Power Government Departments Closing in 0 days TDR #40449445

Tender For Providing & Erection For Sop To Tubewell At Village Kaloh Beli For Proposed 11/0.4 Kv 63 Kva Substation Along With 3-Phase And 1-Phase Lt Line And Sop To Tubewell Of Various Consumers At Village Shivpur And 3-Phase Lt Extension For Sop To Tubew

Issued by Government Departments · gagret, Himachal Pradesh
Tender Value
7.39 Lakhs
Estimated cost
Bid Submission
07 Nov 2023
0 days left
EMD
7391
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
gagret → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Providing & Erection For Sop To Tubewell At Village Kaloh Beli For Proposed 11 / 0.4 Kv 63 Kva Substation Along With 3-Phase And 1-Phase Lt Line And Sop To Tubewell Of Various Consumers At Village Shivpur And 3-Phase Lt Extension For Sop To Tubewell At Village Jindbar Under Esd Gagret. ( Bid No. Ged-80 / 2023-24 ) Name Of Scheme :- Sop To Tubewells Under ( Op ) Circle, Hpsebl, Una ( Phase-Iii

BOQ

Name of work:- Tender for prov. & erection for SOP to tubewell at village Kaloh Beli for proposed 11/0.4 KV 63 KVA substation along with 3-phase and 1-Phase LT line and SOP to tubewell of Various consumers at village Shivpur and 3-phase LT extension for SOP to tubewell at village Jindbar under ESD Gagret. (Bid No. GED-80/2023-24) Name of Scheme :- SOP to Tubewells under (OP) Circle, HPSEBL, Una (Phase-III)
Sl. No. Item Description
1Erection Part of 11 KV HT Line (TS No. 20/2023-24)
2Erection of S.T Single Pole 9Mtr. Long :- Digging of Pit, fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , Alluminium Paint and ramming & painting of poles complete in all respect.
3Erection of S.T single Pole 9 Mtr. Long for Tapping :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of poles, fixing of barbed wire and danger plate, filling of Pit ,G.O. Switch,Alluminium Paint and ramming & painting of poles complete in all respect.
4Earthing:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
5Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
6Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.
7Laying of G.I Wire, Stringing,Sagging and binding complete in all respect.
8Erection of GO switch complete in all respect.
9Fixing jumper complete in all respect.
10Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
11Erection Part of 11/0.4 KV, 63 KVA Transformer(T.S. No 20 /2023-24)
12Erection of 63 KVA S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium PaintAI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 5 Nos., Erection of LT cable, brabed wire and painting, 5 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 63 KVA Transformer)
13Loading of S/Stn. complete and allied materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of DTR and allied Material For Average Distance From Road To Site Of Work .(If required as per site).
14Erection Part 3-Phase and 1-PhaseLT line(T.S. No 20/2023-24)
15Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
16Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
17Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
18Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor ofNew 1-Ph. and 3-Ph.L.T Line complete in all respect.
19G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
20Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).
21Erection Part 3-Phase and 1-PhaseLT line(T.S. No 21/2023-24)
22Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
23Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
24Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
25Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor ofNew 1-Ph. and 3-Ph.LT Line and complete in all respect.
26G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
27Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).
28Erection Part 3-Phase LT line (T.S. No 33/2023-24)
29Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
30Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
31Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
32Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor ofNew 3-Ph. LT line complete in all respect.
33G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
34Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).
35Transformer LT distribution Box & GO Switch fixing Assembly (T.S. No 20/2023-24)
36Prov. RCC Muffs with concerete filling
37Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
38Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
39Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
40Transformer Belting & Knee Bracing
41Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
42Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
43Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
44Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
45Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
46Transformer L.T Distribution Box and GO Switch fixing Assembly
47Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
48Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
49Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
50Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple Pole O/d Type
51Prov. D.O Fuse Unit
52Prov. Surge Arrester, 11 KV Porcelain(9kV, 5KA)
53Prov. Discs insulator sets on Dead End structures (comprising 1 No.Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clampsetc.) x (3 No. conductors) x (2 No. sides)
54Prov. Stay set complete
55Prov. HT Stay Wire
56Prov. Pipe Earthing Set
57Prov. Panel(Distribution Box LT MS Sheet od 1.6 mm (900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x5mm)inside .painted /powder coated after primar coating MCCB 100 amp 3P 35kA ,ICS =100 % ICU, KIT-KAT 200 Amp
58Prov. Half Clamp (M.S. Flat 50X6 mm)
59Prov. Full Clamp (M.S. Flat 50X6 mm)
60Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
61Prov. Aluminium Thimble
62Prov. Aluminium Thimble
63Prov. Barbed Wire
64Prov. LT Cable (3.5 Core) 95 mm²
65Prov. Energy Meter 3-?, 4 wire CT operated Static Tri-Vector meter with Box(CT-100/5A) for 63 KVA Transformer
66Prov. Aluminium Paint.
67Prov. Red Oxide
68Supply Part of 11 KV HT Line (TS No. 20/2023-24)
69Prov. RCC Muff with Concrete filling
70Run Through Str. ( ?) Formation on Singl Pole Str.
71Prov.Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole
72Prov.Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure
73Prov.Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
74Dead End Str.
75Prov Belt Set Angle Iron (50x50x6) Length 1800mm x2 Nos.
76Prov.X-Bracing Set.MS Angle Iron (50x50x6 mm) Length 2125 mm x2 Nos.
77Prov.X-Arm (Horizontal) MS-Channel Iron (100x50x6mm) Length 2340 mm x2 Nos.( ?) Formation
78For G.O. Switch and D.O. Fuse.
79X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4Nos] for supporting DO fuse unit & GO switch
80G.O. Switch Handle Supporting (Channle Iron 75x40x6 mm) Length 460mm
81Prov.Nuts and Bolts of Various Sizes
82Prov.MS Half Clamp
83Prov.MS Full Clamp
84Prov.Barbed Wire
85Prov.Eye/Earth Hook
86Prov. Earth Wire Clamp
87Prov.Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)
88Prov.11kv Pin Insulator with pincomplete in all respect
89Prov.11kv Stay Set
90Prov. HT Stay Wire
91Prov.RedOxide (1.5 Ltr. Per Pole)
92Prov.Alluminum Paint
93Prov. 11kv D.O.Fuse unit.
94Prov. 11kv G.O.Switch complete.
95Supply Part 3-Phase and 1-PhaseLT line(T.S. No 20/2023-24)
96Prov. RCC muff with concrete filling
97Prov. Eye Hook for earth wire
98Prov. Shackle Insulator (16 kN)
99Prov. D-Iron
100Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]
101Prov. L.T Stay wire@ 6Kg P/set
102Prov. L.T Stay Set complete
103Prov. Nut & Bolt off sizes.
104Prov. Superior PVC Sapacer
105Prov. Aluminium Paint
106Prov. Red Oxide
107Prov. Prov. Earthing Set Complete
108Supply Part 3-Phase and 1-PhaseLT line(T.S. No 21/2023-24)
109Prov. RCC muff with concrete filling
110Prov. Eye Hook for earth wire
111Prov. Shackle Insulator (16 kN)
112Prov. D-Iron
113Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]
114Prov. L.T Stay wire@ 6Kg P/set
115Prov. L.T Stay Set complete
116Prov. Nut & Bolt off sizes.
117Prov. Superior PVC Sapacer
118Prov. Aluminium Paint
119Prov. Red Oxide
120Prov. Prov. Earthing Set Complete
121Supply Part 3-Phase LT line(T.S. No 33/2023-24)
122Prov. RCC muff with concrete filling
123Prov. Eye Hook for earth wire
124Prov. Shackle Insulator (16 kN)
125Prov. D-Iron
126Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]
127Prov. L.T Stay wire@ 6Kg P/set
128Prov. L.T Stay Set complete
129Prov. Nut & Bolt off sizes.
130Prov. Superior PVC Sapacer
131Prov. Aluminium Paint
132Prov. Red Oxide
133Prov. Prov. Earthing Set Complete

