Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Mtps I Mill Plant Centralised Ac Plant Attending Breakdown Works In Ac Compressor No 2 And 3 Ac Cooling Tower Fans Air Handling Units Air Washer System Circulating Water Pumps Pipe Lines And Valves Etc. Submission Date for this Tender is 15-11-2023. Mechanical engineering Service Tenders in mettur Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

40460103
Tender For Mtps I Mill Plant Centralised Ac Plant Attending Breakdown Works In Ac Compressor No 2 And 3 Ac Cooling Tower Fans Air Handling Units Air Washer System Circulating Water Pumps Pipe Lines And Valves Etc
Open Tender
Indian
Tamil Nadu
mettur
15-11-2023

Tender Details

Mtps I Mill Plant Centralised Ac Plant Attending Breakdown Works In Ac Compressor No 2 And 3 Ac Cooling Tower Fans Air Handling Units Air Washer System Circulating Water Pumps Pipe Lines And Valves Etc

Key Value

Document Fees
Refer document
EMD
INR 7900.0 /-
Tender Value
Refer document

BOQ Items

Name ofWork:MTPS-I - Mill Plant – Centralised A.C Plant – Attending Breakdown works in A.C. Compressor No.2 & 3, A.C. Cooling tower fans, Air handling units, Air washer system, Circulating water pumps, pipe lines and valves etc. for a period of 365 days from the date of commencement of works
Sl. No. Item Description
1Charges for Mettron R22 Gas loading for the A.C. Compressor Model AC1670 and leak testing the entire compressor system. (Mettron gas will be supplied by TANGEDCO).
2Charges for draining the dirty lub. oil with necessary precaution from the crank case, dismantling all the inspection cover, filter cover and filter, Cleaning the dirty oil completely in the crank case and filter housing, then assembling the inspection cover, filter, filter cover and filling oil in the crank case up to the level reached the ½ of the sight glass and leak testing.
3Charges for de-coupling the motor from compressor, then dismantling of suction strainer assembly, discharge valve NRV for checking and cleaning, replacement of shaft seal and re-assembling.
4Charges for aligning the A.C. Compressor with motor and re-commissioning of compressor and made trial run satisfactorily.
5Charges for removing the damaged Love joy coupling from the CT fan gear shaft, motor shaft and fromboth end of the Transmission shaft and then re-fixing the coupling each sides - 2 Nos. and aligning motor with fan.
6Charges for removing Blower/motor pulley from the shaft and then re-fixing the new pulley / replacing pulley into the shaft.
7Charges for removing damaged bearing from the blower shaft, cleaning the drive end / non-drive end bearing seating area and replacing the new Plummer block and bearing and then greasing.
8Charges for blower motor positioning on the bed, balancing blower, aligning motor with blower and providing belt and adjusting belt tension & commissioning satisfactorily.
9Model 7 & 5 :- Charges for removing blower pulley and the damaged bearing from the blower shaft, cleaning the drive end / non-drive end bearing seating area and then re-fixing the new pulley and bearing and then greasing and aligning motor with blower.
10Model 7:- Charges for dismantling and assembling the back side door to remove the defective shaft and the Impeller replacing with new one after assembling the drive end and non-drive end bearing, fixing the pulley and aligning motor with blower
11Model 5:- Charges for dismantling and assembling the back side door to remove the defective shaft and the Impeller replacing with new one after assembling the drive end and non-drive end bearing, fixing the pulley and aligning motor with blower.
12Charges for removing AWS Blower pulley from the shaft by heating and then re-fixing the pulley into the shaft.
13Charges for removing the damaged bearing, cleaning the bearing seating area and replacing the new bearing and then greasing AWS Blower (Drive end / Non drive end).
14Charges for AWS Blower motor positioning on the bed, balancing blower, aligning motor with blower and providing belt and adjusting belt tension and commissioning satisfactorily.
15Chargesfor De-Coupling the AWS CWP and the motor, dismantling the pump casing removing the shaft and the impellerassembly from the casing and removing the damagedboth DE bearing and NDE Bearing, cleaning the bearing seating area, replacing the new bearing and assembling the pump, coupling the pump with motor and alignmentchecking.
16Charges for welding the punctured AHU chill water, inlet, out let pipe of various sizes in various locations by providing spool piece and gauge nipples.
17Renewing the gate valves and gaskets for 100/150/200/250mm valves: This works involves removing the valves from the line, cleaning the flange surface on both sides, preparation of gaskets for both ends, positioning the valve in the line with gaskets and tightening theflange bolts & nuts.
18Cost of cutting gas DA and oxygen
19Cost of welding electrodes
20Charges for consumables and T & Ps for
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail