as per approved design using GI anglesm bolts, and nuts complete incluidng cutting angels to required size bending to shape, drilling holes and reverting and welding etc. complete in all respect as per the direction of Engineer in Charges. -First Floor |
| 34 | 12mm (1/2\") thick cement plaster (1:6) finished smooth to outside/inside surface of metal concrete walls after racking out joints including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc., complete in all respect in all floors as per the direction of Engineer in charge- First Floor |
| 35 | 16mm (5/8\") thick cement plaster (1:6) in finished smooth to inside rough surface of 10\" thick brick walls after racking out the joints including watering and curing with cost, conveyance, royalty, all tax of all materials and cost of all labour with T&P required for the work etc. complete. as per the direction of Engineer-in-charge-First Floor |
| 36 | Providing 6mm thick cement plaster with cement mortar (1:4) to ceilings of roof slabs, stairs, landings, chajja, shelves, columns, beams and lofts etc. including, scraping, cleaning and finishing the plastered surface smooth to proper plumbs as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing ,sundries, T&P etc. complete as per direction of the Engineer-in-charge-FirstFloor |
| 37 | Fixing Vetrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:4 (1cement : 4sand) jointed with neat cement slury mixed with pigment o match the shades of the tiles including rubbing and polishing complete including cost of precast tiles. -Ground Floor |
| 38 | Fixing vertified tiles in floors,treads (600mm x 600mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 39 | Fixing floor tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 40 | Fixing glazzed tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. |
| 41 | Painting two coats in all floors (Two coats with paints of approved shade and base coat with primer) to new wood andiron work including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paints and primer complete in all respect as per the direction of Engineer in Charge.-First Floor |
| 42 | Distempering 2 coats to walls with any approved shed incluidng cost of priming one coat with water bound cement primer with cost of all materials labour etc. complete as per the direction of Engineer in Charge- Ground Floor |
| 43 | Weather coat two coat over one coat of primerincluding cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paints and primer complete in all respect as per the direction of Engineer in Charge.-First Floor |
| 44 | Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strengtth not less than 75Kg/ Cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in superstructureto the requiredlevelwatering and curing etc., complete including cost and conveyance of all materials all taxes and royalities and alllabour with T&P required for the work etc., completein all respect as per the direction of Engineer-in-charge.- Second floor |
| 45 | R.C.C. M 20 GRADE& 20MM d.g. c.b hard black granaite chips including all cost and Centering, Shuttrering etc., complete-Second Floor - Column & Beam |
| 46 | (d) Firt Floor - Roof Slab |
| 47 | Providing HYSD bar reinforcement for R.C.C. work including Straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding wire cost and conveyance of HYSD bars complete in all respect as per specification for road & Bridge and direction of Eng -in Charge.- Ground Floor |
| 48 | Supplying , fitting and fixing in position steel cutting edge as per approved design using GI anglesm bolts, and nuts complete incluidng cutting angels to required size bending to shape, drilling holes and reverting and welding etc. complete in all respect as per the direction of Engineer in Charges. -First Floor |
| 49 | 12mm (1/2\") thick cement plaster (1:6) finished smooth to outside/inside surface of metal concrete walls after racking out joints including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc., complete in all respect in all floors as per the direction of Engineer in charge- SecondFloor |
| 50 | 16mm (5/8\") thick cement plaster (1:6) in finished smooth to inside rough surface of 10\" thick brick walls after racking out the joints including watering and curing with cost, conveyance, royalty, all tax of all materials and cost of all labour with T&P required for the work etc. complete. as per the direction of Engineer-in-chargeSecond Floor |
| 51 | Providing 6mm thick cement plaster with cement mortar (1:4) to ceilings of roof slabs, stairs, landings, chajja, shelves, columns, beams and lofts etc. including, scraping, cleaning and finishing the plastered surface smooth to proper plumbs as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing ,sundries, T&P etc. complete as per direction of the Engineer-in-charge-Second Floor |
| 52 | Painting two coats in all floors (Two coats with paints of approved shade and base coat with primer) to new wood andiron work including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paints and primer complete in all respect as per the direction of Engineer in Charge.-First Floor |
| 53 | Distempering 2 coats to walls with any approved shed incluidng cost of priming one coat with water bound cement primer with cost of all materials labour etc. complete as per the direction of Engineer in Charge- Ground Floor |
| 54 | Weather coat two coat over one coat of primerincluding cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paints and primer complete in all respect as per the direction of Engineer in Charge.-First Floor |
| 55 | Construction of Display Board at site of proper specification as fixed by Department as per the direction of the Engineer-in-Charge. |