Distribution Pipe Line In Pottalkalam Andproviding Borewell Withmini Power Pump Ward.7, 10 At B.Meenatchipuram Town Panchayat.; 1 Earth Work Excavation In Allsoils And Sub Soils Exceipt Hard Rockrequiring Blasting With Intial Lead And Lift Including Re-Filling The Sides Offoundationin Layers Of 15Cm Thick Watering, Ramming, Depositing The Surplus Earth In The Premises As Directed By Departmental Officers Etc., Complete Asper Standard Specification. As Per Ss 20 B Tndss No: 23 & 24 Vi ( S2 ) , Vii 9, 10 2 Plain Cement Concrete Using1:4:8 Mix ( One Cement, Four Sand Eight Aggregates ) Using 40Mm Iss Gauge Hbg Metal Including Cost Andconveyance Of All Materials To Work Site And All Labour Charges For Mixing, Laying, Consolidating And Curing Etc., Complete As Per Standard Specification. Tndss No: 28 V, Vi ( S2 ) V, Vi ( S5a ) Vii 3 Supply And Fabrication And Placing In Position Of Tmtsteel Roads To Required Size And Length As Directed By The Departamental Officers Including Cost Of Binding Wire, Cutting, Bending And Tying Etc., Inclduing Cost And Conveyance Of All Materials To Side And All Labour Charges Etc., Complete As Per Standard Specificationtndss No: 97 V.Vi ( S6 ) Vii ( S^ ) Vii-3 4 Supplying And Erecting Centering For Sides And Soffits Including Supports And Strutting Upto 3 M Height For Plain Surfaces Such As Rcc Slab. Rectangular Beams, . Tee Beam ( Or ) L Beams Lintel, .Bed Block, Slabs Landing Slabs Square Or Round Column Etc., As Detalied Below With All Cross Bracings Using M.S.Sheets Of Size 90 Cm X 60 Cm And Bg 10 Stiffened With Welded M.S.Angles Of Size 25X225x3 Mm For Boarding Laid Over Silver Oak Or Countrey Wood Joists Of 10Cm To 13Cm Dia Spaced At An Intervals Of 75 Cm C / C Etc., Complete Complying With Standard Spefication As Directed By Departamental Officerstndss No: 30& 86 Plain Surface 5 Reinforced Cement Concrete 1:11 / 2:3 ( One Cement One And Half Sand And Three Aggregate ) Using 20Mm Size I.S.S Metal Including Cost Conveyance Of Materials To Site And All Labour Chages Etc., Mixing Laying Consolidating Curring Etc., But Excluding Cost Of Steel Etc., Complete As Per Standard Specification Tndss No: 30 V. Vi ( S3 ) Vii-3 6 Brick Work In Cement Mortar 1:5 ( One Cement Five Sand ) Mix Using Country Bricks Of Size 8-3 / 4X4 1 / 4 X2 3 / 4 Including All Cost And Conveyance Of All Materials As Per Standard Specification Tndss No: 31 & Similar To 31C V, Vi ( S5 ) Vii 7 Plastering With Cement Mortar 1:5 ( One Cement Fivesand ) Mix 12Mm Thick Including Cost And Conveyance Of All Materials To Site, Loading And Unloading Charges And Labour Charges For Mixing Laying And Curing Etc Complete Complying With Std Specification Tndss No: 56 & 57 8 Plastering With Cement Mortar 1:3 ( One Cement Threesand ) Mix 10Mm Thick Including Cost And Conveyance Of All Materials To Site, Loading And Unloading Charges And Labour Charges For Mixing Laying And Curing Etc Complete Complying With Std Specification Tndss No: 56 & 57 9 Supply, Fabrication And Fixing Of Msdoor Using Ms Angle And Sheet Of Approved Quality With One Coat Of Red Oxide Primer Including Cost And Conveyance Of All Materials And Labour Charges To Site Etc., And Complete 10 Painting With Twocoatswith Weather Sealedexterior Emulsion Paint As Instructed By The Departmrntal Officers Includingpreparation Of Surface Curing, Etc Complete In All Floorscomplying With Standard Specification. ( The Colour And Shade Of The Paint Shall Be Got Approved By The Departmental Officers. ) 11 Painting New Iron Works Such As Steel Doors, Windows, Ventilators, Window Bars, Balustrades Etc., With Two Coats Of Best Approved First Quality And Colour Of Synthetic Enamel Paint Over The Existing Red Oxide Priming Coat In All Floors Excluding Cost Of Priming Coat Etc., Complete Complying With Standard Specification. ( The Make, Quality And Colour Of Paint Should Be Got Approved By The Executive Engineer 61 V, Vi ( S4 ) 3 12 Drilling Of Borewell Of 6 Dia Requiring Less Than4 Hours Operation Using Drill Rods / Hose With Requiredsize Of Pipes For Various Capacity Compressor Includingtransportation, Labour, And Fuel Charges For Compressorstransportation, Labour, And Fuel Charges For Compressorsas Directed By The Twad Officer And Conducting Yieldtransportation, Labour, And Fuel Charges For Compressors 13 Supply Of Casing Pipe 6Kg / Cm2 Including Cost And Conveyance Of All Materials And Labour Charges To Site Etc., And Complete 14 Supply Of 1.5Hp Motor Including Cost And Conveyance Of All Materials And Labour Charges To Site Etc., And Complete 15 Supply Of 1.5Hp Panel Bord Including Cost And Conveyance Of All Materials And Labour Charges To Site Etc., And Complete 16 Supply Of Pvc Andgipipe Including Cost And Conveyance Of All Materials And Labour Charges To Site Etc., And Complete 32Mmgipipe 17 32Mm Gicoupling 18 32Mm Pvcbend 19 32Mm Gm Gatevalue 20 Ms Bore Cover 21 Ms Clamp Set 22 2.5 Sqmm 3 Core Flat Cable 23 25Mm Pvcpipe 24 Woodern Board0.60X0.45 25 16Ams Dpic Main 26 20Mm Pvc Pipe 27 20Mm Pvc Elbow 28 20Mm Waste Not Tap 29 1000Litpvc Tank 30 90Mm Die Pipe 31 90Mm Diebend 32 90Mm Die Tee 33 90Mm Dieelbow 34 80Mm Die Gate Valve 35 Laboar Charges For The Erection Of Submersible Pumpset In Borewell Including Fixing Jointing Submersible Cable With Proper Clamps Up To Starter To Required Depth Ande Also Fixing Of Riser Pipes To The Recquired Depth Valves Erection Clamps, Pressure Gauges Upto The Exterior Wall Of Pump Room And Erection Of Panel Board Consisting Of Tpicn Switches Starter, Voltmeter, Ammeter, Three Pilot ( Indicating ) Lamps Capacitor Single Phasing Preventor, Water Level Guard And Laying And Jointing The Cables And Twin Earthing As Per Ie Rules Etc., Complete And Testing The Pumpset And Trail Run For 10 Days 36 Geo Physical Survey Report For Conducting Water Level Testing ( Minimum 3 Location )