Public Works Department-PWD has published General-Investigation Work To Kondayur Cheerakuzhi Canal Bridge-Investigation Work To Kondayur Cheerakuzhi Canal Bridge-Investigation Work-Reconstruction Work. Submission Date for this Tender is 04-11-2023. Bridge Work Tenders in thrissur Kerala. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Investigation work |
2 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring |
3 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. |
4 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. |
5 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. |
6 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. |
7 | 56.3.d.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. |
8 | 56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land |
9 | 56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. |
10 | 56.7:Conducting standard penetration test in bore hole at any depth. |
11 | 56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code. |
12 | 56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. |
13 | 56.14.b:Cross sectional details - Thodu. |
14 | 56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes. |
15 | 56.15.b:Hydraulic Velocity Calculation - Thodu. |
16 | 56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers. |