}

Tender For Annual Maintenance Rate Contract For Repairs /Replacement Of Damaged Spare Parts Including Scheduled Servicing (As And When Required) Of Various Departmental Vehicles) Of Tata Make, Srinagar-Jammu And Kashmir

Department Of Housing And Urban Development has published Tender For Annual Maintenance Rate Contract For Repairs /Replacement Of Damaged Spare Parts Including Scheduled Servicing (As And When Required) Of Various Departmental Vehicles) Of Tata Make. Submission Date for this Tender is 08-11-2023. Forming Tools Tenders in Srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

40392050
Tender For Annual Maintenance Rate Contract For Repairs /Replacement Of Damaged Spare Parts Including Scheduled Servicing (As And When Required) Of Various Departmental Vehicles) Of Tata Make
Open Tender
Indian
Jammu And Kashmir
Srinagar
08-11-2023

Tender Details

Annual Maintenance Rate Contract For Repairs /Replacement Of Damaged Spare Parts Including Scheduled Servicing (As And When Required) Of Various Departmental Vehicles) Of Tata Make-1 Departmental Vehicle bearing No. JK01AG-6651 (TATA 407) 2 Schedule Servicing:- The job shall include providing and filling of POLs and spares as and when required 3 Providing and Filling Engine oil grade 20 w 40 4 Providing and Fitting Oil filter 5 Providing and Fitting Fuel filter (water separator) 6 Providing and Fitting Air cleaner element. Primary 7 Providing and Fitting Air cleaner element. Secondary 8 Providing and Fitting Water body Assembly 9 Providing and Fitting Gear oil Change 80 W 90 10 Providing and Filling Hydraulic oil 68 Grade 11 Providing and Filling steering oil 12 Providing and Fitting steering oil filter 13 Repair/ replacement of turbo repair kit 14 Brake booster kit Providing and Fitting: The job shall include dismantling of the brake boosters form the Truck and taking the same to the workplace of the contractor. Thereafter, the job shall include further dismantling the brake boosters ascertaining of the faults. Further the chambers of the booster be taken over the machine and the chambers be finished to the required size .Further the requisite new brake booster kits be fitted if required. Assembling back the chambers to the booster assembly and bring the same to the workshop for further fitment to the machine to check for the proper functioning ( Front Wheel) 15 Brake booster kit Providing and Fitting: The job shall include dismantling of the brake boosters form the Truck and taking the same to the workplace of the contractor. Thereafter, the job shall include further dismantling the brake boosters ascertaining of the faults. Further the chambers of the booster be taken over the machine and the chambers be finished to the required size .Further the requisite new brake booster kits be fitted if required. Assembling back the chambers to the booster assembly and bring the same to the workshop for further fitment to the machine to check for the proper functioning (Rear Wheel) 16 Propeller Shaft:- Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 17 Machining job of the Propeller shaft along with providing and fitting of Universal Joint and clamps The job includes dismantling of propeller shaft from the Vehicle at site and the propeller shaft be taken to the contractor’s workplace for further execution of job over the Lathe machine. During machining, torsions needs to be checked thoroughly and rectified. Both the ends of the propeller shaft may need cutting. A new half yoke be fitted by way of welding along with a new universal joint and cross holder .The alignment of the assembly be finished and checked over the lathe machine once again. The spares once fitted and assembled need to be checked over Lathe machine to ensure the zero error before proceeding further .After the job is complete the same needs to be carried back to the site for further fitment to the machine,. The tipper needs to be tested thoroughly after fitment for ascertaining the quality of the job. 18 U-J Cross 19 Cross Holder 20 Coupling 21 Half Yoke 22 Central Bearing with rubber Assembly Complete 23 Shaft Bolts with Nuts and Washer. 24 Main brake booster pipe 25 Clutch Plate 26 Pressure plate 27 Clutch Release Bearing. With Hub 28 Fly Wheel Ring 29 Fly Wheels Bolts 30 Turbo charger repair 31 Suspension System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 32 Augmentation of Leaf Springs(Rear): The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. 33 Re-Arching of the existing for rear suspension : The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. 34 Augmentation of Leaf Springs (Front): The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. 35 Re-Arching of the existing for rear suspension : The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. 36 Providing and fitting of leaf springs and allied spares as per requirement 37 Auxillary Rear Leaf 38 Leaf Spring Clamps 8 39 Leaf Spring Clamps 5 40 Leaf Spring rivets 41 Leaf Spring Bush 42 Centre Bolt 43 Gear Box Bolt 44 Tappet Cover Gasket 45 Leaf Spring Bolt 46 Leaf Spring Cotter 47 U-Bolt 18 48 Wheel System :-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 49 Front Wheel oil seal 50 Tie Rod Ball Set 51 F/W Bearings. Inner 52 F/W Bearings. Outer 53 Front brake lining sets 54 Rear brake lining sets 55 Slack Adjuster Automatic 56 Real wheel oil seal 57 R/w Bearings. Inner 58 R/w Bearings. Outer 59 Wheel Cam bush 60 Wheel Cam oil Seal 61 Fuel Injection Pump:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 62 Complete overhauling of the Fuel Injection Pump alongwith nozzles.The job shall comprise taking of the dismantled fuel pump assembly alongwith nozzles from the workshop and examining the same for further job to be executed. It shall further checked for the damaged/worn out spares for replacements, comprising ,Element Set(01 Set of 04 Nos),Delivery Valve(01 Set of 04 Nos),Complete Nozzle set replacement(06 Nos),Taper Roller bearing(01 Set),Nozzle Cups(06 Nos),Cross Disc(01 No),T quadrant(02 Nos) and Camplate(01 No).Upon replacement of the mentioned spares the Fuel Pump shall be assembled and tested for the proper atomisation in order to have the correct fuel to the fuel injector in correct timing and the accurate metered amount of fuel with sufficient pressure from the nozzles over the Diesel Pump testing machine.Once the job gets completed,the Fuel Pump shall be brought back to workshop for further fitment to the Truck.The job shall get executed by a highly skilled proffesional only. 63 Nozzle 64 Steering System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 65 Steering. Cross 66 Self starter :-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 67 Armature Assembly 68 Self Carbon bush set 69 Self bearing 70 Bendex Drive 71 Solenoid Switch 72 Field Coil Set 73 Battery Lead 8 AWG gauge multistrend with copper Thimbles and terminals etc. Both negative and positive 74 Re-building of battery poles. 75 Ignition switch 76 Alternator Assembly:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 77 Rectifier plate 78 Carbon Bush Set 79 Cut out 80 Armature Assembly 81 Armature Bearing 82 Silencer:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 83 Joint & Bolts 84 Silencer Gas Welding and Patching 85 Radiator Assembly;-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 86 Radiator Cup 87 Hose pipe Sets upper & lower with Clamps 88 Radiator Leakage Arrest by way of soldering, carbon leakage testing, cleaning of radiator cooling fins & servicing. Besides the job shall include dismounting & remounting of radiator by way of engaging of skilled machanic on the job. 89 Electrical Works:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 90 New T-Horn Assembly 91 Head Light Assy. 92 Head Light bulb 93 Tail light bulb 94 Indicator bulb 95 Tail light Assy 96 Cab. Light 97 Side Indicator Assy. 98 Combination Switch. 99 Ignition switch 100 Brake System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 101 Brake Front & Rear Cylinder Assy. 102 Master Cylinder 103 Front & Rear Brake Cam 104 Air Pressure Pipes 105 Brake pipe 106 Diaphagram Washer of Brakes 107 Window Glasses and Front wind shield:-Scope of work shall include Providing and fitting of damagedwind screen along with beading with new one as per details below (triplex laminated) 108 Front Glass/Wind Shield Triplex laminated with rubber beeding and other allied fittings 109 window Glass Right 110 Window Glass Left 111 Fan Belt set 112 TATA Xenon & TATA Yodha 113 Scope of work: Maintenance Rate Contract for repairs/replacement of damaged spare parts including scheduled servicing (as and when required) of departmental (Pickup) vehicles of following details:Make: TATA Model: Xenon & YodhaYear of manufacturing: 2020 & 2022The job includes disassembling, removal of damaged/worn out/outserviced items and reassembling after replacement by new one. the job includes P/F of the following items 114 Schedule servicing 115 Moil grade 20w40 (6 liters per service) 116 P/F of Oil filter 117 P/F of Fuel filter element delphi 118 P/F of Fuel pre- filter element 119 P/F of Air cleaner element. 120 P/F of Gear oil Change 80W90 (10 liters per service) 121 P/F of Brake fluid (Dot-4).250 ML 122 P/F of Power steering fluid 500ml 123 Clutch system 124 Replacement of damaged Clutch plate by new one 125 Replacement of damaged Pressure plate by new one 126 Replacement of Clutch release bearing 127 Replacement of Clutch oil seal 128 Replacement of Clutch cable 129 Suspension system 130 Replacement of Front wheel inner bearing 131 Replacement of Front wheel outer bearing 132 Replacement of Front wheel oil seal 133 Replacement of Steering Tie rod end 134 Replacement of Steering centre pin bush 135 Replacement of Steering Ball joint 136 Replacement of Complete suspension bush kit 137 Replacement of Rear brake shoe set (set of 2 pairs) 138 Replacement of Rear brake wheel cylinder 139 Replacement of Rear wheel bearing 140 Replacement of Disc pad set 141 Replacement of Calliper set 142 Replacement of Brake fluid 200ml 143 Replacement of Providing/fitting of disc rotor 144 Replacement of Providing/fitting of front breake disc pads 145 Providing of skilled mechanic shall capable to hadle all kinds of mechanical automobile jobs included providing of tools & tackels required for thr job. 146 Silencer 147 Repairs to silencer by way of gas welding the job included dismounting & remounting of silencer 148 Silencer tail pipe 149 Electrical system 150 Replacement of Alternator cut out 151 Replacement of Alternator rectifier plate 152 Replacement of Alternator bearing 153 Replacement of Alternator brush set 154 Replacement of Fan belt 155 Self starter. 156 Replacement of Self bush 157 Replacement of Self bearing 158 Replacement of Solenoid switch 159 Replacement of Battery 80 AH 160 Replacement of Battery terminal and thimbles & rebuilding of battery Poles 161 Replacement of Head light assembly 162 Replacement of Side indicator assembly 163 Replacement of Back light assembly 164 Replacement of Horn assembly 165 Replacement of Back light bulb 166 Replacement of Side indicator bulb 167 Replacement of Horn relay / Horn 168 Replacement of Wiper blade set 169 Replacement of Wiper arm set 170 Body side 171 Replacement of Door handle ( Outside ) 172 Replacement of Door handle ( Inside ) 173 Replacement of Door trim 174 Replacement of Door glass sliding handle 175 Replacement of Door lock 176 Replacement of Side mirror (L/R) 177 Repairing of damaged body by way of Welding/denting/painting of various spots on the body 178 Providing & fixing of back carriage seating arrangement by way of fabrication of MS frame work, which includes P/F of 19 mm laminated ply board,foam with synthetic/letherite leatherThe following items are rquired for the job:i) MS frame work: =50 mm dia,3.6 thick MS pipe =10 meters =35x35x4mm equal angles =19 meters =35x3mm MS flats =06 meters =4 mm thick MS flat =02 Sq.ft = 50 mm dia MS Bends =04 Nosii) 19 mm Waterproof Ply: =3.0no x 4.0 x 0.30 Sq.m =3.6 Sq.miii) Foam & letherite as per requirement for the dimensions reflected for item iii above. The is inclusive of cutting, welding, finishing, fixing and nuts & bolts and all other allied jobs required for completion of the job. providing of rear glass protection grill of 1 inch sq square mesh with 2mm wire dia. the job also includes applying of red oixde prime coat & 2 coats of paints. to all MS structures 179 Providing & fixing of seat covers for seats of cabin front & rear side. The seat covers shall be made out of high density velvet cloth in desired shade as directed. The seat cushion shall be as per size of the seats fixed with necessary clips etc. 180 Suspension System 181 Replacement of leaf spring U bolts( Rear) 182 Replacement of leaf spring centre bolt( Rear) 183 Shakel pin/bolt ( Rear) 184 Replacement of leaf spring clip with bolt( Rear) 185 Steering System 186 Wheel alignment 187 Differential 188 Differential Assembly 189 Bevel and Pinion Gear 190 Star Gear 191 Star set 192 Replacement of Diff. Stud 193 Replacement of U-J Cross 194 Replacement of Cross Holder 195 Replacement of Coupling 196 Replacement of Central Bearing. Assembly Complete 197 Departmental Sewer cleaning Machine (TATA) 198 Schedule Servicing:- The job shall include providing and filling of POLs and spares as and when required 199 Providing and Filling Engine oil grade 20 w 40 200 Providing and Fitting Oil filter + Bosh 6D 2525-181-30139 201 Providing and Fitting Fuel filter (water separator) 2527-091-20259 202 Providing and Fitting Air cleaner element. Primary 2786-091-39908 203 Providing and Fitting Air cleaner element. Secondary 2786-091-39909 204 Providing and Fitting Water body Assembly 205 Providing and Fitting Gear oil Change 80 W 90 206 Providing and Filling Hydraulic oil 68 Grade 207 Propeller Shaft:- Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 208 Machining job of the Propeller shaft along with providing and fitting of Universal Joint and clamps The job included dismantling of propeller shaft from the vehicle at site and the propeller shaft was taken to the contractor’s workplace for further execution of job over the Lathe machine. During machining, torsions were checked thoroughly and rectified. Both the ends of the propeller shaft were cut. A new half yoke was fitted by way of welding along with a new universal joint and cross holder .The alignment of the assembly was finished and checked over the lathe machine once again. The spares once fitted and assembled were checked over Lathe machine to ensure the zero error before proceeding further .After the job is complete the same was carried back to the site for further fitment to the machine,. The machine was tested thoroughly after fitment for ascertaining the quality of the job. 209 U-J Cross 210 Cross Holder 211 Coupling 212 Half Yoke 213 Central Bearing with rubber Assembly Complete 214 Shaft Bolts with Nuts and Washer. 215 Main brake booster pipe 216 Clutch Plate 217 Pressure plate 218 Clutch Release Bearing. With Hub 219 Fly Wheel Ring 220 Fly Wheels Bolts 221 Suspension System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 222 Augmentation of Leaf Springs(Rear): The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 223 Re-Arching of the existing for rear suspension : The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 224 Augmentation of Leaf Springs (Front): The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 225 Re-Arching of the existing for Front suspension : The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 226 Re-Arching of the existing for rear suspension : The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 227 Wheel System :-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 228 Front Wheel oil seal 229 Tie Rod Ball Set 230 F/W Bearings. Inner 231 F/W Bearings. Outer 232 Front brake lining sets 233 Rear brake lining sets 234 Slack Adjuster Automatic 235 Real wheel oil seal 236 R/w Bearings. Inner 237 R/w Bearings. Outer 238 Wheel Cam bush 239 Wheel Cam oil Seal 240 Fuel Injection Pump:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 241 Complete Overhauling /calibration, including replacement of worn out/ necessary items 242 Rotary Pump Unit 243 Nozzle 244 Steering System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 245 Steering. Cross 246 Steering. Oil 247 Steering filter 248 Self starter :-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 249 Armature Assembly 250 Self Carbon bush set 251 Self bearing 252 Bendex Drive 253 Solenoid Switch 254 Field Coil Set 255 Battery Lead 8 AWG gauge multistrend with copper Thimbles and terminals etc. Both negative and positive 256 Battery 12 volts 180AH 257 Re-building of battery poles. 258 Ignition switch 259 Alternator Assembly:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 260 Rectifier plate 261 Carbon Bush Set 262 Cut out 263 Armature Assembly 264 Bearing 265 Silencer:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 266 Joint & Bolts 267 Silencer Gas Welding and Patching 268 Radiator Assembly;-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 269 Radiator Cup 270 Hose pipe Sets upper & lower with Clamps 271 Radiator Leakage Arrest by way of soldering, carbon leakage testing, cleaning of radiator cooling fins & servicing. Besides the job shall include dismounting & remounting of radiator by way of engaging of skilled machanic on the job. 272 Electrical Works:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 273 New T-Horn Assembly Double 274 Head Light Assy. 275 Head Light bulb 276 Tail light bulb 277 Indicator bulb 278 Tail light Assy 279 Cab. Light 280 Side Indicator Assy. 281 Combination Switch. 282 Ignition switch 283 Brake System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 284 F/W Brake Lining Set with Rivets 285 Rear/W Brake Lining Set with Rivets 286 Brake Front & Rear Cylinder Assy. 287 Master Cylinder 288 Front & Rear Brake Cam 289 Air Pressure Pipes 290 Brake pipe 291 Diaphagram Washer of Brakes 292 Window Glasses and Front wind shield:-Scope of work shall include Providing and fitting of damagedwind screen along with beading with new one as per details below (triplex laminated) 293 Front Glass/Wind Shield with rubber beeding 294 window Glass Right 295 Window Glass Left 296 Fan Belt set 297 JETTING SYSTEM:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 298 Overhauling, repairs & replacement of spares of jetting reciprocating pumps of sewer cleaning machines of serial no 79/14 & 81/14 Pump type D6.5/20 WASP PUMP PRIVATE LTD.The job shall included dismounting & remounting of complete pump from the machine dismantalling there of, replacement of all damaged/worn out spares to keep the pump operational complete. 299 VACUUM PUMP SYSTEM:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 300 Repairs to Sucking pump make Battioni Pagani (CE) sorbolo (parma) Itali Mec 13500 P LF DX D100 .Sno 448871 & 448370 year 2014.Mx. Pressure 1.5 (bar), Vaccuum-0.95, power(kw) 36 , Reves (rpm) 1400 , Capacity (1/min) 13845, weight (g) 164. of sewer cleaning machine bearing no 0772-JK01AB & 6145-JK01AB, The job shall include dismounting of complete suction pump from the machine, Shifting to work shop of contracting agency dismantalling thereof. The jo0b shall included replacement of all damaged spares viz, bearing 02no, fiber blades, o-rings, copper pipe with adopter, oil seal & gasket kit complete job.Besides the job shall further includefinshing of uneven bore suface of suction pump by way of grinding, honing & polishing finishing of rottor bearing seats by way of machineing job.Re-assembling & remounting of sucker pump on machine after caried out necessary repairs, checking the performance of pump unit on full load. 301 Providing & fixing of PTO electronuematic valve 24 volt. 302 Ball valve (jetting pipe)25mm dia of SS/GM material in single piece, heavy duty, shall working pressure 3000 /4000 bar maximum pressure of CIM make or any other reputed make as per the sample.. 303 Welding repairs to tank buffer wall by way of providing & fixing of 6 mm MS plate ISA 32/50 mm/as per site requirment. The job shall furhter include straighten, bending, cutting, hosting & welding complete job, applying two coats of red oxide coat after preparing the surface smooth by way of using of grinder, emaray paper etc. 304 Repairs to high pressure jetting pipe p/f of end joints /connections & adopters crimping collers as per sample hydraulically/electrically operated crimping machine to the HP- jetting hose 25mm ID with working pressure 3000PSI sewer cleaning machine. 305 Providing & fixing of jetting hose pipe 25mm inner dia 1 mt long with end connections. Working pressure 3000 bar /PSI. 306 Providing & fixng of (Sewer sucking pipe) 100 mm dia, wire braided synthatic rubber/PVC material with high suction resistance 4.5 mt long included providing & fixning of end fitting/ coupling & decoupling system for quick operation as per sample. 307 Providing & fixing of tempered wind screen (laminated) 5 mm thick for the vehicles.The job shall included providing of all fitting materials to the frame for fixing of glass, which includes replacement of damaged rubber beading. 308 Providing & fixing of transparent 5 mm thick glass for windows for cabin .The job shall included providing of all fitting materials to the frame for fixing of glass, which includes replacement of damaged rubber/aluminium beading.

Key Value

Document Fees
INR 500 /-
EMD
INR 10000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail