| 1 | Erection of 11/.4KV, 63 KVA S/Stn.inVill Dagla |
| 2 | Erection of 63 KVA S/Stn. i.e. digging of pit for pole & earthing two No. poles & 3 Nos. for earthdrilling of holes in X-arms, preparation of plateform str. Members C.I., A.L. i.e. X-arms & K.B. set, errection of D/P, concreating of RCC muff errection of plateform, errection of X-arms, D.O., L.A., MCCB, Switch LT box, energy meter, errection of transformer, earthing connection to G.O. switch, Transformer L.A. etc., errection of stay set, jumper, pipe earthing 3 Nos set, L.T. cable, barbed wire and painting complete in all respect. |
| 3 | Mannual carriage of 63 KVA pole mounted distribution S/Stn. average distance (0.400 KM) ST poles, X-arms, G.O. Switch, LT cable, plate for fitting , earthing set, LT box, insulators & stay set etc. with 25 KVA Transformer |
| 4 | Loading & unloading of poles & others materials of S/Stn. |
| 5 | Erection of HT Line |
| 6 | Erection of 9 Mtr. Steel TublerPolei.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clump, barbed wire, danger plate, drilling of holes and filling of pit + ramming , painting of pole complete in all respect. |
| 7 | Erection of Stay set HT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning. |
| 8 | Fixing of jumper |
| 9 | Laying stringing and sagging of AAAC/ACSR/50mm (3Wire) of 11KV,HT Line laying of conductor,dtringing and sagging binding with insulator making jumper on dead poles etc. complete in all respect (Rate to be quoted in KM) |
| 10 | Laying stringing and sagging of GI Wire (1Wire) of 11KV,HT Line laying of conductor,dtringing and sagging binding with insulator making jumper on dead poles etc. complete in all respect (Rate to be quoted in KM) |
| 11 | Mannual carriage of 11KV HT Line Materials on steel tubular pole for an average lead of 1KM from road head to site of work i.e 200M (Rate to be quoted in KM) |
| 12 | Loading & unloading of poles & others materials of 11KV HT Line |
| 13 | Erection of LT Line |
| 14 | Erection of 8 Mtr. Steel TublerPolei.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clump, barbed wire, danger plate, drilling of holes and filling of pit + ramming , painting of pole complete in all respect. |
| 15 | Erection of Stay set LT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning. |
| 16 | Laying stringing and sagging of AAAC/ACSR/50mm (4Wire) of LT Line laying of conductor,dtringing and sagging binding with insulator making jumper on dead poles etc. complete in all respect (Rate to be quoted in KM) |
| 17 | Mannual carriage of LT Line Materials on steel tubular pole for an average lead of 1KM from road head to site of work i.e 200M (Rate to be quoted in KM) |
| 18 | Loading & unloading of poles & others materials of LT Line |
| 19 | PROVIDING & SUPPLY OF MATERIALS |
| 20 | 11/0.4KV,63KVA S/stn |
| 21 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 22 | Prov. MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s |
| 23 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 24 | Prov. Transformer Bed, Belting & Knee Bracing |
| 25 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed |
| 26 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer] |
| 27 | Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 28 | Prov. MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos |
| 29 | Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 30 | Prov. Transformer LT Distribution Box and GO Switch fixing Assembly |
| 31 | Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 32 | Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 33 | Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 34 | Prov. G.O. SwitchComp. |
| 35 | Prov. D.O. fuse unit Comp. |
| 36 | Prov. S/Stn. pipe earthing i/c earthing plate with GI wire Charcole & salt complete in all respect |
| 37 | Prov. L.As. (3 Nos) comp.set. |
| 38 | Prov. Almunium Paint |
| 39 | Prov. S/Stn. plinth protection |
| 40 | Prov. RCC Muffs |
| 41 | 11KV HT Line |
| 42 | Prov. RCC Muffs |
| 43 | Prov. & fabrication of X-Arm (Channel iron 100X50X6mm for S/P Str. |
| 44 | Prov. & fabrication of Angle iron 50X50X6mmi/c clamp for single pole |
| 45 | Pole Top Bracket 100X50X6mm |
| 46 | Prov. Pin Insulator with GI Pin |
| 47 | Prov.. GI Wire 8 SWG |
| 48 | Prov. M/S Nutt & Bolts off sizes |
| 49 | Prov. Almunium Paint |
| 50 | Supply Parts Of LT Line |
| 51 | Prov. D.I. iron with shackle insulator. |
| 52 | Prov. RCC Muff with concrete filling |
| 53 | Prov. M/S Nutt & Bolts off sizes |
| 54 | Prov. Angle Iron (75X40X6mm) |