AI Tender Summary

OUR REF NO 40449445
AUTHORITY Government Departments
TENDER VALUE 7.39 Lakhs
LAST DATE 07-11-2023
Authority
Authority Name Himachal Pradesh State Electricity Board
Work Description Tender For Providing & Erection For Sop To Tubewell At Village Kaloh Beli For Proposed 11 / 0.4 Kv 63 Kva Substation Along With 3-Phase And 1-Phase Lt Line And Sop To Tubewell Of Various Consumers At Village Shivpur And 3-Phase Lt Extension For Sop To Tubewell At Village Jindbar Under Esd Gagret. ( Bid No. Ged-80 / 2023-24 ) Name Of Scheme :- Sop To Tubewells Under ( Op ) Circle, Hpsebl, Una ( Phase-Iii
Basic Detail
Tender No GED-80/2023-24
Bidding Type Tender
Location
City gagret
State Himachal Pradesh
Key Dates
Publish Date 01 Nov 2023
Submission Date 07 Nov 2023
Open Date 08 Nov 2023
Finance
Tender Value 7.39 Lakhs
Tender Fee 590
EMD 7391
Exemption Not Available
Document List
95f8e2c5-8aac-4dc4-a278-1fdf5dd72191.html
B.rar
BOQ_120442.xls
Spc.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 01, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 07, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 08, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

95f8e2c5-8aac-4dc4-a278-1fdf5dd72191.html

rar

B.rar

xls

BOQ_120442.xls

pdf

Spc.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders