Tender For Supply, Installation And Commissioning Of 6 Nos Floor Standing /Tower Type 4.6 Ton Air Conditioner Units And Dismantling Of Existing 8 Nos 2.0 Ton Split Air Conditioner At 230Kv Ra Puram Gis Ss, puram-Tamil Nadu

Tamil Nadu Transmission Corporation Limited-TANTRANSCO has published Tender For Supply, Installation And Commissioning Of 6 Nos Floor Standing /Tower Type 4.6 Ton Air Conditioner Units And Dismantling Of Existing 8 Nos 2.0 Ton Split Air Conditioner At 230Kv Ra Puram Gis Ss. Submission Date for this Tender is 21-11-2023. Air Conditioner Tenders in puram Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

40455332
Tender For Supply, Installation And Commissioning Of 6 Nos Floor Standing /Tower Type 4.6 Ton Air Conditioner Units And Dismantling Of Existing 8 Nos 2.0 Ton Split Air Conditioner At 230Kv Ra Puram Gis Ss
Open Tender
Indian
Tamil Nadu
puram
21-11-2023

Tender Details

Supply, Installation And Commissioning Of 6 Nos Floor Standing / Tower Type 4.6 Ton Air Conditioner Units And Dismantling Of Existing 8 Nos 2.0 Ton Split Air Conditioner At 230Kv Ra Puram Gis Ss , A.Supply Portion , Supply Of 3Phase 4.6 Ton Tower ( Floor Standing ) Air Conditioner Units With Wired Remote , Supply Of 20 Gauge Thickness Copper Pipe Od 3 / 4 & 3 / 8 With Nitrile Rubber Insulation , Supply Of 4Cx2.5 Sqmm Cable Between Indoor And Outdoor Unit , Supply Of 40Mm Upvc Drain Pipe With Nitrile Rubber Insulation , Supply Of 32Mm Upvc Drain Pipe With Nitrile Rubber Insulation , Supply Of Indoor Fabricated Stand , Supply Of Outdoor Heavy Duty Stand , Supply Of 4Cx6 Sqmm Armoured Copper Cable Including Gland , B.Installation And Commissioning Services , Instalation Of 4.6Ton Tower ( Floor Standing ) Air Conditioner Units , Installation Of Copper Pipe 3 / 4 & 3 / 8 With Nitrile Rubber Insulation And Fibre Glass Tape Under The False Floor , Laying Of 4Cx2.5 Sqmm Cable With Pvc Conduit Pipe Under The False Floor , Installation Of 40Mm Upvc Drain Pipe With Nitrile Rubber Insulation Under The False Floor , Installation Of 32Mm Upvc Drain Pipe With Nitrile Rubber Insulation Under The False Floor , Laying Of 4Cx6 Sqmm Armoured Copper Cable From Outdoor Unit At First Floor Open Terrace Via Cable Tray To Ground Floor Cable Gallery And Then To Acdb Panel In First Floor With Glanding And Termination. , Labour Charges Towards Lifting And Shifting Odu To First Floor Open Terrace, Lifting Of False Floor Tiles And Closing Back, Minor Civil Work & Wall Core Cutting. , C. Dismantling Services , Dismantling Of Existing 2 Ton Split Ac Indoor Unit, Outdoor Unit And Accessories. , Labour Charges After Dismantling Of Ac Unit By Filling Up Of Open Holes Inside And Outside The Wall And Weather Proofing Civil Work Above The False Ceiling. , A+B+C

Key Value

Document Fees
Refer document
EMD
INR 16000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Supply, installation and commissioning of 6 Nos Floor Standing /Tower Type 4.6 TON Air Conditioner Units and Dismantling of existing 8 Nos 2.0 TON Split Air Conditioner at 230KV RA PURAM GIS SS, RA Puram, Chennai-28
Sl. No. Item Description
1A.Supply Portion
2Supply of 3Phase 4.6 Ton Tower (Floor standing ) Air Conditioner units with Wired Remote
3Supply of 20 Gauge thickness Copper Pipe OD 3/4" & 3/8" with nitrile Rubber Insulation
4Supply of 4Cx2.5 Sqmm Cable between Indoor and Outdoor Unit
5Supply of 40mm UPVC drain Pipe with nitrile rubber insulation
6Supply of 32mm UPVC drain Pipe with nitrile rubber insulation
7Supply of Indoor fabricated stand
8Supply of Outdoor Heavy Duty stand
9Supply of 4Cx6 Sqmm Armoured Copper cable including gland
10B.Installation and Commissioning Services
11Instalation of 4.6Ton Tower (Floor standing ) Air Conditioner units
12Installation of Copper Pipe 3/4" & 3/8" with nitrile Rubber Insulation and Fibre Glass tape under the false floor
13Laying of 4Cx2.5 Sqmm Cable with PVC conduit pipe under the false floor
14Installation of 40mm UPVC drain Pipe with nitrile rubber insulation under the false floor
15Installation of 32mm UPVC drain Pipe with nitrile rubber insulation under the false floor
16Laying of 4Cx6 Sqmm Armoured copper cable from outdoor unit at first floor Open Terrace via Cable tray to Ground floor Cable Gallery and then to ACDB Panel in First Floor with Glanding and Termination.
17Labour Charges towards lifting and shifting ODU to First floor Open Terrace,lifting of false floor tiles and closing back, Minor Civil Work & wall Core Cutting.
18C. Dismantling Services
19Dismantling of Existing 2 Ton Split AC indoor Unit,Outdoor Unit and Accessories.
20Labour Charges after Dismantling of AC unit by Filling up of open holes inside and outside the Wall and weather proofing Civil Work above the false ceiling.
21A+B+C
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail