Tender For Fixing Of Rate Contract For Maintenance, Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division, Jpdcl Udhampur For The Financial Year 2023-24, udhampur-Jammu And Kashmir

Power Development Department has published Tender For Fixing Of Rate Contract For Maintenance, Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division, Jpdcl Udhampur For The Financial Year 2023-24. Submission Date for this Tender is 15-11-2023. Civil Work Tenders in udhampur Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

40439338
Tender For Fixing Of Rate Contract For Maintenance, Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division, Jpdcl Udhampur For The Financial Year 2023-24
Open Tender
Indian
Jammu And Kashmir
udhampur
15-11-2023

Tender Details

Fixing Of Rate Contract For Maintenance, Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division, Jpdcl Udhampur For The Financial Year 2023-24- 1 Erection / Maintenance Of Ht / Lt Line & Creation / Augmentation Of Substations 2 Erection Ofpcc 8 Mtr Pole 3 Erection Ofpcc 9 Mtr Pole 4 Erection Ofpcc 11 Mtr Pole 5 Erection Ofst 8 Mtr Pole 6 Erection Ofst 9 Mtr Pole 7 Erection Ofst 11 Mtr Pole 8 Erection Ofst 13 Mtr Pole 9 Dismantling Of Pcc Pole 8 Mtr Long 10 Dismantling Of Pcc Pole 9 Mtr Long 11 Dismantling Ofst Pole 8 Mtr Long 12 Dismantling Ofst Pole 9 Mtr Long 13 Dismantling Of St Pole 11 Mtr Long 14 Unloading Of Pcc 8 Mtr Pole 15 Unloading Of Pcc 9 Mtr Pole 16 Unloading Of Pcc 11 Mtr Pole 17 Unloading Of St 8 Mtr Pole 18 Unloading Of St 9 Mtr Pole 19 Unloading Of St 11 Mtr Pole 20 Unloading Of St 13 Mtr Pole 21 Loading Of Pcc 8 Mtr Pole 22 Loading Of Pcc 9 Mtr Pole 23 Loading Of Pcc 11 Mtr Pole 24 Loading Of St 8 Mtr Pole 25 Loading Of St 9 Mtr Pole 26 Loading Of St 11 Mtr Pole 27 Loading Of St 13 Mtr Pole 28 Average Carriage Of Pcc 8 Mtr Pole Upto 100 Mtr 29 Average Carriage Of Pcc 8 Mtr Pole For Subsequent 100 Mtr 30 Average Carriage Of Pcc 9 Mtr Pole Upto 100 Mtr 31 Average Carriage Of Pcc 11 Mtr Pole Upto 100 Mtr 32 Average Carriage Of St 8 Mtr Pole Upto 100 Mtr 33 Average Carriage Of St 8 Mtr Pole For Subsequent 100 Mtr 34 Average Carriage Of St 9 Mtr Pole Upto 100 Mtr 35 Average Carriage Of St 9 Mtr Pole For Subsequent 150 Mtr 36 Average Carriage Of St 11 Mtr Pole Upto 100 Mtr 37 Average Carriage Of St 11 Mtr Pole Upto ( 101-200 ) Mtr 38 Average Carriage Of St 13 Mtr Pole Upto 100Mtr 39 Average Carriage Of St 13 Mtr Pole Upto ( 101 -200 ) Mtr 40 Installation Of Link Set 41 Installation Of Do Set 42 Installation Of Hg Set 43 Installation Of Go Set 44 Installation Of La Set 45 Average Carriage Of 25 Kva Transformerupto 100 Mtr 46 Average Carriage Of 63 Kvatransformer Upto 100 Mtr 47 Average Carriage Of 100 Kva Transformer Upto 100 Mtr 48 Average Carriage Of 25 Kva Transformer For Subsequent 100 Mtr 49 Average Carriage Of 63 Kva Transformer ( 101 - 200 ) Mtr 50 Loading Of 25 Kva Transformer 51 Loading Of 63 Kva Transformer 52 Loading Of 100 Kva Transformer 53 Loading Of 250 Kva Transformer 54 Loading Of 300 Kva Transformer 55 Loading Of 400 Kva Transformer 56 Loading Of 500 Kva Transformer 57 Loading Of 630 Kva Transformer 58 Unloading Of 25 Kva Transformer 59 Unloading Of 63 Kva Transformer 60 Unloading Of 100 Kva Transformer 61 Unloading Of 250 Kva Transformer 62 Unloading Of 300 Kva Transformer 63 Unloading Of 400 Kva Transformer 64 Unloading Of 500 Kva Transformer 65 Unloading Of 630 Kva Transformer 66 Mounting Of 25Kva Transformer 67 Mounting Of 63Kva Transformer 68 Mounting Of 100Kva Transformer 69 Mounting Of 250Kva Transformer 70 Mounting Of 300Kva Transformer 71 Mounting Of 400 Kva Transformer 72 Mounting Of 500 Kva Transformer 73 Mounting Of 630 Kva Transformer 74 Erection Of Guys In Ht Line 75 Erection Of Guys In Lt Line 76 Earthing Of Substation Complete ( Poles, Transformer, Ct / Pt, La ) 77 Dismantling Of Link Set 78 Dismantling Of Do Set 79 Dismantling Of G O Set 80 Dismantling Of Hg Set 81 Dismantling Of La Set 82 Erection Of Jumper Setht Side Of 3 Wire 83 Erection Of Jumper Set Lt Side Of 4 Wire 84 Dismantling Of Jumper Setht Side 85 Dismantling Of Jumper Set Lt Side 86 Dismounting Of 25 Kva Transformer 87 Dismounting Of 63Kva Transformer 88 Dismounting Of 100Kva Transformer 89 Dismounting Of 250Kva Transformer 90 Dismounting Of 300Kva Transformer 91 Dismounting Of 400Kva Transformer 92 Dismounting Of 500Kva Transformer 93 Dismounting Of 630Kva Transformer 94 Laying And Stringing Of Acsrsquirrel Conductor 95 Laying And Stringing Of Acsrweasel Conductor 96 Laying And Stringing Of Acsrrabbit Conductor 97 Laying And Stringing Of Acsrdog Conductor 98 Dismantling Of Acsrsquirrel Conductor 99 Dismantling Of Acsrweasel Conductor 100 Dismantling Of Acsrrabbit Conductor 101 Dismantling Of Acsrdog Conductor 102 Tightening Of Loose Conductor Squirrel / Weasel 103 Tightening Of Loose Conductor Rabbit / Dog 104 Route Clearance 105 Fixing Of Lt Circuit Component Of Substation ( Lt Cables, Thimbles, Busbar, Shackle Insulators ) With Fuse Set / Mccbwith Box 106 Dismantling Of Lt Circuit Component Of Substation ( Lt Cables, Thimbles, Busbar, Shackle Insulators ) With Fuse Set / Mccbwith Box 107 Branch Cutting 108 Unloading T & Pitems I.Eline Materials Substations / Ht / Lt Lines 109 Loading T & Pitems I.Eline Materials Substations / Ht / Lt Lines 110 Average Carriage Oft & Pitems I.Eline Materials Substations / Ht / Lt Linesupto 100 Mtr 111 Average Carriage Of T & Pitems I.Eline Materials Substations / Ht / Lt Lines For Next 50 Mtr 112 Survey / Route Alignment 113 Drilling Of Holes / Each 114 Fixing / Installation Of 11 Kv Disc Insulators With Fittings 115 Dismantling Of 11 Kv Disc Insulators With Fittings 116 Fixing Of U-Clamps And Shackle Insulators 117 Dismantling Of U-Clamps And Shackle Insulators 118 Fixing Of 11 Kv Pin Insulators With Pins 119 Dismantling Of 11 Kv Pin Insulators With Pins 120 Fixing Of Top Clamps For Pin Insulators 121 Dismantling Fixing Of Top Clamps For Pin Insulators 122 Fixing Of Braces 123 Dismantlingof Braces 124 Fixing Of Danger Plates 125 Dismantling Of Danger Plates 126 Fixing Of Anti Climbing Devicesplates 127 Dismantlingof Anti Climbing Devices 128 Painting Of Steel Tubular Poles Including Cross Arms Clamps Etc. ( Upto 9 Mtr. ) 129 Painting Of Steel Tubular Poles Including Cross Arms Clamps Etc. ( Above 9 Mtr. ) 130 Painting Of Cross Arms And Clamps Of Pcc. 131 Providing Of Earthing ( Spiral / Pipe / Rod Type ) Including Fixing To The Pole. 132 Fixing Of Spacers For Lv Lines ( For 5 Wire System ) 133 Fixing Of Spacers For Lv Lines ( For 4 Wire System ) 134 Fixing Of Spacers For Lv Lines ( For 3 Wire System / 2 Wire System ) 135 Fixing Of Pre Fabricated Bracket And Cross Arm Bed For Placement Of Transformer ( For Transformers Upto Including 250 Kva ) 136 Fixing Ofms / Gi Channels 2 / 1 Feet Long Along With Braces 137 Fixing Of Ms / Gichannels 5 / 4.5 / 4 / 3 Feet Long Along With Braces 138 Fixing Ofms / Gichannels 10 / 9 / 7 / 6 Feet Long Along With Braces 139 Fixing Of Ms / Giangle Iron 9 / 8 / 7 / 6 Feet Long 140 Fixing Ofms / Gi Angle Iron 5 / 4.5 / 3 Feet Long 141 Unloading Of Ct / Pt Unit 142 Average Carriage Of Ct / Pt Unit Upto 100 Mtr 143 Average Carriage Of Ct / Pt For Subsequent 100 Mtr 144 Erection Of Ct / Pt Unit Along With Trivector Meter 145 Erection Of Ct Pt Unit 146 Testing And Commissioning Of Ct / Pt Unit 147 Fixing Of Suspension / Anchoring Clamps 148 Layingof Ht Ab Cable 35 Mm Sq 149 Laying Of Ht Ab Cable 50 Mm Sq 150 Laying Of Ht Ab Cable 70 Mm Sq 151 Laying Of Ht Ab Cable 95 Mm Sq 152 Laying Of Ht Ab Cable 120 Mm Sq 153 Laying Of Ht Ab Cable 185 Mm Sq 154 Laying Of Ht Ab Cable 300 Mm Sq 155 Laying Of Ht Ab Cable 400 Mm Sq 156 Laying Of Ht Xlpe Cable 35 Mm Sq 157 Laying Of Ht Xlpe Cable 50 Mm Sq 158 Laying Of Ht Xlpe Cable 70 Mm Sq 159 Laying Of Ht Xlpe Cable 95 Mm Sq 160 Laying Of Ht Xlpe Cable 120 Mm Sq 161 Laying Of Ht Xlpe Cable 185Mm Sq 162 Laying Of Ht Xlpe Cable 300 Mm Sq 163 Laying Of Ht Xlpe Cable 400 Mm Sq 164 Laying Of Lt Ab Cable 35 Mm Sq 165 Laying Of Lt Ab Cable 50 Mm Sq 166 Laying Oflt Ab Cable 70 Mm Sq 167 Laying Oflt Ab Cable 95 Mm Sq 168 Laying Oflt Ab Cable 120 Mm Sq 169 Laying Of Lt Ab Cable 185 Mm Sq 170 Laying Of Lt Ab Cable 300 Mm Sq 171 Laying Of Lt Ab Cable 400 Mm Sq 172 Laying Of Lt Xlpe Cable 35 Mm Sq 173 Laying Of Lt Xlpe Cable 50 Mm Sq 174 Laying Oflt Xlpe Cable 70 Mm Sq 175 Laying Oflt Xlpe Cable 95 Mm Sq 176 Laying Oflt Xlpe Cable 120 Mm Sq 177 Laying Of Lt Xlpe Cable 185 Mm Sq 178 Laying Of Lt Xlpe Cable 300 Mm Sq 179 Laying Of Lt Xlpe Cable 400 Mm Sq 180 Dismantling & Loading In Vehicles Of Ht Ab Cable 35 Mm Sq 181 Dismantling & Loading In Vehicles Of Ht Ab Cable 50 Mm Sq 182 Dismantling & Loading In Vehicles Of Ht Ab Cable 70 Mm Sq 183 Dismantling & Loading In Vehicles Of Ht Ab Cable 95 Mm Sq 184 Dismantling & Loading In Vehiclesof Ht Ab Cable 120 Mm Sq 185 Dismantling & Loading In Vehiclesof Ht Ab Cable 185 Mm Sq 186 Dismantling & Loading In Vehiclesof Ht Ab Cable 300 Mm Sq 187 Dismantling & Loading In Vehiclesof Ht Ab Cable 400 Mm Sq 188 Dismantling & Loading In Vehiclesof Ht Xlpe Cable 35 Mm Sq 189 Dismantling & Loading In Vehiclesof Ht Xlpe Cable 50 Mm Sq 190 Dismantling & Loading In Vehiclesof Ht Xlpe Cable 70 Mm Sq 191 Dismantling & Loading In Vehiclesof Ht Xlpe Cable 95 Mm Sq 192 Dismantling & Loading In Vehiclesof Ht Xlpe Cable 120 Mm Sq 193 Dismantling & Loading In Vehicles Of Ht Xlpe Cable 185Mm Sq 194 Dismantling & Loading In Vehiclesof Ht Xlpe Cable 300 Mm Sq 195 Dismantling & Loading In Vehiclesof Ht Xlpe Cable 400 Mm Sq 196 Dismantling & Loading In Vehicles Of Lt Ab Cable 35 Mm Sq 197 Dismantling & Loading In Vehiclesof Lt Ab Cable 50 Mm Sq 198 Dismantling & Loading In Vehiclesoflt Ab / Cable 70 Mm Sq 199 Dismantling & Loading In Vehicles Oflt Ab Cable 95 Mm Sq 200 Dismantling & Loading In Vehiclesoflt Ab Cable 120 Mm Sq 201 Dismantling & Loading In Vehiclesof Lt Ab Cable 185 Mm Sq 202 Dismantling & Loading In Vehiclesof Lt Ab Cable 300 Mm Sq 203 Dismantling & Loading In Vehiclesof Lt Ab Cable 400 Mm Sq 204 Dismantling & Loading In Vehiclesof Lt Xlpe Cable 35 Mm Sq 205 Dismantling & Loading In Vehicles Of Lt Xlpe Cable 50 Mm Sq 206 Dismantling & Loading In Vehiclesoflt Xlpe Cable 70 Mm Sq 207 Dismantling & Loading In Vehiclesoflt Xlpe Cable 95 Mm Sq 208 Dismantling & Loading In Vehiclesoflt Xlpe Cable 120 Mm Sq 209 Dismantling & Loading In Vehiclesof Lt Xlpe Cable 185 Mm Sq 210 Dismantling & Loading In Vehiclesof Lt Xlpe Cable 300 Mm Sq 211 Dismantling & Loading In Vehiclesof Lt Xlpe Cable 400 Mm Sq 212 Fixing Of Heat Shrinkable Outdoor Kit For Ab / Xlpe Cables Ofht Lines 213 Fixing Of Straight Through Cable Jointing Kit For Ab / Xlpe Cables Oflt Lines 214 Dismantling Of Pin Insulators 215 Dismantling Ofms Channels 4.5 / 3 Feet Long Along With Braces 216 Dismantling Ofm S Angle Iron 9 Feet Long 217 Dismantlingofms Angle Iron 5 / 4.5 / 3 Feet Long 218 Fixing Of Ipc 120 / 50Mm 219 Transportation Of Write Back Of Dismantled Material To Divisional Store Udhampur 220 Laying Of Lt Pvc Single Core Cable 95 Mm Sq For DtS 221 Laying Of Lt Pvc Single Core Cable 185 Mm Sqfor DtS 222 Laying Of Lt Pvc Single Core Cable 300 Mm Sqfor DtS 223 Laying Of Lt Pvc Single Core Cable 400 Mm Sqfor DtS 224 Laying Of Lt Pvc Single Core Cable 630 Mm Sq For DtS 225 Fixing Of Al. Thimbles Of Different Sizes 95 / 120 / 150 Mmfor DtS 226 Fixing Of Al. Thimbles Of Different Sizes 185 / 240 Mmfor DtS 227 Fixing Of Al. Thimbles Of Different Sizes 300 Mmfor DtS 228 Fixing Of Al. Thimbles Of Different Sizes 400 Mm For DtS 229 Fixing Of Al. Thimbles Of Different Sizes 630 Mm For DtS 230 Stone Pad ( 300 Mmx 300 Mm X 75 Mm ) 231 Fixing Of Aluminium Jointing Sleeves 232 Fixing Of Suspension / Tension Clamp With Eye Hook 233 Fixing Of Wedge Connectors / Pg Calmps 234 Fixing Of Gi Barbed Wire For Anti Climbing 235 Fixing Of Lt Distribution Box For 63 / 100 Kva Dtr With Mccb For Incomer & SfuS For Outgoing Corcuits 236 Fixing Of Lt Distribution Box For 200 / 250 / 300 / 400 Kva Dtr With Mccb For Incomer & SfuS For Outgoing Corcuits 237 Fixing Of Lt Distribution Box For 400 / 500 / 630 Kva Dtr With Mccb For Incomer & SfuS For Outgoing Corcuits 238 Fabrication & Fixing Of Lt Switch Made Of Angle Iron 50X50x6 With Lt Busbar 50X6mmon Bus Bar Insulator 239 Fixing Of 32 / 63 Amps Tpn Switch Disconnector Fuse Unit 240 Dismantling Of Old 3-Phase Energy Meter 241 Erection Of Prodigy Meter 242 Dismantling Of Prodigy Meter 243 Dismantling & Reconnectingofservice Lineduring Repair Works Upto 15 Mtr Long 244 Fixing Of 3-Phase Energy Meter 245 Cement Concrete 1:2:4 Mixed With 60% Boulder For Construction Of Platform For Transformer Including Cost Of Materials ( Cement, Bazri, Stone & Sand ) & Charges Of Shuttering 246 Fixing Of Bobin Insulator 247 Making & Fixing Of Cradle Guard Of 8 Swg G.I. Wire Comprising Of 10 No. Cross Pieces Per Spam Including Connection To Earth On Both Side 248 Fabrication, Instalation, Testing And Commissioning Of Lt Fuse Set Comprising Of Requisite Al Bus Bar Mounted On Lt Polymer Insulator Assembled On Angle Iron Frame Including Necessary Clamps 249 Straightening Of 11 Mtr Long St Pole ( St-410Sp56 ) 250 Straightening Of 9 Mtr Long St Pole ( St-410Sp33 ) 251 Straightening Of 8 Mtr Long St Pole ( St-410Sp15 ) 252 Straightening Of 9 Mtr Long Pcc Pole 253 Straightening Of 8 Mtr Long Pcc Pole 254 Dismantling Of Ht / Lt Leads

Key Value

Document Fees
INR 1000 /-
EMD
INR 60000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Fixing of Rate Contract for Maintenance, Restoration and Works of Emergent nature of Distribution Network in the Jurisdiction of Electric Division, JPDCL Udhampur for the financial year 2023-24.
Sl. No. Item Description
1Erection/Maintenance of HT/LT Line & Creation/Augmentation of Substations
2Erection ofPCC 8 Mtr Pole
3Erection ofPCC 9 Mtr Pole
4Erection ofPCC 11 Mtr Pole
5Erection ofST 8 Mtr Pole
6Erection ofST 9 Mtr Pole
7Erection ofST 11 Mtr Pole
8Erection ofST 13 Mtr Pole
9Dismantling of PCC Pole 8 Mtr Long
10Dismantling of PCC Pole 9 Mtr Long
11Dismantling ofST Pole 8 Mtr Long
12Dismantling ofST Pole 9 Mtr Long
13Dismantling of ST Pole 11 Mtr Long
14Unloading of PCC 8 Mtr Pole
15Unloading of PCC 9 Mtr Pole
16Unloading of PCC 11 Mtr Pole
17Unloading of ST 8 Mtr Pole
18Unloading of ST 9 Mtr Pole
19Unloading of ST 11 Mtr Pole
20Unloading of ST 13 Mtr Pole
21loading of PCC 8 Mtr Pole
22loading of PCC 9 Mtr Pole
23loading of PCC 11 Mtr Pole
24loading of ST 8 Mtr Pole
25loading of ST 9 Mtr Pole
26loading of ST 11 Mtr Pole
27loading of ST 13 Mtr Pole
28Average carriage of PCC 8 Mtr Pole upto 100 Mtr
29Average carriage of PCC 8 Mtr Pole for subsequent 100 Mtr
30Average carriage of PCC 9 Mtr Pole upto 100 Mtr
31Average carriage of PCC 11 Mtr Pole upto 100 Mtr
32Average carriage of ST 8 Mtr Pole upto 100 Mtr
33Average carriage of ST 8 Mtr Pole for subsequent 100 Mtr
34Average carriage of ST 9 Mtr Pole upto 100 Mtr
35Average carriage of ST 9 Mtr Pole for subsequent 150 Mtr
36Average carriage of ST 11 Mtr Pole upto 100 Mtr
37Average carriage of ST 11 Mtr Pole upto (101-200) Mtr
38Average carriage of ST 13 Mtr Pole upto 100Mtr
39Average carriage of ST 13 Mtr Pole upto (101 -200) Mtr
40Installation of Link Set
41Installation of DO Set
42Installation of HG Set
43Installation of GO Set
44Installation of LA Set
45Average carriage of 25 KVA Transformerupto 100 Mtr
46Average carriage of 63 KVATransformer upto 100 Mtr
47Average carriage of 100 KVA Transformer upto 100 Mtr
48Average carriage of 25 KVA Transformer for subsequent 100 Mtr
49Average carriage of 63 KVA Transformer (101 - 200) Mtr
50loading of 25 KVA Transformer
51loading of 63 KVA Transformer
52loading of 100 KVA Transformer
53loading of 250 KVA Transformer
54loading of 300 KVA Transformer
55loading of 400 KVA Transformer
56loading of 500 KVA Transformer
57loading of 630 KVA Transformer
58Unloading of 25 KVA Transformer
59Unloading of 63 KVA Transformer
60Unloading of 100 KVA Transformer
61Unloading of 250 KVA Transformer
62Unloading of 300 KVA Transformer
63Unloading of 400 KVA Transformer
64Unloading of 500 KVA Transformer
65Unloading of 630 KVA Transformer
66Mounting of 25KVA Transformer
67Mounting of 63KVA Transformer
68Mounting of 100KVA Transformer
69Mounting of 250KVA Transformer
70Mounting of 300KVA Transformer
71Mounting of 400 KVA Transformer
72Mounting of 500 KVA Transformer
73Mounting of 630 KVA Transformer
74Erection of Guys in HT Line
75Erection of Guys in LT Line
76Earthing of Substation complete (Poles, Transformer, CT/PT, LA)
77Dismantling of Link Set
78Dismantling of DO Set
79Dismantling of G O Set
80Dismantling of HG Set
81Dismantling of LA Set
82Erection of Jumper SetHT Side of 3 wire
83Erection of Jumper Set LT Side of 4 wire
84Dismantling of Jumper SetHT Side
85Dismantling of Jumper Set LT Side
86Dismounting of 25 KVA Transformer
87Dismounting of 63KVA Transformer
88Dismounting of 100KVA Transformer
89Dismounting of 250KVA Transformer
90Dismounting of 300KVA Transformer
91Dismounting of 400KVA Transformer
92Dismounting of 500KVA Transformer
93Dismounting of 630KVA Transformer
94laying and stringing of ACSRSquirrel Conductor
95laying and stringing of ACSRWeasel Conductor
96laying and stringing of ACSRRabbit Conductor
97laying and stringing of ACSRDog Conductor
98Dismantling of ACSRSquirrel Conductor
99Dismantling of ACSRWeasel Conductor
100Dismantling of ACSRRabbit Conductor
101Dismantling of ACSRDog Conductor
102Tightening of loose conductor Squirrel/Weasel
103Tightening of loose conductor Rabbit/Dog
104Route clearance
105Fixing of LT Circuit Component of Substation (LT cables, Thimbles, Busbar, Shackle insulators) with Fuse Set / MCCBwith Box
106Dismantling of LT Circuit Component of Substation (LT cables, Thimbles, Busbar, Shackle insulators) with Fuse Set / MCCBwith Box
107Branch Cutting
108Unloading T & Pitems i.eLine materials Substations/HT/LT lines
109Loading T & Pitems i.eLine materials Substations/HT/LT lines
110Average carriage ofT & Pitems i.eLine materials Substations/HT/LT linesupto 100 Mtr
111Average carriage of T & Pitems i.eLine materials Substations/HT/LT lines for next 50 Mtr
112Survey/Route Alignment
113Drilling of Holes /Each
114Fixing/Installation of 11 KV Disc Insulators with fittings
115Dismantling of 11 KV Disc Insulators with fittings
116Fixing of U-Clamps and Shackle Insulators
117Dismantling of U-Clamps and Shackle Insulators
118Fixing of 11 KV Pin Insulators with Pins
119Dismantling of 11 KV Pin Insulators with Pins
120Fixing of Top Clamps for Pin Insulators
121Dismantling Fixing of Top Clamps for Pin Insulators
122Fixing of Braces
123Dismantlingof Braces
124Fixing of Danger Plates
125Dismantling of Danger Plates
126Fixing of Anti Climbing DevicesPlates
127Dismantlingof Anti Climbing Devices
128Painting of Steel Tubular Poles Including Cross arms clamps etc. (Upto 9 Mtr.)
129Painting of Steel Tubular Poles Including Cross arms clamps etc. (Above 9 Mtr.)
130Painting of Cross arms and Clamps of PCC.
131Providing of earthing (Spiral/Pipe/Rod Type) including fixing to the pole.
132Fixing of Spacers for LV Lines (for 5 Wire System)
133Fixing of Spacers for LV Lines (for 4 Wire System)
134Fixing of Spacers for LV Lines (for 3 Wire System/ 2 wire System)
135Fixing of Pre fabricated bracket and cross arm bed for placement of transformer (for transformers upto including 250 KVA)
136Fixing ofMS/GI Channels 2/1 feet long along with Braces
137Fixing of MS/GIChannels 5/4.5/4/3 feet long along with Braces
138Fixing ofMS/GIChannels 10/9/7/6 feet long along with Braces
139Fixing of MS/GIAngle Iron 9/8/7/6 feet long
140Fixing ofMS/GI Angle Iron 5/ 4.5/ 3 feet long
141Unloading of CT/PT Unit
142Average carriage of CT/PT Unit upto 100 Mtr
143Average carriage of CT/PT For subsequent 100 Mtr
144Erection of CT/PT Unit along with Trivector Meter
145Erection of CT PT Unit
146Testing and commissioning of CT/PT Unit
147Fixing of Suspension/Anchoring Clamps
148Layingof HT AB Cable 35 mm sq
149Laying of HT AB Cable 50 mm sq
150Laying of HT AB Cable 70 mm sq
151Laying of HT AB Cable 95 mm sq
152Laying of HT AB Cable 120 mm sq
153Laying of HT AB Cable 185 mm sq
154Laying of HT AB Cable 300 mm sq
155Laying of HT AB Cable 400 mm sq
156Laying of HT XLPE Cable 35 mm sq
157Laying of HT XLPE Cable 50 mm sq
158Laying of HT XLPE Cable 70 mm sq
159Laying of HT XLPE Cable 95 mm sq
160Laying of HT XLPE Cable 120 mm sq
161Laying of HT XLPE Cable 185mm sq
162Laying of HT XLPE Cable 300 mm sq
163Laying of HT XLPE Cable 400 mm sq
164Laying of LT AB Cable 35 mm sq
165Laying of LT AB Cable 50 mm sq
166Laying ofLT AB Cable 70 mm sq
167Laying ofLT AB Cable 95 mm sq
168Laying ofLT AB Cable 120 mm sq
169Laying of LT AB Cable 185 mm sq
170Laying of LT AB Cable 300 mm sq
171Laying of LT AB Cable 400 mm sq
172Laying of LT XLPE Cable 35 mm sq
173Laying of LT XLPE Cable 50 mm sq
174Laying ofLT XLPE Cable 70 mm sq
175Laying ofLT XLPE Cable 95 mm sq
176Laying ofLT XLPE Cable 120 mm sq
177Laying of LT XLPE Cable 185 mm sq
178Laying of LT XLPE Cable 300 mm sq
179Laying of LT XLPE Cable 400 mm sq
180Dismantling & loading in Vehicles of HT AB Cable 35 mm sq
181Dismantling & loading in Vehicles of HT AB Cable 50 mm sq
182Dismantling & loading in Vehicles of HT AB Cable 70 mm sq
183Dismantling & loading in Vehicles of HT AB Cable 95 mm sq
184Dismantling & loading in Vehiclesof HT AB Cable 120 mm sq
185Dismantling & loading in Vehiclesof HT AB Cable 185 mm sq
186Dismantling & loading in Vehiclesof HT AB Cable 300 mm sq
187Dismantling & loading in Vehiclesof HT AB Cable 400 mm sq
188Dismantling & loading in Vehiclesof HT XLPE Cable 35 mm sq
189Dismantling & loading in Vehiclesof HT XLPE Cable 50 mm sq
190Dismantling & loading in Vehiclesof HT XLPE Cable 70 mm sq
191Dismantling & loading in Vehiclesof HT XLPE Cable 95 mm sq
192Dismantling & loading in Vehiclesof HT XLPE Cable 120 mm sq
193Dismantling & loading in Vehicles of HT XLPE Cable 185mm sq
194Dismantling & loading in Vehiclesof HT XLPE Cable 300 mm sq
195Dismantling & loading in Vehiclesof HT XLPE Cable 400 mm sq
196Dismantling & loading in Vehicles of LT AB Cable 35 mm sq
197Dismantling & loading in Vehiclesof LT AB Cable 50 mm sq
198Dismantling & loading in VehiclesofLT AB/ Cable 70 mm sq
199Dismantling & loading in Vehicles ofLT AB Cable 95 mm sq
200Dismantling & loading in VehiclesofLT AB Cable 120 mm sq
201Dismantling & loading in Vehiclesof LT AB Cable 185 mm sq
202Dismantling & loading in Vehiclesof LT AB Cable 300 mm sq
203Dismantling & loading in Vehiclesof LT AB Cable 400 mm sq
204Dismantling & loading in Vehiclesof LT XLPE Cable 35 mm sq
205Dismantling & loading in Vehicles of LT XLPE Cable 50 mm sq
206Dismantling & loading in VehiclesofLT XLPE Cable 70 mm sq
207Dismantling & loading in VehiclesofLT XLPE Cable 95 mm sq
208Dismantling & loading in VehiclesofLT XLPE Cable 120 mm sq
209Dismantling & loading in Vehiclesof LT XLPE Cable 185 mm sq
210Dismantling & loading in Vehiclesof LT XLPE Cable 300 mm sq
211Dismantling & loading in Vehiclesof LT XLPE Cable 400 mm sq
212Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines
213Fixing of Straight Through Cable Jointing Kit for AB/XLPE cables ofLT Lines
214Dismantling of Pin Insulators
215Dismantling ofMS Channels 4.5/3 feet long along with Braces
216Dismantling ofM S Angle Iron 9 feet long
217DismantlingofMS Angle Iron 5/4.5/3 feet long
218Fixing of IPC 120/50mm
219Transportation of Write back of Dismantled Material to Divisional Store Udhampur
220Laying of LT PVC Single Core Cable 95 mm sq for Dt"s
221Laying of LT PVC Single Core Cable 185 mm sqfor Dt"s
222Laying of LT PVC Single Core Cable 300 mm sqfor Dt"s
223Laying of LT PVC Single Core Cable 400 mm sqfor Dt"s
224Laying of LT PVC Single Core Cable 630 mm sq for Dt"s
225Fixing of Al. Thimbles of different Sizes 95/120/150 mmfor Dt"s
226Fixing of Al. Thimbles of different Sizes 185/240 mmfor Dt"s
227Fixing of Al. Thimbles of different Sizes 300 mmfor DT"s
228Fixing of Al. Thimbles of different Sizes 400 mm for Dt"s
229Fixing of Al. Thimbles of different Sizes 630 mm for Dt"s
230Stone Pad (300 mmx 300 mm x 75 mm)
231Fixing of Aluminium Jointing Sleeves
232Fixing of Suspension/Tension Clamp with eye hook
233Fixing of Wedge connectors/PG Calmps
234Fixing of GI Barbed wire for anti climbing
235Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFU"s for Outgoing Corcuits
236Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFU"s for Outgoing Corcuits
237Fixing of LT Distribution Box for 400/ 500/630 KVA DTR with MCCB for incomer & SFU"s for Outgoing Corcuits
238Fabrication & fixing of LT Switch made of angle Iron 50x50x6 with LT busbar 50x6mmon bus bar insulator
239Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit
240Dismantling of old 3-phase energy meter
241Erection of Prodigy Meter
242Dismantling of Prodigy Meter
243Dismantling & reconnectingofservice lineduring repair works upto 15 mtr long
244Fixing of 3-phase energy meter
245Cement concrete 1:2:4 mixed with 60% Boulder for Construction of Platform for Transformer including Cost of materials (Cement, Bazri, stone & Sand) & Charges of Shuttering
246Fixing of Bobin Insulator
247Making & Fixing of cradle guard of 8 SWG G.I. Wire comprising of 10 no. cross pieces per spam including connection to earth on both side
248Fabrication, Instalation, Testing and commissioning of LT fuse set comprising of requisite Al bus bar mounted on LT polymer insulator assembled on angle iron frame including necessary clamps
249Straightening of 11 mtr long ST Pole (ST-410SP56)
250Straightening of 9 mtr long ST Pole (ST-410SP33)
251Straightening of 8 mtr long ST Pole (ST-410SP15)
252Straightening of 9 mtr long PCC Pole
253Straightening of 8 mtr long PCC Pole
254Dismantling of HT/LT Leads
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail