Tender For Construction Of Link Road Hatkoti Kenchi To Bathah Km 0.0 To 1.0 Sh Co Retaining Wall At Rd 0.226 To 0.270
Tender Overview
Project Description
Construction Of Link Road Hatkoti Kenchi To Bathah Km 0.0 To 1.0 Sh Co Retaining Wall At Rd 0.226 To 0.270 Co Link Road Hatkoti Kenchi To Bathah Km 0.0 To 1.0 Sh Co Retaining Wall At Rd 0.226 To 0.270 , Earthwork In Excavation For Structures As Per Drawing And Technical Specifications Clause 305.1 Including Setting Out, Construction Of Shoring And Bracing, Removal Of Stumps And Other Deleterious Material And Disposal Upto A Any Lead And Lift , Dressing Of Sides And Bottom And Backfilling In Trenches With Excavated Suitablematerial.Useful Material Available From Excavation To Be Properly Stacked And Handed Over To The Department Free Of Cost Including All Leads And Lifts, As Per Hppwd, Specification Of 1990 Volume-I Or As Directed By The Engineer-In-Charge , Stone Random Rubble Masonry Work In Cement Mortar 1:6 ( 1 Cement : 6 Sand ) In Foundation Complete As Per Drawing And Technical Specifications Clauses 702, 704, 1202 & 1203..Including Carriage Of Material With In All Leads And Lifts As Perdirection Of Engineer-In-Charge. , Providing And Laying Concrete For Plain / Reinforced Concrete 1;4:8 ( One Cement:Four Sand Eight Graded Crushed Stone Aggregate 25Mm ( Twenty Five Milimeter Nominal Size ) In Open Foundations Complete As Per Drawing And Technical Specification Clauses 802, 803, 1202 And 1203Includingcarriage Of Materialwith In All Leads And Liftsas Per Direction By The Engineer-In-Charge. , Backfilling With Granular Material Behind Abutment, Wing Wall And Return Wall Complete As Per Drawings & Technical Specification Clause 1204.3.8 Including All Leads And Lifts, As Per Hppwd, Specification Of 1990 Volume-I Or As Directed By The Engineer-In-Charge , Providing Weapholes In Brick Masonry / Stone Masonry / Plain Reinforced Concrete Abutment, Wing Wall, Return Wall With 100 Mm Dia Pvc Pipe Extending Through The Full With Of The Structures With Slop Of 1 ( V ) :20 ( H ) Towards Drawing Face Complete As Per Drawing And Technical Specification Clauses 614, 709, 1204.3.7Including All Leads And Lifts, Asdirected By The Engineer-In-Charge
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge |
| 2 | Stone Random Rubble Masonry work In cement mortar 1:6 (1 cement : 6 sand ) in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203..including carriage of material with in all leads and lifts as perdirection of Engineer-In-Charge. |
| 3 | Providing and Laying concrete for plain/reinforced concrete 1;4:8 (One cement:Four sand eight graded crushed stone aggregate 25mm (twenty five milimeter nominal size ) in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203includingcarriage of materialwith in all leads and liftsas per direction by the Engineer-In-Charge. |
| 4 | Backfilling with Granular material behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge |
| 5 | Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7including all leads and lifts, asdirected by the Engineer-In-Charge |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender