Power Development Department has published Tender For Fixing Of Rate Contract For Maintenance, Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division, Jpdcl Udhampur For The Financial Year 2023-24. Submission Date for this Tender is 15-11-2023. Civil Work Tenders in udhampur Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Erection/Maintenance of HT/LT Line & Creation/Augmentation of Substations |
2 | Erection ofPCC 8 Mtr Pole |
3 | Erection ofPCC 9 Mtr Pole |
4 | Erection ofPCC 11 Mtr Pole |
5 | Erection ofST 8 Mtr Pole |
6 | Erection ofST 9 Mtr Pole |
7 | Erection ofST 11 Mtr Pole |
8 | Erection ofST 13 Mtr Pole |
9 | Dismantling of PCC Pole 8 Mtr Long |
10 | Dismantling of PCC Pole 9 Mtr Long |
11 | Dismantling ofST Pole 8 Mtr Long |
12 | Dismantling ofST Pole 9 Mtr Long |
13 | Dismantling of ST Pole 11 Mtr Long |
14 | Unloading of PCC 8 Mtr Pole |
15 | Unloading of PCC 9 Mtr Pole |
16 | Unloading of PCC 11 Mtr Pole |
17 | Unloading of ST 8 Mtr Pole |
18 | Unloading of ST 9 Mtr Pole |
19 | Unloading of ST 11 Mtr Pole |
20 | Unloading of ST 13 Mtr Pole |
21 | loading of PCC 8 Mtr Pole |
22 | loading of PCC 9 Mtr Pole |
23 | loading of PCC 11 Mtr Pole |
24 | loading of ST 8 Mtr Pole |
25 | loading of ST 9 Mtr Pole |
26 | loading of ST 11 Mtr Pole |
27 | loading of ST 13 Mtr Pole |
28 | Average carriage of PCC 8 Mtr Pole upto 100 Mtr |
29 | Average carriage of PCC 8 Mtr Pole for subsequent 100 Mtr |
30 | Average carriage of PCC 9 Mtr Pole upto 100 Mtr |
31 | Average carriage of PCC 11 Mtr Pole upto 100 Mtr |
32 | Average carriage of ST 8 Mtr Pole upto 100 Mtr |
33 | Average carriage of ST 8 Mtr Pole for subsequent 100 Mtr |
34 | Average carriage of ST 9 Mtr Pole upto 100 Mtr |
35 | Average carriage of ST 9 Mtr Pole for subsequent 150 Mtr |
36 | Average carriage of ST 11 Mtr Pole upto 100 Mtr |
37 | Average carriage of ST 11 Mtr Pole upto (101-200) Mtr |
38 | Average carriage of ST 13 Mtr Pole upto 100Mtr |
39 | Average carriage of ST 13 Mtr Pole upto (101 -200) Mtr |
40 | Installation of Link Set |
41 | Installation of DO Set |
42 | Installation of HG Set |
43 | Installation of GO Set |
44 | Installation of LA Set |
45 | Average carriage of 25 KVA Transformerupto 100 Mtr |
46 | Average carriage of 63 KVATransformer upto 100 Mtr |
47 | Average carriage of 100 KVA Transformer upto 100 Mtr |
48 | Average carriage of 25 KVA Transformer for subsequent 100 Mtr |
49 | Average carriage of 63 KVA Transformer (101 - 200) Mtr |
50 | loading of 25 KVA Transformer |
51 | loading of 63 KVA Transformer |
52 | loading of 100 KVA Transformer |
53 | loading of 250 KVA Transformer |
54 | loading of 300 KVA Transformer |
55 | loading of 400 KVA Transformer |
56 | loading of 500 KVA Transformer |
57 | loading of 630 KVA Transformer |
58 | Unloading of 25 KVA Transformer |
59 | Unloading of 63 KVA Transformer |
60 | Unloading of 100 KVA Transformer |
61 | Unloading of 250 KVA Transformer |
62 | Unloading of 300 KVA Transformer |
63 | Unloading of 400 KVA Transformer |
64 | Unloading of 500 KVA Transformer |
65 | Unloading of 630 KVA Transformer |
66 | Mounting of 25KVA Transformer |
67 | Mounting of 63KVA Transformer |
68 | Mounting of 100KVA Transformer |
69 | Mounting of 250KVA Transformer |
70 | Mounting of 300KVA Transformer |
71 | Mounting of 400 KVA Transformer |
72 | Mounting of 500 KVA Transformer |
73 | Mounting of 630 KVA Transformer |
74 | Erection of Guys in HT Line |
75 | Erection of Guys in LT Line |
76 | Earthing of Substation complete (Poles, Transformer, CT/PT, LA) |
77 | Dismantling of Link Set |
78 | Dismantling of DO Set |
79 | Dismantling of G O Set |
80 | Dismantling of HG Set |
81 | Dismantling of LA Set |
82 | Erection of Jumper SetHT Side of 3 wire |
83 | Erection of Jumper Set LT Side of 4 wire |
84 | Dismantling of Jumper SetHT Side |
85 | Dismantling of Jumper Set LT Side |
86 | Dismounting of 25 KVA Transformer |
87 | Dismounting of 63KVA Transformer |
88 | Dismounting of 100KVA Transformer |
89 | Dismounting of 250KVA Transformer |
90 | Dismounting of 300KVA Transformer |
91 | Dismounting of 400KVA Transformer |
92 | Dismounting of 500KVA Transformer |
93 | Dismounting of 630KVA Transformer |
94 | laying and stringing of ACSRSquirrel Conductor |
95 | laying and stringing of ACSRWeasel Conductor |
96 | laying and stringing of ACSRRabbit Conductor |
97 | laying and stringing of ACSRDog Conductor |
98 | Dismantling of ACSRSquirrel Conductor |
99 | Dismantling of ACSRWeasel Conductor |
100 | Dismantling of ACSRRabbit Conductor |
101 | Dismantling of ACSRDog Conductor |
102 | Tightening of loose conductor Squirrel/Weasel |
103 | Tightening of loose conductor Rabbit/Dog |
104 | Route clearance |
105 | Fixing of LT Circuit Component of Substation (LT cables, Thimbles, Busbar, Shackle insulators) with Fuse Set / MCCBwith Box |
106 | Dismantling of LT Circuit Component of Substation (LT cables, Thimbles, Busbar, Shackle insulators) with Fuse Set / MCCBwith Box |
107 | Branch Cutting |
108 | Unloading T & Pitems i.eLine materials Substations/HT/LT lines |
109 | Loading T & Pitems i.eLine materials Substations/HT/LT lines |
110 | Average carriage ofT & Pitems i.eLine materials Substations/HT/LT linesupto 100 Mtr |
111 | Average carriage of T & Pitems i.eLine materials Substations/HT/LT lines for next 50 Mtr |
112 | Survey/Route Alignment |
113 | Drilling of Holes /Each |
114 | Fixing/Installation of 11 KV Disc Insulators with fittings |
115 | Dismantling of 11 KV Disc Insulators with fittings |
116 | Fixing of U-Clamps and Shackle Insulators |
117 | Dismantling of U-Clamps and Shackle Insulators |
118 | Fixing of 11 KV Pin Insulators with Pins |
119 | Dismantling of 11 KV Pin Insulators with Pins |
120 | Fixing of Top Clamps for Pin Insulators |
121 | Dismantling Fixing of Top Clamps for Pin Insulators |
122 | Fixing of Braces |
123 | Dismantlingof Braces |
124 | Fixing of Danger Plates |
125 | Dismantling of Danger Plates |
126 | Fixing of Anti Climbing DevicesPlates |
127 | Dismantlingof Anti Climbing Devices |
128 | Painting of Steel Tubular Poles Including Cross arms clamps etc. (Upto 9 Mtr.) |
129 | Painting of Steel Tubular Poles Including Cross arms clamps etc. (Above 9 Mtr.) |
130 | Painting of Cross arms and Clamps of PCC. |
131 | Providing of earthing (Spiral/Pipe/Rod Type) including fixing to the pole. |
132 | Fixing of Spacers for LV Lines (for 5 Wire System) |
133 | Fixing of Spacers for LV Lines (for 4 Wire System) |
134 | Fixing of Spacers for LV Lines (for 3 Wire System/ 2 wire System) |
135 | Fixing of Pre fabricated bracket and cross arm bed for placement of transformer (for transformers upto including 250 KVA) |
136 | Fixing ofMS/GI Channels 2/1 feet long along with Braces |
137 | Fixing of MS/GIChannels 5/4.5/4/3 feet long along with Braces |
138 | Fixing ofMS/GIChannels 10/9/7/6 feet long along with Braces |
139 | Fixing of MS/GIAngle Iron 9/8/7/6 feet long |
140 | Fixing ofMS/GI Angle Iron 5/ 4.5/ 3 feet long |
141 | Unloading of CT/PT Unit |
142 | Average carriage of CT/PT Unit upto 100 Mtr |
143 | Average carriage of CT/PT For subsequent 100 Mtr |
144 | Erection of CT/PT Unit along with Trivector Meter |
145 | Erection of CT PT Unit |
146 | Testing and commissioning of CT/PT Unit |
147 | Fixing of Suspension/Anchoring Clamps |
148 | Layingof HT AB Cable 35 mm sq |
149 | Laying of HT AB Cable 50 mm sq |
150 | Laying of HT AB Cable 70 mm sq |
151 | Laying of HT AB Cable 95 mm sq |
152 | Laying of HT AB Cable 120 mm sq |
153 | Laying of HT AB Cable 185 mm sq |
154 | Laying of HT AB Cable 300 mm sq |
155 | Laying of HT AB Cable 400 mm sq |
156 | Laying of HT XLPE Cable 35 mm sq |
157 | Laying of HT XLPE Cable 50 mm sq |
158 | Laying of HT XLPE Cable 70 mm sq |
159 | Laying of HT XLPE Cable 95 mm sq |
160 | Laying of HT XLPE Cable 120 mm sq |
161 | Laying of HT XLPE Cable 185mm sq |
162 | Laying of HT XLPE Cable 300 mm sq |
163 | Laying of HT XLPE Cable 400 mm sq |
164 | Laying of LT AB Cable 35 mm sq |
165 | Laying of LT AB Cable 50 mm sq |
166 | Laying ofLT AB Cable 70 mm sq |
167 | Laying ofLT AB Cable 95 mm sq |
168 | Laying ofLT AB Cable 120 mm sq |
169 | Laying of LT AB Cable 185 mm sq |
170 | Laying of LT AB Cable 300 mm sq |
171 | Laying of LT AB Cable 400 mm sq |
172 | Laying of LT XLPE Cable 35 mm sq |
173 | Laying of LT XLPE Cable 50 mm sq |
174 | Laying ofLT XLPE Cable 70 mm sq |
175 | Laying ofLT XLPE Cable 95 mm sq |
176 | Laying ofLT XLPE Cable 120 mm sq |
177 | Laying of LT XLPE Cable 185 mm sq |
178 | Laying of LT XLPE Cable 300 mm sq |
179 | Laying of LT XLPE Cable 400 mm sq |
180 | Dismantling & loading in Vehicles of HT AB Cable 35 mm sq |
181 | Dismantling & loading in Vehicles of HT AB Cable 50 mm sq |
182 | Dismantling & loading in Vehicles of HT AB Cable 70 mm sq |
183 | Dismantling & loading in Vehicles of HT AB Cable 95 mm sq |
184 | Dismantling & loading in Vehiclesof HT AB Cable 120 mm sq |
185 | Dismantling & loading in Vehiclesof HT AB Cable 185 mm sq |
186 | Dismantling & loading in Vehiclesof HT AB Cable 300 mm sq |
187 | Dismantling & loading in Vehiclesof HT AB Cable 400 mm sq |
188 | Dismantling & loading in Vehiclesof HT XLPE Cable 35 mm sq |
189 | Dismantling & loading in Vehiclesof HT XLPE Cable 50 mm sq |
190 | Dismantling & loading in Vehiclesof HT XLPE Cable 70 mm sq |
191 | Dismantling & loading in Vehiclesof HT XLPE Cable 95 mm sq |
192 | Dismantling & loading in Vehiclesof HT XLPE Cable 120 mm sq |
193 | Dismantling & loading in Vehicles of HT XLPE Cable 185mm sq |
194 | Dismantling & loading in Vehiclesof HT XLPE Cable 300 mm sq |
195 | Dismantling & loading in Vehiclesof HT XLPE Cable 400 mm sq |
196 | Dismantling & loading in Vehicles of LT AB Cable 35 mm sq |
197 | Dismantling & loading in Vehiclesof LT AB Cable 50 mm sq |
198 | Dismantling & loading in VehiclesofLT AB/ Cable 70 mm sq |
199 | Dismantling & loading in Vehicles ofLT AB Cable 95 mm sq |
200 | Dismantling & loading in VehiclesofLT AB Cable 120 mm sq |
201 | Dismantling & loading in Vehiclesof LT AB Cable 185 mm sq |
202 | Dismantling & loading in Vehiclesof LT AB Cable 300 mm sq |
203 | Dismantling & loading in Vehiclesof LT AB Cable 400 mm sq |
204 | Dismantling & loading in Vehiclesof LT XLPE Cable 35 mm sq |
205 | Dismantling & loading in Vehicles of LT XLPE Cable 50 mm sq |
206 | Dismantling & loading in VehiclesofLT XLPE Cable 70 mm sq |
207 | Dismantling & loading in VehiclesofLT XLPE Cable 95 mm sq |
208 | Dismantling & loading in VehiclesofLT XLPE Cable 120 mm sq |
209 | Dismantling & loading in Vehiclesof LT XLPE Cable 185 mm sq |
210 | Dismantling & loading in Vehiclesof LT XLPE Cable 300 mm sq |
211 | Dismantling & loading in Vehiclesof LT XLPE Cable 400 mm sq |
212 | Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines |
213 | Fixing of Straight Through Cable Jointing Kit for AB/XLPE cables ofLT Lines |
214 | Dismantling of Pin Insulators |
215 | Dismantling ofMS Channels 4.5/3 feet long along with Braces |
216 | Dismantling ofM S Angle Iron 9 feet long |
217 | DismantlingofMS Angle Iron 5/4.5/3 feet long |
218 | Fixing of IPC 120/50mm |
219 | Transportation of Write back of Dismantled Material to Divisional Store Udhampur |
220 | Laying of LT PVC Single Core Cable 95 mm sq for Dt"s |
221 | Laying of LT PVC Single Core Cable 185 mm sqfor Dt"s |
222 | Laying of LT PVC Single Core Cable 300 mm sqfor Dt"s |
223 | Laying of LT PVC Single Core Cable 400 mm sqfor Dt"s |
224 | Laying of LT PVC Single Core Cable 630 mm sq for Dt"s |
225 | Fixing of Al. Thimbles of different Sizes 95/120/150 mmfor Dt"s |
226 | Fixing of Al. Thimbles of different Sizes 185/240 mmfor Dt"s |
227 | Fixing of Al. Thimbles of different Sizes 300 mmfor DT"s |
228 | Fixing of Al. Thimbles of different Sizes 400 mm for Dt"s |
229 | Fixing of Al. Thimbles of different Sizes 630 mm for Dt"s |
230 | Stone Pad (300 mmx 300 mm x 75 mm) |
231 | Fixing of Aluminium Jointing Sleeves |
232 | Fixing of Suspension/Tension Clamp with eye hook |
233 | Fixing of Wedge connectors/PG Calmps |
234 | Fixing of GI Barbed wire for anti climbing |
235 | Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFU"s for Outgoing Corcuits |
236 | Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFU"s for Outgoing Corcuits |
237 | Fixing of LT Distribution Box for 400/ 500/630 KVA DTR with MCCB for incomer & SFU"s for Outgoing Corcuits |
238 | Fabrication & fixing of LT Switch made of angle Iron 50x50x6 with LT busbar 50x6mmon bus bar insulator |
239 | Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit |
240 | Dismantling of old 3-phase energy meter |
241 | Erection of Prodigy Meter |
242 | Dismantling of Prodigy Meter |
243 | Dismantling & reconnectingofservice lineduring repair works upto 15 mtr long |
244 | Fixing of 3-phase energy meter |
245 | Cement concrete 1:2:4 mixed with 60% Boulder for Construction of Platform for Transformer including Cost of materials (Cement, Bazri, stone & Sand) & Charges of Shuttering |
246 | Fixing of Bobin Insulator |
247 | Making & Fixing of cradle guard of 8 SWG G.I. Wire comprising of 10 no. cross pieces per spam including connection to earth on both side |
248 | Fabrication, Instalation, Testing and commissioning of LT fuse set comprising of requisite Al bus bar mounted on LT polymer insulator assembled on angle iron frame including necessary clamps |
249 | Straightening of 11 mtr long ST Pole (ST-410SP56) |
250 | Straightening of 9 mtr long ST Pole (ST-410SP33) |
251 | Straightening of 8 mtr long ST Pole (ST-410SP15) |
252 | Straightening of 9 mtr long PCC Pole |
253 | Straightening of 8 mtr long PCC Pole |
254 | Dismantling of HT/LT Leads |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy