Tender For Work Contract For Erection And Dismantling Of Dt, Structure, Pillar, Heightening Of Pillar Box- Laying Of Ht & Lt Cable Towards Improvement, Extension , Dcw Works And Allied Works- In Respect Of Mylapore Division Of Cedc/Central - For A Period
Tender Overview
Project Description
Work Contract For Erection And Dismantling Of Dt, Structure, Pillar, Heightening Of Pillar Box- Laying Of Ht & Lt Cable Towards Improvement, Extension , Dcw Works And Allied Works- In Respect Of Mylapore Division Of Cedc / Central - For A Period Ofone Year Or Exhaustion Of Amountwhichever Is Earlier
BOQ
| Sl. No. | Item Description |
| 1 | ERECTION OF DISTRIBUTION TRANSFORMER STRUCTURE |
| 2 | Excavation of Structure Pole Pit 2x3x1/6 th of height |
| 3 | Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole |
| 4 | Transporting of 9.14 m poles from Road side to pole pit |
| 5 | Structure pole mass Concreting and coping 0.6x0.6x1.65 for DP structure Including cost of materials and cement. |
| 6 | Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.DPDC channel, T.I. Fitting etc., in complete. |
| 7 | Erection of HG fuse set with transport |
| 8 | Erection of 11 KV AB switch complete setwith transport |
| 9 | Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt |
| 10 | Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for DP Structure |
| 11 | For Triple Pole and four pole structure |
| 12 | Erection of H.T. jumpering in DP structure complete |
| 13 | Erection of H.T. LAS |
| 14 | Erection of DT excluding loading and unloading |
| 15 | Upto 100 KVA |
| 16 | Above 100 KVA |
| 17 | Painting of two coats of Aluminium paints for DP structure and iron materials including cost of paint and distemper etc. |
| 18 | Loading and unloading of Distribution Transformer at site and store. |
| 19 | Dismantling ofDT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) |
| 20 | Upto 100 KVA |
| 21 | Above 100 KVA |
| 22 | Crane hire charges |
| 23 | LAYING OF HT CABLE |
| 24 | Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., |
| 25 | Normal Road (earth) |
| 26 | Tar Road |
| 27 | Concrete Road |
| 28 | Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. |
| 29 | 3x300 sq mm XLPE (1 drum: 200 m) |
| 30 | 3x120 sq mm XLPE (1 drum: 200 m) |
| 31 | LAYING OF HT CABLE |
| 32 | Laying of 300 sq mm XLPE cable |
| 33 | Laying of 120 sq mm XLPE cable |
| 34 | Provision of HUME /PVC Pipe at a depth of 3 Mtrs |
| 35 | Excavation of 11KV straight joint pit |
| 36 | Provision of cable joint |
| 37 | Covering HT cable by cement \"V\" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size onthe trough |
| 38 | Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. |
| 39 | Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 empty drums) |
| 40 | LAYING OF LT CABLE |
| 41 | Tansport of LT cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. |
| 42 | 240 sq.mm ( 1 drum - 200 m) |
| 43 | 120 sq. mm ( 1 drum - 500 m) |
| 44 | 25 sq. mm ( 1 drum - 500 m) |
| 45 | 16 sq. mm ( 1 drum - 500 m) |
| 46 | Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. |
| 47 | Normal Road (earth) |
| 48 | Tar Road |
| 49 | Concrete Road |
| 50 | LAYING OF LT CABLE |
| 51 | Laying of 240 sq.mm cable |
| 52 | Laying of 120 sq.mm cable |
| 53 | Laying of 25 sq.mm cable |
| 54 | Laying of 16 sq.mm cable |
| 55 | Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. |
| 56 | ERECTION OF PILLAR BOX |
| 57 | Erection of pillar boxincluding excavation of foundation pits as per standard specification, constructing 2 Nos pillar walls, Coping and earthing the pillars up to and above 0.6 met from ground level including cost of all materials like bricks,cement,sand etc, cost of labours, lead, lift complete etc including transport. |
| 58 | 4w/6w/8w/HRC Pillar Box |
| 59 | Mini pillar box |
| 60 | HRC for smart city |
| 61 | Cleaning, painting with Aluminium paint 2 coats & Numbering pillar box with feeder details. (Estimate sanction mandatory) including cost of all materials |
| 62 | 4w/6w/8w/HRC Pillar Box |
| 63 | Mini pillar box |
| 64 | DISMANTLING OF PILLAR BOX |
| 65 | Dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. |
| 66 | 4/6/8 way pillar box/HRC pillar Box |
| 67 | Mini pillar box/HRC pillar Box |
| 68 | Manufacturing of M.S.Clamps |
| 69 | 50 x 8 mm flat |
| 70 | 65 x 10 mm flat |
| 71 | Alteration of existing M.S.Clamps suitable for the works |
| 72 | 50 x 8 mm flat |
| 73 | 65 x 10 mm flat |
| 74 | Erection of 11KV centre rotating AB Switch complete set |
| 75 | Erection of 33KV Centre rotating AB switch complete set |
| 76 | Loading of metering set at stores & Unloading at work spot & vice versa |
| 77 | Erection of Metering set |
| 78 | Dismantling of 9.14 m poles for reuse |
| 79 | Erection of cross Bracing set @ 10\" center |
| 80 | Erection of Top channels@ 10\" center |
| 81 | A).Loading of poles |
| 82 | 9.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each |
| 83 | B).Un Loading of poles |
| 84 | 9.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each |
| 85 | ERECTION OFSINGLE POLEDTSTRUCTURE |
| 86 | Loading andunloading of RCC 9 / 9.14 mtrSquare Pole |
| 87 | Excavation ofpole pit for 3\" x 3\" x 6\"size |
| 88 | Erection of RCC 9 / 9.14 mtrSquare Pole including base plate erection. |
| 89 | Loading , unloading and erection ofDT |
| 90 | Excavation of stay Pit for 2\" x 2\" x 6\" size |
| 91 | Erection of stay set complete including base plate |
| 92 | SINGLE POLETransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt ,Fixing of earth connections with GI wire , bolt and Nuts. |
| 93 | Erection ofTransformerStructure materials |
| 94 | Erection of HG fuse set |
| 95 | Erection of 11 KV AB switch complete set |
| 96 | Provision of Mass concreting of pole with cement , sand and jelly |
| 97 | Erection of H.T. LAS |
| 98 | Erection of L.T. LAS |
| 99 | Erection of H.T. jumpering in DT structure complete |
| 100 | Erection of L.T.Open type fuse unit including cable jumpering complete set. |
| 101 | Heightening of 4 way, 6 wayPillar Boxes:(Water logging area) |
| 102 | H(80cms)xL(82cm)xW(72cm) size pedestal of Grade-M-20 with steel reinforcement 8mm and 6 mm ring, GI Bolt, Colour, Primer, sticker and paint for pedestal |
| 103 | Pedestal loading, transport from manufacturing site, and unloading. |
| 104 | Removing the cable from existing 4 way pillar box |
| 105 | Existing 4 way pillar box dismantling |
| 106 | Breaking the existing dismantled pedestal |
| 107 | Clearing the debris |
| 108 | Erection of new pedestal and 4 way pillar box |
| 109 | Reconnecting the cables with 4 way pillar box including all materials like core sleeve, lugs, line connector, insulation tapes etc excluding cable and sleeve kit box |
| 110 | Painting the 4 way pillarbox with Asian grey paint |
| 111 | Heightening of Mini Pillar Boxes:(Water logging area) |
| 112 | H(80cms)xL(70cm)xW(50cm) size pedestal of Grade-M-20 with steel reinforcement 8mm and 6 mm ring, GI Bolt, Colour- Primer, sticker and paint for pedestal. |
| 113 | Loading, Transport from Manufacturing site and unloading |
| 114 | Removing the cable from existing mini pillar box |
| 115 | Existing mini pillar box dismantling |
| 116 | Breaking the existing dismantled pedestal |
| 117 | Clearing the debris |
| 118 | Erection of new pedestal and mini pillar box |
| 119 | Reconnecting the cables with mini pillar box including all materials like core sleeve, lugs, line connector, insulation tapes etc excluding cable and sleeve kit box |
| 120 | Painting the pillar box with Asian grey paint |
| 121 | Raising of Pillar Boxes |
| 122 | Raising of 4W,6W , 8W Pillar boxes |
| 123 | Raising of Mini Pillar boxes |
| 124 | Fixing of Mini pillar door with pad lock,hinges-2 Nos (including cost of material) |
| 125 | a. Labour charges for welding,painting and earthing of 4w and 6w pillar |
| 126 | b.Removing and refixing of LT cables in pillar boxes(4w&6w) |
| 127 | Erection of AB switch alone for DP Switch |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender