| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 2 | Excavation in all kinds of soil including moorum, stoney earth, gravel etc.excepting all kinds of rock & boulders exceeding 0.014Cum in volume for dam base stripping, cut-off trenches, outfall drains and stripping in borrow areas including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 1.5m initial lift including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 3 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter spread with boulders up to 1/2 Cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineering- charge including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete within an initial lead of 1km from the place of excavation complete. |
| 4 | Ramming or rolling eath work with light H.R.R. in embankment in layers not exceeding 0.3m including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 5 | Fine dressing and turfing with initial lead of 50m and 1.5m initial lift including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 6 | Rough stone dry packing in approns and revetments with Stone other than granite quarried, broken and staked above 0,003 Cum complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Jharbeda |
| 7 | Rough stone dry packing in approns and revetments with Stone other than granite quarried, broken and staked above 0,003 Cum complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Allahani |
| 8 | Rough stone dry packing in approns and revetments with Stone other than granite quarried, broken and staked above 0,003 Cum complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Andoli |
| 9 | Cement flush pointing to stone masonry (1 :3) watering and curing etc. completeincluding cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Jharbeda |
| 10 | Cement flush pointing to stone masonry (1 :3) watering and curing etc. completeincluding cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Allahani |
| 11 | Cement flush pointing to stone masonry (1 :3) watering and curing etc. completeincluding cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Andoli |
| 12 | Earth work in hard soil or gravelly soil within 50M initial lead and 1.5M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3M in depth including cost and conveyance & taxes of all materials and cost of all labour T&P required for the work complete as per the direction of the EIC. |
| 13 | Supplying, Filling sand infoundation & plinth well watered and rammed including cost, conveyance, taxes, royalty of sand, labour & T&P, Labour welfare cess@1% etc. complete as per specification and direction of the EIC.- For WB Location Jharbeda |
| 14 | Supplying, Filling sand infoundation & plinth well watered and rammed including cost, conveyance, taxes, royalty of sand, labour & T&P, Labour welfare cess@1% etc. complete as per specification and direction of the EIC.- For WB Location Allahani |
| 15 | Supplying, Filling sand infoundation & plinth well watered and rammed including cost, conveyance, taxes, royalty of sand, labour & T&P, Labour welfare cess@1% etc. complete as per specification and direction of the EIC.- For WB Location Andoli |
| 16 | Supplying, Filling sand infoundation & plinth well watered and rammed including cost, conveyance, taxes, royalty of sand, labour & T&P, Labour welfare cess@1% etc. complete as per specification and direction of the EIC.- For Check Dam Location Dalki |
| 17 | Supplying, Filling sand infoundation & plinth well watered and rammed including cost, conveyance, taxes, royalty of sand, labour & T&P, Labour welfare cess@1% etc. complete as per specification and direction of the EIC.- For SSD Location Potup |
| 18 | Cement Concrete (1:3:6) by using 40 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Jharbeda |
| 19 | Cement Concrete (1:3:6) by using 40 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Allahani |
| 20 | Cement Concrete (1:3:6) by using 40 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Andoli |
| 21 | Cement Concrete (1:3:6) by using 40 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For Check Dam Location Dalki |
| 22 | Cement Concrete (1:3:6) by using 40 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For SSD Location Potup |
| 23 | Plain cement concrete (1:2:4) using 12 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Jharbeda |
| 24 | Plain cement concrete (1:2:4) using 12 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Allahani |
| 25 | Plain cement concrete (1:2:4) using 12 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For WB Location Andoli |
| 26 | Plain cement concrete (1:2:4) using 12 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For Check Dam Location Dalki |
| 27 | Rigid and smooth centering & shutering for RCCwork including false works & dismentalling then after casting including cost, conveyance and taxes of all materials and cost of labour, T&P required for the work etc. complete as per specification and direction for the EIC.- RCC foundation and plinth band footings,bases of columns. Mass concrete & pre cast slabs |
| 28 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P, Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.- For Check Dam Location Dalki- RCC foundation and bases of columns. Mass concrete |
| 29 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P, Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.- For Check Dam Location Dalki- Plinth Beam |
| 30 | Reinforced Cement Concrete M20 grade 20mm & down graded size hard granite crusher broken chips of approved quality and from approved quarry including centring, shuttering, lowering, laying concrete, watering and curing etc. complete for required levels laid in layers including cost, conveyance, royalty and taxes of all materials and cost of labour, T&P, Labour Welfare cess @1% required for the work etc. complete as per specification and direction for the EIC.- For Check Dam Location Dalki- RCC walls |
| 31 | RRHG stone masonary in cement mortar [1:4] in P & F work. with hard granite stones (15cm to 30cm) complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For Check Dam Location Dalki |
| 32 | RRHG stone masonary in cement mortar [1:4] in P & F work. with hard granite stones (15cm to 30cm) complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For SSD Location Potup |
| 33 | 20 mm. thick cement plaster (1:6) for stone work watering and curing etc. complete including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.- For SSD Location Potup |
| 34 | Filling in foundation and plinth with excavated materials with watering and ramming including cost, conveyance, taxes, royalty of sand, labour & T&P complete as per specification and direction of the EIC. |
| 35 | Supplying MS round / deformed / tor steel reinforcement bars of approved companies & grade of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in positionas per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. Labour Welfare cess @1% completeas per the direction of the EIC. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights).- For WB Location Jharbeda |
| 36 | Supplying MS round / deformed / tor steel reinforcement bars of approved companies & grade of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in positionas per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. Labour Welfare cess @1% completeas per the direction of the EIC. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights).- For WB Location Allahani |
| 37 | Supplying MS round / deformed / tor steel reinforcement bars of approved companies & grade of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in positionas per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. Labour Welfare cess @1% completeas per the direction of the EIC. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights).- For WB Location Andoli |
| 38 | Supplying MS round / deformed / tor steel reinforcement bars of approved companies & grade of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in positionas per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. Labour Welfare cess @1% completeas per the direction of the EIC. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights).- For Check Dam Location Dalki |